This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

147.4 Fixed Price Variable Scope (FPVS) Contracting: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

6 March 2024

27 July 2021

23 July 2021

  • curprev 13:5513:55, 23 July 2021Smithk talk contribsm 6,379 bytes +5,955 Per DE, Fixed price variable scope (FPVS) guidance was temporarily removed from the EPG. FHWA has now approved the use of FPVS at a programmatic level

1 May 2020

25 March 2020