This is the Engineering Policy Guide Test Site and not up to date. Please visit the current Engineering Policy Guide here.

131.1 Design Exception Process: Revision history

From Engineering Policy Guide

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 September 2023

17 December 2021

24 November 2021

18 November 2020

15 January 2020

5 March 2019

26 January 2018

5 December 2017

6 November 2017

17 January 2017

13 January 2017

6 September 2016

  • curprev 08:2108:21, 6 September 2016Smithk talk contribsm 21,643 bytes +2,410 Per EPG, federal rule has reduced controlling criteria to 10, reducing instances where fed approval is required for controlling criteria on federal involvement projects.

8 December 2015

21 July 2014

4 June 2014

19 February 2014

  • curprev 15:5715:57, 19 February 2014Smithk talk contribs 18,158 bytes +2,578 Per Design, generally rewritten to improve the review and approval process and clarify roles and responsibilities by obtaining concurrence during the early stage of the process.

17 April 2013

9 April 2012

2 August 2011

22 June 2011

13 January 2011

5 January 2011

7 October 2010