Difference between revisions of "Category:1017 Slag Cement"
m (→1017.4.4 Sample Record: Per CM, updated link to AS 3510) |
(updated per RR3705) |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | This guidance establishes procedures for inspecting, [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]], testing and accepting | + | This guidance establishes procedures for inspecting, [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]], testing and accepting Slag Cement at the source and destination and establishes a list of qualified Slag Cement sources. |
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | ||
Line 5: | Line 5: | ||
|'''Approved Products''' | |'''Approved Products''' | ||
|- | |- | ||
− | |[ | + | |[https://www.modot.org/media/474 Slag Cement Qualified Sources] |
|- | |- | ||
|'''MGS Information''' | |'''MGS Information''' | ||
|- | |- | ||
− | |[ | + | |[https://www.modot.org/general-services-specifications-mgs-subject Current General Services Specifications (MGS) By Subject] |
|} | |} | ||
Line 22: | Line 22: | ||
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right" | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right" | ||
|- | |- | ||
− | |'''Concrete, 70% | + | |'''Concrete, 70% Slag Cement''' |
|- | |- | ||
|[http://library.modot.mo.gov/RDT/reports/Ri99035/or06008.pdf Report 2006] | |[http://library.modot.mo.gov/RDT/reports/Ri99035/or06008.pdf Report 2006] | ||
Line 28: | Line 28: | ||
|[http://library.modot.mo.gov/RDT/reports/Ri99035/or06b008.pdf Summary 2006] | |[http://library.modot.mo.gov/RDT/reports/Ri99035/or06b008.pdf Summary 2006] | ||
|- | |- | ||
− | |'''See also:''' [ | + | |'''See also:''' [https://www.modot.org/research-publications Research Publications] |
|} | |} | ||
===1017.2.1 Source Acceptance and Qualification=== | ===1017.2.1 Source Acceptance and Qualification=== | ||
− | All | + | All Slag Cement for use in MoDOT projects must be furnished from a manufacturer or terminal and must comply with the requirements of [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1017]. The procedures for qualification are listed in Specification Sec 1017. Direct questions from potential suppliers concerning qualification to the Central Office. A copy of each manufacturer's quality control plan is to be kept on file in the Central Office. The latest copy of each marketing entity's quality control plan is to be kept on file in the Central Office. Send any updates to the quality control plan direct to the Chemical Laboratory Director. |
===1017.2.2 Sampling and Inspection=== | ===1017.2.2 Sampling and Inspection=== | ||
− | The | + | The Senior Chemist may coordinate with the manufacturer to obtain a semi-annual split sample of the approved grade of Slag Cement along with a split sample of the reference cement used by the manufacturer. Properly label the sample and enter the sample information into AASHTOWARE (AWP). Designate sample type as "Split Sample". The manufacturer shall furnish the manufacturer’s test results to the Senior Chemist within two weeks after completion. |
===1017.2.3 Disqualified Facilities=== | ===1017.2.3 Disqualified Facilities=== | ||
− | + | Slag Cement producers that fail to comply with the qualified status as set forth in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1017] will be required to designate the silo(s), bin(s), or storage facility from which they propose to furnish Slag Cement for MoDOT projects. The producer must sample, test, and report satisfactory test results for each designated silo, bin, or storage facility. Prior to any shipment and following a satisfactory report furnished to the Chemical Laboratory Director, each silo, bin, or storage facility will be sampled and sealed by the Senior Chemist. If the results of testing by the Central Laboratory are satisfactory, the sealed silo, bin, or storage facility will be approved. This procedure will continue until adequate quality control has been re-established. | |
− | ===1017.2.4 Destination Inspection of Approved or Certified | + | ===1017.2.4 Destination Inspection of Approved or Certified Slag Cement=== |
The ready-mix, precast, or paving plant operator shall furnish a copy of the bill of lading or delivery receipt for each shipment to MoDOT work. | The ready-mix, precast, or paving plant operator shall furnish a copy of the bill of lading or delivery receipt for each shipment to MoDOT work. | ||
− | Use the following procedure to sample | + | Use the following procedure to sample Slag Cement on paving jobs and at ready-mix plants. Samples shall weigh a minimum of 5 lbs (2.25 kg). Obtain samples from the storage bin or weigh hopper in one operation representing a brief period in the Slag Cement stream. |
Take a sample for each 375 tons (340 Mg) or portion thereof at destination for each paving job and submit to the Central Laboratory. | Take a sample for each 375 tons (340 Mg) or portion thereof at destination for each paving job and submit to the Central Laboratory. | ||
Line 48: | Line 48: | ||
At ready-mix or precast plants, take a sample for each 375 tons (340 Mg) or portion thereof with a minimum of one sample every other month during the period that the ready-mix or precast plant is furnishing slag modified concrete for MoDOT work. | At ready-mix or precast plants, take a sample for each 375 tons (340 Mg) or portion thereof with a minimum of one sample every other month during the period that the ready-mix or precast plant is furnishing slag modified concrete for MoDOT work. | ||
