Job Special Provisions: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(25 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<div id="JSP-Provision"></div> | <div id="JSP-Provision"></div> | ||
=== === | |||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision | |+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision | ||
Line 7: | Line 8: | ||
| [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 || | | [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || | | [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” wide ranging in height from 60” to 96”, and community wayfinding signs at locations shown on the plans. || JSP-23-02 || 9/13/2023 || 12/1/2023 | |||
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018 || | | [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018 || | ||
Line 29: | Line 28: | ||
| [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009 || | | [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/ | | [https://epg.modot.org/forms/JSP/JSP2401.docx JSP2401] || Balanced Mix Design Requirements * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-24-01B || 12/11/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007 || | ||
Line 39: | Line 38: | ||
| [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This | | [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This JSP is required on all projects except Job Order Contracts and must be JSP B in the set of JSPs. || JSP-13-01D || 4/9/2024 || 6/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 || | ||
Line 46: | Line 45: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015 || | | [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2405.docx JSP2405] || DBE Prompt Payment Reporting || This provision is required on all federally funded contracts. || JSP-24-05B || 12/12/2024 || 1/1/2025 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. || JSP-99-08 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. || JSP-99-08 || 10/5/2007 || | ||
Line 61: | Line 62: | ||
| [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 || | | [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09-02K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09-03K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09-04K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 || | ||
Line 78: | Line 79: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2403.docx JSP2403] || High-Tension Guard Cable Barrier || (Previous JSP-06-07) - This provision should be used when high-tension guard cable is specified. || JSP-24-03 || 5/16/2024 || 7/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use. Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019 || | | [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use. Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019 || | ||
Line 85: | Line 88: | ||
| [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In | | [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In the Work Zone || For use on projects which will include work zone enforcement. || JSP-15-03 || 3/17/2015 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03- | | [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03-05B || 7/10/2024 || 10/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019 || | | [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93- | | [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93-28A || 7/10/2024 || 10/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021 || | | [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021 || | ||
Line 118: | Line 121: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021 || | | [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021 || | ||
|- | |-style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2402.docx NJSP2402] || Non-Tracking Tack || This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. || JSP-24- | | [https://epg.modot.org/forms/JSP/JSP2402.docx NJSP2402] || Non-Tracking Tack || This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. || JSP-24-02A || 12/11/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019 || | | [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019 || | ||
Line 126: | Line 129: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2407.docx JSP2407] || Optional Base Widening || This provision is to be used for pavement widening when there are no preferences of pavement type, and the final surface is to be overlaid. || JSP-24-07 || 9/23/2024 || 12/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018 || | | [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018 || | ||
Line 135: | Line 140: | ||
| [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018 || | | [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18- | | [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18-07F || 5/13/2024 || 8/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011 || | | [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011 || | ||
Line 163: | Line 168: | ||
| [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021 || | | [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2303.docx JSP2303] || Rapid Penetrating Emulsion * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-23-03 || 12/5/2023 || | | [https://epg.modot.org/forms/JSP/JSP2303.docx JSP2303] || Rapid Penetrating Emulsion * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-23-03 || 12/5/2023 || 3/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011 || | | [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011 || | ||
Line 180: | Line 185: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023 || 11/1/2023 | | [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023 || 11/1/2023 | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP1701.docx JSP1701] || Required Combination of Calls || This provision is used when required projects with separate funding (ie: state funded and federal funded projects) are to be combined. || JSP-17-01A || 6/13/2024 || 7/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019 || | | [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019 || | ||
Line 189: | Line 196: | ||
| [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || | | [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || 9/4/2024 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017 || | | [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017 || | ||
Line 201: | Line 208: | ||
| [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 || | | [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18- | | [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18-01EE || 10/15/2024 || 12/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 || | | [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 || | ||
Line 207: | Line 214: | ||
| [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019 || | | [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07- | | [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07-05C || 7/24/2024 || 11/01/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2304.docx JSP2304] || Truck Mounted Attenuator (TMA) for Stationary Activities || Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) || JSP-23-04 || 1/22/2024 || 4/1/2024 | | [https://epg.modot.org/forms/JSP/JSP2304.docx JSP2304] || Truck Mounted Attenuator (TMA) for Stationary Activities || Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) || JSP-23-04 || 1/22/2024 || 4/1/2024 | ||
Line 214: | Line 221: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016 || | | [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2404.docx JSP2404] || Vegetative Barrier Pavement || This provision is used when installing new guard cable. || JSP-24-04A || 10/15/2024 || 1/1/2025 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023 || 12/1/2023 | | [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023 || 12/1/2023 | ||
Line 224: | Line 233: | ||
|} | |} | ||
=== === | |||
<div id="JSP-LPA"></div> | <div id="JSP-LPA"></div> | ||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
Line 256: | Line 266: | ||
| [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || || LPA-15-12 || | | [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || || LPA-15-12 || | ||
|} | |} | ||
=== === | |||
<div id="JSP-Packages"></div> | <div id="JSP-Packages"></div> | ||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
Line 262: | Line 272: | ||
|- | |- | ||
! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting | ! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2024.docx JOC_ASPHALT_2024] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_ASPHALT_2024 || | | [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2024.docx JOC_ASPHALT_2024] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_ASPHALT_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2024.docx JOC_BRIDGE_2024] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_BRIDGE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2024.docx JOC_BRIDGE_2024] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_BRIDGE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY | | [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2025 CLC Book Job projects without plans. || CLC_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY | | [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY 2025 CLC projects. || CLC_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2024.docx JOC_CONCRETE_2024] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_CONCRETE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2024.docx JOC_CONCRETE_2024] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_CONCRETE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_FENCE_2024.docx JOC_FENCE_2024] || Fence Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_FENCE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_FENCE_2024.docx JOC_FENCE_2024] || Fence Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_FENCE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2024.docx JOC_GUARD_CABLE_2024] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARD_CABLE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2024.docx JOC_GUARD_CABLE_2024] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024.docx JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024] || Guardrail and Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_GUARD_CABLE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024.docx JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024] || Guardrail and Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2024.docx JOC_GUARDRAIL_2024] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_2024 || | | [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2024.docx JOC_GUARDRAIL_2024] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY | | [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY 2025 Seal Coat Book Job projects without plans. || Seal_Coat_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY | | [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY 2025 Seal Coat projects. || Seal_Coat_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|} | |} |