136.2 Bridge Soft Match Credit Program: Revision history

From Engineering Policy Guide

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 April 2012

13 January 2011

  • curprev 11:0111:01, 13 January 2011Smithk talk contribsm 17,936 bytes +5,405 Per LPA Coord, FHWA and MoDOT sr mng't: new checklist, new certification by engr of record and a new assumption that if rehab costs are 68% or more of replacement costs, the replacem't is better value

7 September 2010

  • curprev 13:1213:12, 7 September 2010Smithk talk contribsm 12,531 bytes +1,244 Per LPA Coordinator, FHWA and MoDOT's senior management: Final inspection to be performed by a team leader certified inspector. Also, clarification of noncontroversial.