− | Place the samples taken at destination in a canvas bag containing a plastic liner and ship to the Central Laboratory. Properly label the sample and enter pertinent sample information into | + | Place the samples taken at destination in a canvas bag containing a plastic liner and ship to the Central Laboratory. Properly label the sample and enter pertinent sample information into AWP. Designate the sample type "Proj – Check Sample". |
==1017.3 Report== | ==1017.3 Report== | ||
− | Report of Central Laboratory test results on random samples of | + | Report of Central Laboratory test results on random samples of Slag Cement originating from a qualified manufacturer or terminal will not be distributed unless specifically requested and conditions warrant this information for a specific purpose. |
− | The receiving district Construction and Materials Engineer shall continuously monitor shipments to the particular ready-mix or paving plants to assure the | + | The receiving district Construction and Materials Engineer shall continuously monitor shipments to the particular ready-mix or paving plants to assure the Slag Cement was shipped from an approved source. |
− | Perform a review of each plant inspector's daily report data at regular intervals not to exceed one week. Verify that enough tickets are shown to account for the amount of | + | Perform a review of each plant inspector's daily report data at regular intervals not to exceed one week. Verify that enough tickets are shown to account for the amount of Slag Cement used and that the supplier and grade are shown on the list of qualified sources. If the report does not contain the required information, notify the district Construction and Materials Engineer. |
==1017.4 Laboratory Testing for Sec 1017== | ==1017.4 Laboratory Testing for Sec 1017== | ||
Line 62: | Line 62: | ||
===1017.4.2 Procedure=== | ===1017.4.2 Procedure=== | ||
− | Chemical analysis is to be conducted according to ASTM C114 and C989. Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in | + | Chemical analysis is to be conducted according to ASTM C114, MoDOT TM 92 and C989. Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in AWP. |
Physical tests shall be conducted in accordance with the following methods: | Physical tests shall be conducted in accordance with the following methods: | ||
Line 70: | Line 70: | ||
:(d) Density - ASTM C188 | :(d) Density - ASTM C188 | ||
− | Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in | + | Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in AWP. |
===1017.4.3 Plant Inspection=== | ===1017.4.3 Plant Inspection=== | ||
− | Qualified | + | Qualified Slag Cement manufacturers and terminals shipping material by certification to MoDOT projects shall be inspected on a regular basis by a representative of the Laboratory. This inspection shall include a review of plant facilities for producing a quality product; plant testing procedures; frequency of tests; plant records of daily test results and shipping information; company certification procedures for silos, bins, and/or shipments; and a discussion of items of mutual interest between the plant and MoDOT. The Laboratory representative shall coordinate test results and test procedures between the Laboratory and the respective plant laboratory, and investigate associated problems. |
All silo or bin certifications and results of complete physical and chemical tests received in the Laboratory are to be checked for specification compliance and to determine if the required certifications have been furnished. | All silo or bin certifications and results of complete physical and chemical tests received in the Laboratory are to be checked for specification compliance and to determine if the required certifications have been furnished. | ||
===1017.4.4 Sample Record=== | ===1017.4.4 Sample Record=== | ||
− | All sample records shall be completed in | + | All sample records shall be completed in AASHTOWARE Project (AWP) in accordance with [[:Category:101 Standard Forms #Sample Record, General|AWP MA Sample Record, General]], and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in Reporting Test Results, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab. |
Latest revision as of 13:14, 17 July 2023
This guidance establishes procedures for inspecting, sampling, testing and accepting Slag Cement at the source and destination and establishes a list of qualified Slag Cement sources.
Approved Products |
Slag Cement Qualified Sources |
MGS Information |
Current General Services Specifications (MGS) By Subject |
Contents
1017.1 Apparatus
Keep all sample containers and equipment used in sampling clean and free of moisture or any foreign material. It is important that the sample be kept in airtight, moisture-proof containers from the time it is obtained until tests are started. The apparatus consists of:
- (a) Canvas bags with plastic liners.
- (b) Rubber bands for securely fastening the top of plastic liners.
- (c) Slotted tube, tube sampler, scoop, or any other device suitable for obtaining the sample.
- (d) Labeling materials.
