| Stationary Lane Closure with a Two-Way Left Turn Lane || style="text-align:center;" | [https://epg.modot.org/forms/general_files/TS/Typical_Applications/TA-30STWLTL.pdf TA-30STWLTL] ||style="text-align:center;" | 616.8.30STWLTL || style="text-align:center;" | 9-15-23
| Stationary Lane Closure with a Two-Way Left Turn Lane || style="text-align:center;" | [https://epg.modot.org/forms/general_files/TS/Typical_Applications/TA-30STWLTL.pdf TA-30STWLTL] ||style="text-align:center;" | 616.8.30STWLTL || style="text-align:center;" | 9-15-23
| Stationary Work in the Vicinity of an Entrance Ramp || style="text-align:center;" | [https://epg.modot.org/forms/general_files/TS/Typical_Applications/TA-44S.pdf TA-44S] ||style="text-align:center;" | 616.8.44S || style="text-align:center;" | 9-15-23
| Stationary Work in the Vicinity of an Entrance Ramp || style="text-align:center;" | [https://epg.modot.org/forms/general_files/TS/Typical_Applications/TA-44S.pdf TA-44S] ||style="text-align:center;" | 616.8.44S || style="text-align:center;" | 9-15-23
616.8.1 Temporary Traffic Control for Contract Plan Sheet Development
Each work zone is different and requires different temporary traffic control (TTC) plans. For contract plan sheets, MUTCD (2009) Chapter 6H, provides the typical applications (TA) to develop TTC plans and for in-field modifications as directed by the engineer. TAs should be altered, when needed, to fit the conditions of the specific work zone. See EPG 237 for additional plan sheet guidance.
References to work vehicle or shadow vehicle made in the MUTCD will be considered incidental and should be left off TTC plans.
When optional items are referenced in the MUTCD, the contractor may at their discretion utilize the items as incidental, unless they have been added to the TTC plans as a requirement, and applicable pay items will apply. Field adjustments as determined by the engineer will result in adding the pay items via a change order.
616.8.2 Temporary Traffic Control for MoDOT Employees
These TAs are intended for the use of MoDOT employees. Before each work shift, all employees are required to participate in a pre-shift safety briefing. During the briefing, the applicable TAs should be printed out and then discussed to know the procedures to follow for the day’s work. This should include the risk-based assessment (RBA). The TAs shown in the EPG are considered current.
1 Speed limit is based on posted speed limit. 2 Taper lengths may be adjusted to accommodate crossroads, curves, intersections, ramps or other geometric features. 3 Channelizer spacing may be reduced to discourage traffic encroachment. 4 Based on 10 ft. shoulder width. 5 Based on 12 ft. lane width. 6 Spacing reduced to 1/2 at intersections. 7 Spacing may be reduced to 1/2 at intersections.