Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.5.1.4)
m (EPG 751)
Line 45: Line 45:
 
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late September, the numbers of hits are:'''
 
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late September, the numbers of hits are:'''
 
|-
 
|-
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 164173
+
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 164246
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 224667
+
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 224837
 
|-
 
|-
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 169188     ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 256916
+
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 169271     ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 257202
 
|-
 
|-
|<font size = 2>'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 169413   ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 268216
+
|<font size = 2>'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 169478   ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 268283
 
|-
 
|-
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 177110     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 307891
+
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 177137     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 307891
 
|-
 
|-
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 184929 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 320418
+
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 184991 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 320796
 
|-
 
|-
|<font size = 2>'''15.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 189494   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 341736
+
|<font size = 2>'''15.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 189882   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 341963
 
|-
 
|-
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 190891   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 358310
+
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 191027   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 358843
 
|-
 
|-
|<font size = 2>'''13.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 191682     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 371670
+
|<font size = 2>'''13.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 191783     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 372129
 
|-
 
|-
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 205994   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 444327
+
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 206256   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 444488
 
|-
 
|-
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 214638   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2930439
+
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 214845   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2933133
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''End of Slab Guidance'''
 +
 +
9/29/17: In [[751.10 General Superstructure#751.10.1.10 Slab Offsets for Curved Bridges|EPG 751.10.1.10 Slab Offsets for Curved Bridges]] and [[751.10 General Superstructure#751.10.1.16 Plan of Slab Details|EPG 751.10.1.16 Plan of Slab Details]], guidance was clarified about how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents.  In [[751.6 General Quantities#751.6.2.10 Bridge Slabs|EPG 751.6.2.10 Bridge Slabs]] and
 +
[[751.50 Standard Detailing Notes#B3c. Slabs on Steel, Concrete and Semi-Deep Abutment, and Reinforced Concrete Slab Overlays|Note B3.21]], guidance about how to estimate slab quantities when expansion joint systems are present was clarified.
 +
 
'''[[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Addendums and Construction Changes|EPG 751.5.1.4 Contract Addendums and Construction Changes]]'''
 
'''[[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Addendums and Construction Changes|EPG 751.5.1.4 Contract Addendums and Construction Changes]]'''
  
Line 163: Line 168:
  
 
6/16/17: This new, useful spreadsheet is now available in [[606.1 Guardrail#Length of Need|EPG 606.1 Guardrail]].
 
6/16/17: This new, useful spreadsheet is now available in [[606.1 Guardrail#Length of Need|EPG 606.1 Guardrail]].
 
'''MSE Wall Plan Responsibilities'''
 
 
6/15/17: Different possible cases for MSE wall excavation were added in [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]]. Division responsibilities for preparing MSE wall plans, computing excavation quantities and locations were added in [[:Category:747 Bridge Reports and Layouts#747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems|EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems]].
 

Revision as of 11:35, 29 September 2017

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Watch crews install new pedestrian bridges for the Centennial Greenway Expansion. It’s part of the Great Rivers Greenway Centennial Greenway project, which calls for a 17 mile corridor between Forest Park in St. Louis to St. Peters in St. Charles County.
Providence Rd. between Bus. Loop 70 and I-70 in Columbia was designated the Sherman Brown Jr. Memorial Highway to honor the businessman and role model who died last year.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late September, the numbers of hits are:
20. EPG 136 164246  10. EPG 751.5 224837
19. EPG 134 169271  9. EPG 600 257202
18. EPG 751.40 169478  8. EPG 616.23 268283
17. EPG 136.4 177137  7. EPG 100 307891
16. EPG 620.2 184991  6. EPG 700 320796
15. EPG 751.50 189882  5. EPG 900 341963
14. EPG 200 191027  4. EPG 101 358843
13. EPG 903 191783  3. EPG 136.12 372129
12. EPG 136.9 206256  2. EPG 751 444488
11. EPG 616 214845  1. EPG Main Page 2933133

End of Slab Guidance

9/29/17: In EPG 751.10.1.10 Slab Offsets for Curved Bridges and EPG 751.10.1.16 Plan of Slab Details, guidance was clarified about how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents. In EPG 751.6.2.10 Bridge Slabs and Note B3.21, guidance about how to estimate slab quantities when expansion joint systems are present was clarified.