1017.2 Procedure
Concrete, 70% Slag Cement |
Report 2006 |
Summary 2006 |
See also: Research Publications |
1017.2.1 Source Acceptance and Qualification
All Slag Cement for use in MoDOT projects must be furnished from a manufacturer or terminal and must comply with the requirements of Sec 1017. The procedures for qualification are listed in Specification Sec 1017. Direct questions from potential suppliers concerning qualification to the Central Office. A copy of each manufacturer's quality control plan is to be kept on file in the Central Office. The latest copy of each marketing entity's quality control plan is to be kept on file in the Central Office. Send any updates to the quality control plan direct to the Chemical Laboratory Director.
1017.2.2 Sampling and Inspection
The Senior Chemist may coordinate with the manufacturer to obtain a semi-annual split sample of the approved grade of Slag Cement along with a split sample of the reference cement used by the manufacturer. Properly label the sample and enter the sample information into AASHTOWARE (AWP). Designate sample type as "Split Sample". The manufacturer shall furnish the manufacturer’s test results to the Senior Chemist within two weeks after completion.
1017.2.3 Disqualified Facilities
Slag Cement producers that fail to comply with the qualified status as set forth in Sec 1017 will be required to designate the silo(s), bin(s), or storage facility from which they propose to furnish Slag Cement for MoDOT projects. The producer must sample, test, and report satisfactory test results for each designated silo, bin, or storage facility. Prior to any shipment and following a satisfactory report furnished to the Chemical Laboratory Director, each silo, bin, or storage facility will be sampled and sealed by the Senior Chemist. If the results of testing by the Central Laboratory are satisfactory, the sealed silo, bin, or storage facility will be approved. This procedure will continue until adequate quality control has been re-established.
1017.2.4 Destination Inspection of Approved or Certified Slag Cement
The ready-mix, precast, or paving plant operator shall furnish a copy of the bill of lading or delivery receipt for each shipment to MoDOT work.
Use the following procedure to sample Slag Cement on paving jobs and at ready-mix plants. Samples shall weigh a minimum of 5 lbs (2.25 kg). Obtain samples from the storage bin or weigh hopper in one operation representing a brief period in the Slag Cement stream.
Take a sample for each 375 tons (340 Mg) or portion thereof at destination for each paving job and submit to the Central Laboratory.
At ready-mix or precast plants, take a sample for each 375 tons (340 Mg) or portion thereof with a minimum of one sample every other month during the period that the ready-mix or precast plant is furnishing slag modified concrete for MoDOT work.
Place the samples taken at destination in a canvas bag containing a plastic liner and ship to the Central Laboratory. Properly label the sample and enter pertinent sample information into AWP. Designate the sample type "Proj – Check Sample".
1017.3 Report
Report of Central Laboratory test results on random samples of Slag Cement originating from a qualified manufacturer or terminal will not be distributed unless specifically requested and conditions warrant this information for a specific purpose.
The receiving district Construction and Materials Engineer shall continuously monitor shipments to the particular ready-mix or paving plants to assure the Slag Cement was shipped from an approved source.
Perform a review of each plant inspector's daily report data at regular intervals not to exceed one week. Verify that enough tickets are shown to account for the amount of Slag Cement used and that the supplier and grade are shown on the list of qualified sources. If the report does not contain the required information, notify the district Construction and Materials Engineer.
1017.4 Laboratory Testing for Sec 1017
1017.4.1 Sample Preparation
Prior to testing, the sample should be thoroughly mixed, passed through a No. 20 (850 mm) sieve, and brought to room temperature. All foreign matter and lumps that do not pulverize easily in the fingers must be discarded.
1017.4.2 Procedure
Chemical analysis is to be conducted according to ASTM C114, MoDOT TM 92 and C989. Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in AWP.
Physical tests shall be conducted in accordance with the following methods:
- (a) Fineness, 325 (45 mm) sieve analysis - ASTM C430
- (b) Slag Activity Index (7 day and 28 day) - ASTM C989
- (c) Fineness, air permeability - ASTM C204
- (d) Density - ASTM C188
Original test data and calculations are to be recorded in Laboratory workbooks. Test results are to be recorded in AWP.
1017.4.3 Plant Inspection
Qualified Slag Cement manufacturers and terminals shipping material by certification to MoDOT projects shall be inspected on a regular basis by a representative of the Laboratory. This inspection shall include a review of plant facilities for producing a quality product; plant testing procedures; frequency of tests; plant records of daily test results and shipping information; company certification procedures for silos, bins, and/or shipments; and a discussion of items of mutual interest between the plant and MoDOT. The Laboratory representative shall coordinate test results and test procedures between the Laboratory and the respective plant laboratory, and investigate associated problems.
All silo or bin certifications and results of complete physical and chemical tests received in the Laboratory are to be checked for specification compliance and to determine if the required certifications have been furnished.
1017.4.4 Sample Record
All sample records shall be completed in AASHTOWARE Project (AWP) in accordance with AWP MA Sample Record, General, and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in Reporting Test Results, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.
This category currently contains no pages or media.