This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

616.5 Flagger Control (MUTCD Chapter 6E): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

27 September 2023

15 February 2023

22 October 2021

14 August 2020

25 June 2019

29 August 2017

  • curprev 08:2908:29, 29 August 2017EPGsysop talk contribs 43,850 bytes +1,433 Per TS, Nat'l Safety Council’s 3-2-1 Cone Procedure implemented for internal ops. Flagger lighting requirements for contract and MoDOT operations increased to 5.0 ft-candles to meet OSHA requirements

14 April 2017

7 April 2017

29 March 2016

25 February 2016

30 December 2015

13 May 2015

7 May 2015

8 September 2014

3 September 2014

30 June 2014

6 February 2014

11 April 2013

27 November 2012

21 November 2012

24 May 2012

27 April 2012

5 March 2012