This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

751.35 Concrete Pile Cap Integral End Bents: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

19 July 2024

21 March 2024

31 May 2022

11 January 2022

25 October 2021

2 December 2020

30 November 2020

29 October 2020

5 August 2020

10 June 2020

17 April 2020

28 January 2020

19 December 2019

2 December 2019

19 February 2019

25 October 2017

19 May 2017

17 May 2017

26 April 2017

11 April 2017

15 February 2017

22 September 2016

3 February 2016

22 April 2014

12 July 2013

14 August 2012

14 February 2012

10 February 2012

13 December 2011

6 July 2011

22 June 2011

15 April 2010

5 April 2010

  • curprev 12:0712:07, 5 April 2010Smithk talk contribsm 26,776 bytes +1 minor clarifications to differentiate EPG articles (that are referenced as "articles", not "sections") from specifications (that are referenced as "sections")

1 October 2009

22 June 2009

  • curprev 15:0215:02, 22 June 2009EPG-Admin talk contribs 26,828 bytes +1,095 Change minimum distance from 9" to 8" from outside edge of pile to face of beam on concrete pile cap integral and non-integral end bents, intermediate pile cap bents, semi-deep abutment beam caps.

28 September 2007