This is the Engineering Policy Guide Test Site and not up to date. Please visit the current Engineering Policy Guide here.

121.7 Program Estimates: Revision history

From Engineering Policy Guide

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

24 January 2024

30 November 2022

14 December 2021

10 December 2020

6 January 2020

21 October 2019

  • curprev 13:0713:07, 21 October 2019Smithk talk contribsm 4,792 bytes +54 No edit summary
  • curprev 13:0013:00, 21 October 2019Smithk talk contribs 4,738 bytes +415 Per Bidding & Estimate, district estimate documentation must address the total project cost and include estimated costs for PE, CE, Constr'n, RW, Utilities, Bridge. Program estimate documentation & supporting documents to be stored in e-Projects
  • curprev 12:3112:31, 21 October 2019Smithk talk contribs 4,323 bytes +534 Per Bidding and Estimates, estimating guidance updated to add optional spreadsheet to assist the districts with their scoping and estimating processes. The Resurfacing Per Mile Scoping Form was made available.

30 August 2019