EPG 751.5.1.4 Contract Addendums and Construction Changes

9/28/17: Guidance for change orders to bridge plans was clarified.

Work Zone Transportation Management Plan

9/27/17: In EPG 616.14.8 Significant Projects, the criteria of "significant project" was revised. The requirements for TCP were revised in EPG 616.14.10 Work Zone Transportation Management Plan.

EPG 236.5.19 Survey Requirements

9/19/17: Guidance about who may prepare legal descriptions was clarified and brought into compliance with new legislation.

Typical Applications

9/18/17: MoDOT is implementing the National Safety Council’s 3-2-1 Cone Procedure for internal operations. TA-10, TA-10a and TA-10g were updated to reflect the new cone procedure.

EPG 751.22.2.2 Prestressing Strands

9/12/17: Clarified guidance that distances to hold-down devices and between hold-down devices for prestressed girders and beams should be reported on the plans to the nearest inch.

EPG 236.16.11 Cutout and Extension Process

9/1/17: Guidance for the cutout and extension process was updated to reflect current statutes.

EPG 236.4.4.1 Purpose

9/1/17: A checklist of items to determine property ownership for ADA projects was added.

Bridge Clearances

8/31/17: Guidance for bridge clearances was clarified in EPG 751.1.2.6 Vertical and Horizontal Clearances, EPG 751.1.2.16 Bridges Over Railroads, EPG 751.1.2.19.2 Content, EPG 751.5.2.1.1.5 Features Crossed and EPG 751.5.2.1.2.7 Features Crossed. In EPG 751.50 Standard Detailing Notes, notes A3.7 and E3.5 were also revised.

EPG 643.4.1.14 Railroad Crossing Median Islands

8/29/17: The speed limit threshold for using raised islands at railroad crossings was reduced from 45 mph to 40 mph and an option was added for locations with a speed limit of 45 mph or greater.

EPG 751.20.3.1 Solid Slabs

8/24/17: The intermediate bent beam cap height for solid slab end span was revised to accommodate commercially available forming systems.

Anchorage of Pile for Seismic Jobs

8/14/17: Guidance for the anchorage of pile for seismic jobs was revised in EPG 751.36.2 Anchorage of Piles for Seismic Categories B, C and D. Also, related standard detailing notes were revised and added.

EPG 625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing

8/10/17: Guidance for the measurement of liquid asphalt cement has been clarified.

EPG 760.1 Bridge Work Over Traffic

8/10/17: New guidance clarifies overhead work on bridges safety policy.

Emergency Vehicle Crossover Dimensions

8/8/17: Guidance in EPG 240 Maintenance and Emergency Crossovers revised the emergency vehicle crossover dimensions to 20' wide with a 10' radius to allow better utilization by fire/EMS responders.

EPG 610 Pavement Smoothness

8/7/17: Guidance is now available for the new Sec 610.

EPG 751.50 Standard Detailing Notes

7/25/17: Notes H2c.1.10 and H2c.1.11 were combined and revised and H2c1.38 was revised to clarify the location of the coil tie being referenced.

EPG 643.1.2 Utility Status

7/24/17: Guidance has been updated to current practice.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

7/11/17: DocuSign instructions have been made available in the guidance.

EPG 134.2.4 Consultant Solicitation and Selection Process

7/5/17: Guidance reflects the new 2017-2020 on-call consultant categories and lists.

EPG 822 Roadside Vegetation Management

7/5/17: Guidance was updated to promote and enhance pollinator habitat on right of way while addressing traveler safety and noxious weeds.

Asphalt Cement Price Index Adjustments

6/23/17: The updated document "Guidance for Asphalt Cement Price Index Adjustments" has been added to various articles including EPG 402.1.1 Plan Preparation and EPG 403 Asphaltic Concrete Pavement.

Longitudinal Beam Steps

6/19/17: Guidance about reinforcement details for longitudinal beam steps was clarified in EPG 751.31.3.1 Beam Cap and EPG 751.32.4.1 Typical Pile Cap Bent.

EPG 751.22.3.15 Dowel Bars

6/16/17: Guidance was clarified for the length requirements for prestressed girder bridges' dowel bars. "Dowel rods" were re-named "dowel bars".

Guardrail Length of Need Calculator

6/16/17: This new, useful spreadsheet is now available in EPG 606.1 Guardrail.