<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epgtest.modot.org/index.php?action=history&amp;feed=atom&amp;title=237.12_Communication_with_the_Public</id>
	<title>237.12 Communication with the Public - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epgtest.modot.org/index.php?action=history&amp;feed=atom&amp;title=237.12_Communication_with_the_Public"/>
	<link rel="alternate" type="text/html" href="https://epgtest.modot.org/index.php?title=237.12_Communication_with_the_Public&amp;action=history"/>
	<updated>2026-04-30T07:12:48Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epgtest.modot.org/index.php?title=237.12_Communication_with_the_Public&amp;diff=51190&amp;oldid=prev</id>
		<title>Smithk: updated broken link</title>
		<link rel="alternate" type="text/html" href="https://epgtest.modot.org/index.php?title=237.12_Communication_with_the_Public&amp;diff=51190&amp;oldid=prev"/>
		<updated>2022-02-18T17:18:07Z</updated>

		<summary type="html">&lt;p&gt;updated broken link&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 12:18, 18 February 2022&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l3&quot;&gt;Line 3:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is imperative to strictly limit all information communicated to the public (especially the contractors) concerning the engineer’s estimate and the bids received during a bid opening.  Certain information disclosed to the public, during the bid opening process, could compromise MoDOT’s actions.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is imperative to strictly limit all information communicated to the public (especially the contractors) concerning the engineer’s estimate and the bids received during a bid opening.  Certain information disclosed to the public, during the bid opening process, could compromise MoDOT’s actions.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;From the date a project is included in the notice of bid opening to the date of the Commission action concerning award or rejection of bids, questions of any kind concerning a project must be directed to the contact person specially named in the bidding proposal for the project.  The district contact person may answer questions by referencing the appropriate part of the plans or specifications.  Questions that require clarification or interpretation of the plans or specifications shall not be answered directly, but must be referred to [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;wwwi&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;design&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;default.htm &lt;/del&gt;Design] to conclude whether an addendum is to be sent to all bidders.  It is paramount all bidders have the same information from which to prepare a bid.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;From the date a project is included in the notice of bid opening to the date of the Commission action concerning award or rejection of bids, questions of any kind concerning a project must be directed to the contact person specially named in the bidding proposal for the project.  The district contact person may answer questions by referencing the appropriate part of the plans or specifications.  Questions that require clarification or interpretation of the plans or specifications shall not be answered directly, but must be referred to [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;modotgov.sharepoint.com/sites&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;DE&lt;/ins&gt;/ Design] to conclude whether an addendum is to be sent to all bidders.  It is paramount all bidders have the same information from which to prepare a bid.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;During the period of time between the opening of bids and the Commission meeting, the only statement a MoDOT employee can give to anyone is, “The award or rejection of bids cannot be discussed until after the Commission takes action.”  This direction also applies to consultant employees preparing a project for MoDOT.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;During the period of time between the opening of bids and the Commission meeting, the only statement a MoDOT employee can give to anyone is, “The award or rejection of bids cannot be discussed until after the Commission takes action.”  This direction also applies to consultant employees preparing a project for MoDOT.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:237 Contract Plans]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:237 Contract Plans]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epgtest.modot.org/index.php?title=237.12_Communication_with_the_Public&amp;diff=14491&amp;oldid=prev</id>
		<title>Smithk: article construction</title>
		<link rel="alternate" type="text/html" href="https://epgtest.modot.org/index.php?title=237.12_Communication_with_the_Public&amp;diff=14491&amp;oldid=prev"/>
		<updated>2007-10-02T19:23:54Z</updated>

		<summary type="html">&lt;p&gt;article construction&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;[[image:237.12 consultant employees.jpg|right|350px]]&lt;br /&gt;
&lt;br /&gt;
It is imperative to strictly limit all information communicated to the public (especially the contractors) concerning the engineer’s estimate and the bids received during a bid opening.  Certain information disclosed to the public, during the bid opening process, could compromise MoDOT’s actions.&lt;br /&gt;
&lt;br /&gt;
From the date a project is included in the notice of bid opening to the date of the Commission action concerning award or rejection of bids, questions of any kind concerning a project must be directed to the contact person specially named in the bidding proposal for the project.  The district contact person may answer questions by referencing the appropriate part of the plans or specifications.  Questions that require clarification or interpretation of the plans or specifications shall not be answered directly, but must be referred to [http://wwwi/design/default.htm Design] to conclude whether an addendum is to be sent to all bidders.  It is paramount all bidders have the same information from which to prepare a bid.&lt;br /&gt;
&lt;br /&gt;
During the period of time between the opening of bids and the Commission meeting, the only statement a MoDOT employee can give to anyone is, “The award or rejection of bids cannot be discussed until after the Commission takes action.”  This direction also applies to consultant employees preparing a project for MoDOT.&lt;br /&gt;
&lt;br /&gt;
[[category:237 Contract Plans]]&lt;/div&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>