Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 320.1.5.3)
 
Line 1: Line 1:
[[Image:Engineering Policy Guide.jpg|center]]
+
__NOTOC__
 +
<div style="margin-top:0px; margin-bottom:0px; background-color:black; border-radius:5px; box-shadow:5px 5px 5px #888888; border:1px solid black">
 +
<center>
 +
<div class="jcarousel-wrapper" style="margin-top:7px; margin-bottom:0px">
 +
<div class="jcarousel jcarousel-randomize">
 +
    <div class="jcarousel-list">
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=20%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-001.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-002.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-007.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-004.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-005.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-006.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-003.png}}
 +
        </div>
 +
    </div>
 +
</div>
 +
</div>
 +
</center>
 +
</div>
  
 +
{| style="text-align:center; margin-top:12px; margin-left: auto; margin-right: auto; font-style:italic; font-size:20px; font-family:Verdana, Geneva, sans-serif !important;"
 +
|-
 +
! style="padding-left:90px; padding-right:90px; |
 +
----
 +
Our mission is to provide a world-class transportation system that is</br>safe, innovative, reliable and dedicated to a prosperous Missouri.
 +
----
 +
|}
  
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 110%; background:#cccc89" width="814px" align="center"
+
{| style="width:100%; text-align:center; margin-top:0px;"
|-
 
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
 
 
|-
 
|-
| ||align="left"|''' <BIG><font color = "white"><i>[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">
+
| [[image:Google search.png|200px|bottom|link=https://epg.modot.org/modot/EPG_GoogleSearch.html]]
 +
| [[image:recent_changes.png|200px|bottom|link=Recent Policy Changes in the EPG]]
 +
| [[image:TA_image.png|200px|bottom|link=616.8_Typical_Applications_(MUTCD_6H)#616.8.2.1_Typical_Applications]]
 +
| [[image:MASH_info.png|200px|bottom|link=https://epg.modot.org/files/c/ce/MASH_Implementation.pdf]]
 
|-
 
|-
| ||align="left"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
 
 
|}
 
|}
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
[[image:Main Page Mar 10, 2011.jpg|300px|center|thumb|<center>'''Kenneth Strube's view of I-70 from inside a motorgrader on Feb. 1, plowing through 18 in. of snow.  Strube is a District 5 Maintenance Superintendent.''' </center>]]
 
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
 +
<b>MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [https://modotgov.sharepoint.com/sites/br Bridge], [https://modotgov.sharepoint.com/sites/cm Construction], [https://modotgov.sharepoint.com/sites/DE/ Design], [https://modotgov.sharepoint.com/sites/ts Highway Safety & Traffic], [https://modotgov.sharepoint.com/sites/mt Maintenance], [https://modotgov.sharepoint.com/sites/tp Planning] and [https://modotgov.sharepoint.com/sites/DE/SitePages/Right-of-Way.aspx Right of Way] guidance.</b>
 +
</div>
  
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://wwwi/intranet/rw/ Right of Way], [http://wwwi/design/default.htm Design], [http://wwwi/intranet/br/default.htm Bridge], [http://wwwi/intranet/cm/ Construction], [http://wwwi/intranet/tr/ Traffic] and [http://wwwi/maintenance/ Maintenance] manuals.
+
{| style="width:100%; text-align:center; margin-top:12px;"
 +
|-
 +
| [[image:Broken link.png|200px|bottom|link=mailto:engineering.policy@modot.mo.gov?Subject=Report%20a%20broken%20link&Body=Please%20include%20the%20broken%20link,%20article%20number%20and%20a%20screenshot%20if%20possible]]
 +
| [[image:Approval process.png|200px|bottom|link=Help_Article#EPS_Approval_Process]]
 +
| [[image:E-update.png|200px|bottom|link=Help_article#Signing_Up_for_E-Updates]]
 +
|-
 +
|}
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPGMillions of hits on the EPG endorse this format to be easy to navigate and pleasing to readA small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
[[image:Main Page 2 Mar 10, 2011.jpg|300px|center|thumb|<center>'''During the heavy snows of early February, District 1 Construction Project Office Assistant Lana Allen noticed a message written on the St. Joseph News-Press's protective plastic wrapping.  She shared with all of us her grateful newspaper carrier's note.'''</center>]]
+
<b>The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locations.  Projects on existing roadways call for a flexible, practical, and performance-based approach to design.  The EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteriaAlthough new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadwaysWhile the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing. The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.</b>
 +
</div>
  
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
+
<div style="margin-top:12px; background-color:black; color:white; border-radius:5px; box-shadow:5px 5px 5px #888888">
'''Insoluble Residue Test'''
+
<center>'''The Engineering Policy Guide is maintained via the use of Microsoft EdgeFor optimal viewing quality, please choose Microsoft Edge for your browser.'''</center>
 
+
</div>
4/1/11: Geotechnical has added guidance in [[320.1 Preliminary Geotechnical Report#320.1.5.3 Tests Specifically Requested|EPG 320.1.5.3 Tests Specifically Requested]] for this non-routine test.
 
 
 
'''[[:Category:321 Geotechnical Engineering|EPG 321 Geotechnical Engineering]]'''
 
 
 
4/1/11: EPG 321 has been re-arranged and expanded.  New articles include [[321.2 Geotechnical Guidelines|EPG 321.2 Geotechnical Guidelines]] and [[321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation|EPG 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation]].
 
 
 
'''Load and Resistance Factor Design (LRFD) of Bridges and Foundations'''
 
 
 
4/1/11: FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.  [[321.1 Design of Earth Slopes|EPG 321.1 Design of Earth Slopes]] is new guidance while [[751.37 Drilled Shafts|EPG 751.37 Drilled Shafts]] and [[751.38 Spread Footings|EPG 751.38 Spread Footings]] have been re-written to reflect the federal mandate.
 
