This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

147.4 Fixed Price Variable Scope (FPVS) Contracting: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per EPS, article temporarily removed
Tag: Replaced
Smithk (talk | contribs)
No edit summary
Line 1: Line 1:


{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  

Revision as of 14:18, 1 May 2020


EPG 147.4 Fixed Price Variable Scope (FPVS) Contracting
This article has been temporarily removed. Please contact your Central Office Design Liaison with any questions.