Difference between revisions of "102.1 Construction Inspection Guidance for Sec 102"
Jump to navigation
Jump to search
m |
m (updated links) |
||
Line 1: | Line 1: | ||
[[image:102.1.jpg|right|250px]] | [[image:102.1.jpg|right|250px]] | ||
− | Bidding requirements and conditions for contractors are addressed in [http://www.modot. | + | Bidding requirements and conditions for contractors are addressed in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 102] of the Missouri Standard Specifications for Highway Construction. |
− | The Commission accepts bids for projects under conditions established by [http://www.modot. | + | The Commission accepts bids for projects under conditions established by [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec. 102] of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures. |
[[Category:102 Bidding Requirements and Conditions]] | [[Category:102 Bidding Requirements and Conditions]] |
Latest revision as of 11:18, 8 June 2016
Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.
The Commission accepts bids for projects under conditions established by Sec. 102 of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.