This is the Engineering Policy Guide Test Site and not up to date. Please visit the current Engineering Policy Guide here.

751.24 Retaining Walls: Revision history

From Engineering Policy Guide

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

25 July 2024

24 July 2024

19 July 2024

9 February 2024

11 January 2022

17 December 2021

25 October 2021

23 April 2021

30 December 2020

30 October 2020

5 August 2020

7 December 2018

28 September 2018

20 September 2018

19 September 2018

27 February 2018

26 February 2018

9 February 2018

13 November 2017

3 November 2017

  • curprev 08:4708:47, 3 November 2017EPGsysop talk contribs 140,968 bytes +9,144 Per BR, guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area was revised

15 June 2017

9 June 2017

15 February 2017

5 December 2016

14 June 2016

1 June 2016

29 January 2016

10 May 2013

16 April 2013

31 October 2011

29 September 2011

13 September 2011

  • curprev 15:3115:31, 13 September 2011Smithk talk contribsm 158 bytes +1 Per Bridge, the correct design practice of showing sloped elevation lines for bottom of wall elevations has been added. Other revisions to the guidance are clarifications.

14 March 2011