Revision history of "136.2 Bridge Soft Match Credit Program"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 11:20, 23 April 2012Smithk talk contribsm 379 bytes -17,557 Per Design, EPG 136 was generally re-written following thorough research and input from LPAs, consultants and FHWA.
  • curprev 10:01, 13 January 2011Smithk talk contribsm 17,936 bytes +5,405 Per LPA Coord, FHWA and MoDOT sr mng't: new checklist, new certification by engr of record and a new assumption that if rehab costs are 68% or more of replacement costs, the replacem't is better value
  • curprev 12:12, 7 September 2010Smithk talk contribsm 12,531 bytes +1,244 Per LPA Coordinator, FHWA and MoDOT's senior management: Final inspection to be performed by a team leader certified inspector. Also, clarification of noncontroversial.