This is the Engineering Policy Guide Test Site and not up to date. Please visit the current Engineering Policy Guide here.

LPA:136.4 Consultant Selection and Consultant Contract Management: Revision history

From Engineering Policy Guide

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

1 April 2024

7 March 2024

30 November 2023

2 June 2023

6 February 2023

19 January 2023

6 January 2023

19 December 2022

3 May 2022

22 February 2022

26 October 2021

13 September 2021

23 June 2021

21 May 2021

2 March 2021

2 September 2020

1 July 2020

23 June 2020

27 February 2020

16 December 2019

4 December 2019

24 October 2019

23 October 2019

19 September 2019

26 June 2019

23 January 2019

2 January 2019

5 October 2018

17 July 2018

17 July 2017

29 June 2017

2 June 2017

5 January 2017

13 September 2016

27 May 2016

24 February 2016

17 February 2016

27 January 2016

  • curprev 15:5115:51, 27 January 2016Smithk talk contribsm 51,385 bytes −28 Per LPA, revised Fig 136.4.1's Article VII D.2, D.3 and E to indicate the overhead rate established at the execution of the original contract shall be utilized throughout the life of the contract.

14 January 2016

30 December 2015

23 December 2015

6 November 2015

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)