Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 127.25.1.4)
m (EPG 141.1 and EPG 141.2)
Line 25: Line 25:
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''Partnership Development'''
 +
 +
12/21/10:  Resource Management has updated guidance in two re-titled articles:  [[141.1 Cost Share Program|EPG 141.1 Cost Share Program]] and [[141.2 Missouri Transportation Finance Corporation (MTFC) Loans|EPG 141.2 Missouri Transportation Finance Corporation (MTFC) Loans]].
 +
 
'''[http://epg.modot.org/index.php?title=127.25_Maintenance_Environmental_Policies#127.25.1.4_Street_Sweepings EPG 127.25.1.4 Street Sweepings]
 
'''[http://epg.modot.org/index.php?title=127.25_Maintenance_Environmental_Policies#127.25.1.4_Street_Sweepings EPG 127.25.1.4 Street Sweepings]
  
Line 100: Line 104:
  
 
9/21/10:  The Contract Leveling Course Guidelines have been updated for FY 2011.  Updated guidance for the associated JSP is also now available in EPG 402.
 
9/21/10:  The Contract Leveling Course Guidelines have been updated for FY 2011.  Updated guidance for the associated JSP is also now available in EPG 402.
 
'''[[:Category:135 The Section 106 Process|EPG 135 The Section 106 Process]]'''
 
 
9/8/10:  EPG 135 now has [http://epg.modot.org/index.php?title=Category:135_The_Section_106_Process#135.1_The_Section_106_Process_for_Local_Public_Agencies Section 106 guidance for LPAs] as well as [http://epg.modot.org/index.php?title=Category:135_The_Section_106_Process#135.2_The_Section_106_Process_for_MoDOT_Projects for MoDOT projects].
 

Revision as of 11:04, 21 December 2010


HELPFUL EPG VIDEOS: Finding Info in the EPG
Logging into the EPG
WELCOME
RECENT POLICY CHANGES IN THE EPG
Senior Construction Inspector Matt Willard checks grades before paving the roadway approaching the new Route 125 bridge over the James River.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Chinese officials tour the District 6 Transportation Management Center as MoDOT markets the quality, reliability and efficiency of the St. Louis regional transportation system.

Partnership Development

12/21/10: Resource Management has updated guidance in two re-titled articles: EPG 141.1 Cost Share Program and EPG 141.2 Missouri Transportation Finance Corporation (MTFC) Loans.

EPG 127.25.1.4 Street Sweepings

12/21/10: Maintenance has clarified and expanded guidance for street sweeping.

EPG 141.7 Transportation Improvement Program Approval

11/30/10: This new article provides Transportation Planning's guidance for existing policy.

Transportation Management Systems (TMS)

11/23/10: EPG 145 now presents handy TMS information.

Disadvantaged Business Enterprise (DBE) Policy

11/23/10: EPG 146 is now available for DBE policy.

EPG 613.1.2 Class A Partial Depth Pavement Repairs

11/18/10: In Districts 1 and 4, Class B (instead of Class A) or full depth pavement repair should be considered due to the region's poor quality aggregate.

EPG 616.28 Traffic Control for Waterways

10/28/10: Traffic control for waterways guidance is now available.

NU Girder Info in EPG 751.22

10/27/10: Two options are now available for NU girder end section reinforcement. Also, maximum haunching has been increased to 4.5".

Date of Final Inspection in EPG 108.16.2

10/20/10: Four weeks, instead of one week, are now allotted to clear final payments to subcontractors so the prime contractor can submit final documentation.

Chevron Initiative Information in EPG 903.6.11

10/12/10: Chevrons are to be placed on all curves having a 15 mph difference between the posted speed limit and the curve's advisory speed.

Dynamic Message Signs (DMS)

10/7/10: Guidance has been expanded for DMS legibility, installation of a DMS and a DMS's message length in EPG 910.3.

EPG 131.1.3 Deficient Vertical Clearances on Interstates

10/7/10: New guidance about deficient vertical vertical clearance on interstates is now available.

EPG 643.3.17 Non-Invasive Digging

10/6/10: There is new guidance clarifying utilities' responsibility to determine the exact location of facilities on MoDOT right of way.

WO8-12 "No Center Stripe" Sign

10/6/10: Guidance for this sign was updated and clarified in EPG 616.2.2 and EPG 616.23.2.5.7.

Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures

10/6/10: This is a new test method, TM-83.

EPG 1026.2.1 Manufacturer Approval

10/6/10: Acceptance of precast drainage units (precast concrete box culverts) has been expanded to include National Precast Concrete Assn. (NPCA).

LPA Updates

10/5/10: In EPG 136.1.2.1 Procedures, the time allowed to bring an LPA project from allocation to award was shortened; EPG 136.6.2 was revised to ensure compliance with the Brooks Act, etc. since failure to comply with procedures may result in loss of funding; new retainage guidanace was added in EPG 136.9.9.5; and materials testing requirements in EPG 136.11.9 Materials Testing were updated.

Storm Water Pollution Prevention Plan (SWPPP) Updated

9/28/10: Guidance from current MoDOT training was added to the SWPPP. EPG 806.8.1 and EPG 806.8.4.2.5 were revised while EPG 806.8.4.4 and EPG 806.8.13 were added.

EPG 402 Bituminous Surface Leveling

9/24/10: In the PDFs of Contract Leveling Course Plan Templates (the "CLC Templates") near the top of EPG 402, Sheet 2 of 3 Traffic Control was updated to be in line with current guidance. JSP guidance was also updated.

Contract Leveling Course Guidance

9/21/10: The Contract Leveling Course Guidelines have been updated for FY 2011. Updated guidance for the associated JSP is also now available in EPG 402.