Difference between revisions of "Main Page"
m (EPG 153.19) |
m (E 153) |
||
Line 46: | Line 46: | ||
|colspan="4" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have. As of late March, the numbers of hits are:''' | |colspan="4" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have. As of late March, the numbers of hits are:''' | ||
|- | |- | ||
− | |<font size = 2>'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> | + | |<font size = 2>'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 154839 ||<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 210690 |
|- | |- | ||
− | |<font size = 2>'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> | + | |<font size = 2>'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 156527 ||<font size = 2>'''9.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 241549 |
|- | |- | ||
− | |<font size = 2>'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> | + | |<font size = 2>'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 162082 ||<font size = 2>'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 259540 |
|- | |- | ||
− | |<font size = 2>'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> | + | |<font size = 2>'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 166864 ||<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 293057 |
|- | |- | ||
− | |<font size = 2>'''16.''' [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> | + | |<font size = 2>'''16.''' [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 172800 ||<font size = 2>'''6.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 304005 |
|- | |- | ||
− | |<font size = 2>'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> | + | |<font size = 2>'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 175344 ||<font size = 2>'''5.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 326103 |
|- | |- | ||
− | |<font size = 2>'''14.''' [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> | + | |<font size = 2>'''14.''' [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 181967 ||<font size = 2> '''4.''' [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 327245 |
|- | |- | ||
− | |<font size = 2>'''13.''' [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> | + | |<font size = 2>'''13.''' [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 182829 ||<font size = 2> '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 354815 |
|- | |- | ||
− | |<font size = 2>'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> | + | |<font size = 2>'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 196450 ||<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 416257 |
|- | |- | ||
− | |width="130"|<font size = 2>'''11.''' [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> | + | |width="130"|<font size = 2>'''11.''' [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 203662 || width="150"|<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2716629 |
|} | |} | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''eAgreements''' | ||
+ | |||
+ | 3/27/17: [[:Category:153 Agreements and Contracts#153.1 The Agreement Process|EPG 153.1 The Agreement Process]] and [[:Category:235 Preliminary Plans#235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)|EPG 235.2.3 Municipal Agreements and County Agreements]] were updated to reflect the current eAgreement process. In [[:Category:153 Agreements and Contracts|EPG 153 Agreements and Contracts]], the tables were updated to provide the current contract listings. | ||
+ | |||
'''[[153.19 Right of Way|EPG 153.19 Right of Way]]''' | '''[[153.19 Right of Way|EPG 153.19 Right of Way]]''' | ||
Line 159: | Line 163: | ||
1/4/17: The Bridge Seismic Design Process Flowchart has been revised. | 1/4/17: The Bridge Seismic Design Process Flowchart has been revised. | ||
− | |||
− | |||
− | |||
− |
Revision as of 12:46, 27 March 2017
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | ||||||||||||||||||||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
eAgreements 3/27/17: EPG 153.1 The Agreement Process and EPG 235.2.3 Municipal Agreements and County Agreements were updated to reflect the current eAgreement process. In EPG 153 Agreements and Contracts, the tables were updated to provide the current contract listings. 3/21/17: RW agreement guidance has been updated to current procedures. EPG 606.1.3.2 End Terminals, Crash Cushions and Anchors 3/20/17: Guidance about the grading limits was clarified when using MASH crashworthy end terminals for the exposed ends of all new runs of guardrail. EPG 616.14.10 Work Zone Transportation Management Plan 3/17/17: Guidance for WZ Transportation Management was clarified. 3/17/17: A new standard detailing note is available to show that it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously. Outdoor Advertising 3/16/17: in EPG 236.16.9.1 Substantially Rebuilt Conforming Out of Standard Outdoor Advertising and EPG 236.16.9.2 Deteriorated or Damaged Nonconforming Outdoor Advertising, the process for sending ODA courtesy letter was revised. EPG 903.18.4 Object Markers for Obstructions Adjacent to the Roadway 3/16/17: Object Marker usage policy was clarified, including new figures showing standard installation details. EPG 751.22.2.2 Prestressing Strands; Strand Arrangement Optimizing 3/8/17: New guidance for aligning NU top flange, straight and harped prestressing strands, when possible, in NU prestressed girders to aid in fabricating flange blockouts. Bridge Memo and Design Layout Requirements 3/8/17: Guidance in EPG 751.1.2.18.2 Content and EPG 751.1.2.31 Finishing Up Design Layout for bridge approach slabs requirements for Bridge Memo and the Design Layout was expanded and clarified. Galvanized Steel Pipes 3/7/17: Guidance in several articles, including EPG 751.1.2.20 Substructure Type , EPG 751.32.3 Details, EPG 751.36.2 Steel Pile and EPG 751.50 Standard Detailing Notes E.2, has been updated to require all steel pile (HP, Closed end CIP, Opened end CIP) to be galvanized. EPG 821 Herbicides and Roadsides 2/23/17: Guidance for products has been updated for 2017. Cost Estimate Guide for Rural Preliminary Design 2/21/17: In EPG 104.7 Estimates, the Cost Estimate Guide for rural preliminary design was updated. EPG 236.7.4.5 Subordination of Mortgage Liens 2/17/17: Guidance about the Partial Deed of Release has been updated to reflect current practices. Epoxy Coated Reinforcing 2/15/17: Guidance in EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements has expanded the use of epoxy coated reinforcement in bridge structures. Traffic Signal Maintenance 2/15/17: Signal-related preventive maintenance and inspection process guidance in EPG 902.4.2.1 Controller and Cabinet Replacement Program and EPG 902.5.8.3 Signal Maintenance was updated. 2/15/17: New and updated guidance provides permit requirements. Also, new EPG 129.13 Public Involvement for Stormwater guidance describes the public involvement process that allows input on new permits. 2/15/17: New guidance implements the Work Zone No Phone Zone signs. TA-50 was also updated. 2/10/17: Guidance about deflection fitting and expansion fitting requirements was clarified. EPG 751.40.2.3 Substructure Repair 2/9/17: Guidance for formed and unformed repair areas was clarified. Links to Maintenance Agreements 2/3/17: Several articles, such as EPG 171.1.1 Agreements, that have links to Maintenance Agreements, were updated due to the new eAgreements SharePoint site. EPG 616.6.87 Temporary Rumble Strips 1/17/17: Guidance has been updated and expanded. EPG 171.2, B&G(D2) Weigh Station Obligations 1/11/17: Due to a new MOU with MSHP, snow and ice removal will be performed for all paved surfaces immediately adjacent to weigh station facilities. EPG 134.1.3 Consultant Qualification 1/4/17: Guidance has been clarified that a firm is not required to submit a certificate of authority to become prequalified when the firm does work outside the jurisdiction of the MO Board for APEPLSPLA. 1/4/17: The Bridge Seismic Design Process Flowchart has been revised. |