 
 
'''[[:Category:128 Conceptual Studies#128.2 Preventive Maintenance Projects (1R and 2R)|EPG 128.2 Preventive Maintenance Projects (1R and 2R)]]'''
 
 
 
3/31/11:  Core teams are cautioned to investigate the project's corridor for safety and operational concerns and document the concerns.  1R and 2R are still not required for conceptual study reports.  Additional guidance in [[:Category:402 Bituminous Surface Leveling#402.1.1 Plan Preparation|EPG 402.1.1 Plan Preparation]] and [[:Category:413 Surface Treatments and Preventive Maintenance|EPG  413 Surface Treatments and Preventive Maintenance]].
 
 
 
'''[[237.5 Special Provisions#Contractor Furnished Surveying and Staking.|Required Job Special Provisions for Contractor Surveying and Staking]] '''
 
 
 
3/31/11: This revision urges contractor surveying and staking to be used in projects with earthwork exceeding 50,000 cu. yds.
 
 
 
'''[[:Category:626 Rumble Strips|EPG 626 Rumble Strips]]'''
 
 
 
3/31/11: The rumble strip directive was clarified and emphasis was added that any variance from this guidance needs authorization from Central Office.  Also, [[626.5 Modified Rumble Strips|new Modified Rumble Strip guidance]].
 
 
 
'''[http://epg.modot.org/index.php?title=Category:1006_Aggregate_for_Surfacing#1006.2_Acceptance EPG 1006.2 Aggregate for Surfacing]'''
 
 
 
3/31/11: Lower types of aggregate for surfacing by certification or visual inspection for small quantitites are now allowed since sampling may not be practical.
 
 
 
'''[[127.13 Noise|Noise Policy]]'''
 
 
 
3/31/11: MoDOT's noise abatement policy, EPG 127.13, has ben restructured to comply with new federal requirements.
 
 
 
'''[[751.22 P/S Concrete I Girders#751.22.1.4 Span and Structure Lengths|EPG 751.22.1.4 Span and Structure Lengths]]'''
 
 
 
3/30/11:  This revision simplifies laying out prestressed girders similar to laying out steel girders.
 
 
 
'''[[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]]
 
 
 
3/30/11: The SWPPP has been updated.
 
 
 
'''[[751.5 Standard Details#751.5.10 Reinforcing Steel Detailing|EPG 751.5.10 Reinforcing Steel Detailing]]
 
 
 
3/28/11: Expanded guidance especially for newer designers.
 
 
 
'''Flagger Training'''
 
 
 
3/25/11: Updated flagger training is available at [[616.20 Flagger Training|EPG 616.20]].
 
 
 
'''LOGO and TODS Signing'''
 
 
 
3/25/11: Expanded guidance in [[903.9 Specific Service Signs#903.9.3 Logos and Logo Panels (MUTCD Section 2F.03)|EPG 903.9.3]] for installing, relocating and repair of LOGO and TODS signing.
 
 
 
'''[[612.4 Truck-Mounted Attenuator Training|EPG 612.4 Truck-Mounted Attenuator Training]]'''
 
 
 
3/24/11: The updated training includes guidance for trailer-mounted TMAs.
 
 
 
'''Digital Signatures'''
 
 
 
2/10/11: Digital signatures may be used to sign a change order or value engineering proposal.  Guidance for this is now available at [[:Category:105 Control of Work#105.19 Digital Signatures (Sec 105.19)|EPG 105.19]].
 
 
 
'''Updated EPG 616 Work Zone Figures'''
 
 
 
2/3/11: Twelve of the [[:Category:616 Temporary Traffic Control#Work Zone Figures|work zone figures]] were updated to reflect the new work zone speed limit policy.
 
 
 
'''Updated TAs for New Work Zone Speed Limit Policy'''
 
 
 
1/31/11: Most of the TAs in [[616.23 Traffic Control for Field Operations|EPG 616.23 Traffic Control for Field Operations]] have been updated to reflect the new work zone speed limit policy.
 
 
 
'''[[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]]
 
 
 
1/14/11: The SWPPP has been updated.
 
 
 
'''Herbicides'''
 
 
 
1/12/11: [[821.25 Products|EPG 821.25 Products]] now presents the herbicides used by MoDOT in 2011.
 
 
 
{| border="0" style="background:#ffeecd"
 
|'''[[:Category:144 Practical Operations|EPG 144 Practical Operations]]'''
 
 
 
1/6/11:  This new article provides general guidance for MoDOT's new direction in [[:Category:144 Practical Operations#144.1 Winter Operations Changes|snow and ice control]], [[:Category:144 Practical Operations#144.2 Signing Operations Changes|signing]], [[:Category:144 Practical Operations#144.3 Striping Operations Changes|striping]], [[:Category:144 Practical Operations#144.4 Mowing Operations Changes|mowing]] and [[:Category:144 Practical Operations#144.5 Pavement Operations Changes|pavement operations]].
 
|}
 
 
 
|}
 

Latest revision as of 12:52, 12 September 2024


Our mission is to provide a world-class transportation system that is
safe, innovative, reliable and dedicated to a prosperous Missouri.


Google search.png Recent changes.png TA image.png MASH info.png

MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

Broken link.png Approval process.png E-update.png

The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locations. Projects on existing roadways call for a flexible, practical, and performance-based approach to design. The EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteria. Although new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadways. While the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing. The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.

The Engineering Policy Guide is maintained via the use of Microsoft Edge. For optimal viewing quality, please choose Microsoft Edge for your browser.