This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

616.17 Pavement Edge Treatment: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m previously 616.9
 
TaracksA (talk | contribs)
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
|'''This article has moved'''
|-
|-
|[[Additional Information 616.9 Pavement Edge Treatment|Maintenance]]
|EPG 616.17 Pavement Edge Treatment has moved to [[:Category:619 Pavement Edge Treatment|EPG 619 Pavement Edge Treatment]].  The content was not changed, only article's location.
|}
|}
Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot.state.mo.us/business/standards_and_specs/Sec0619.pdf Sec 619] of the Standard Specifications.  Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done.  Edge treatment is listed on the "2B" sheets by location.  Coordination with Construction and Materials is recommended.








[[Category:616 Temporary Traffic Control]]
[[Category:Backup Removed Pages]]

Latest revision as of 14:50, 5 November 2025

This article has moved
EPG 616.17 Pavement Edge Treatment has moved to EPG 619 Pavement Edge Treatment. The content was not changed, only article's location.