Difference between revisions of "Category:619 Pavement Edge Treatment"
(Per Traffic, Pavement Edge Treatment info was moved from EPG 616.17 to this article to coordinate with pay items. Old EPG 616.17 had no appreciable history since its 2007 beginning. It had 2120 hits.) |
m (updated broken link) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
|[[:Category:Shoulder Maintenance#Shoulder Edge Ruts and Settlement Maintenance|Shoulder Edge Ruts and Settlement Maintenance]] | |[[:Category:Shoulder Maintenance#Shoulder Edge Ruts and Settlement Maintenance|Shoulder Edge Ruts and Settlement Maintenance]] | ||
|} | |} | ||
+ | This safety treatment eliminates the vertical drop-off at the pavement edge, allowing drifting vehicles to return to the pavement safely. Vehicles may leave the roadway for various reasons and this sloped pavement edge treatment enhances drivers' opportunity to return to the roadway while maintaining control of their vehicle. | ||
− | Criteria for pavement edge treatment are shown on [ | + | Criteria for pavement edge treatment are shown on [https://www.modot.org/media/16895 Standard Plan 619.10] and are described in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 619] of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with [http://sp/sites/cm/Pages/default.aspx Construction and Materials] is recommended. |
Latest revision as of 11:19, 17 February 2022
Additional Information |
Shoulder Edge Ruts and Settlement Maintenance |
This safety treatment eliminates the vertical drop-off at the pavement edge, allowing drifting vehicles to return to the pavement safely. Vehicles may leave the roadway for various reasons and this sloped pavement edge treatment enhances drivers' opportunity to return to the roadway while maintaining control of their vehicle.
Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.
This category currently contains no pages or media.