Difference between revisions of "Category:620 Pavement Marking"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per DE, uploaded a revised JSP)
 
(Per Traffic, new Practical Operations guidance)
Line 1: Line 1:
{|style="padding: 0.3em; margin-left:5px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
+
{|style="padding: 0.3em; margin-left:45px; border:2px solid #a9a9a9; text-align:left; font-size: 95%; background:#f5f5f5" width="250px" align="left"
 +
|-
 +
|colspan="2"|<center>'''[http://www.modot.mo.gov/business/standards_and_specs/NonstandardJobSpecialProvisions.htm Nonstandard JSPs]''' available for pavement marking include:</center>
 +
|-
 +
| ||[[media:620Bid Items Grooved Pavement Systems.doc|Bid Items Grooved Pavement Systems]]
 +
|-
 +
| ||[[media:620 Contrast Pavement Marking Epoxy.doc|Contrast Pavement Marking Epoxy]]
 +
|-
 +
| ||[[media:620 Contrast Pavement Markings High Build.doc|Contrast Pavement Markings High Build]]
 +
|-
 +
| ||[[media:620 Epoxy Wet Reflective Pavement Markings.doc|Epoxy Wet Reflective Pavement Markings]]
 +
|-
 +
| ||[[media:620 Grooving for Pavement Markings.doc|Grooving for Pavement Markings]]
 +
|-
 +
| ||[[media:620 High Build Wet Reflective Pavement Markings.doc|High Build Wet Reflective Pavement Markings]]
 +
|}
 +
 
 +
[[Image:620 Delineation System 3.jpg|465px|right]]
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
{|style="padding: 0.3em; margin-left:67px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="left"  
 
|-
 
|-
 
|'''Pavement Marking Management System'''
 
|'''Pavement Marking Management System'''
Line 12: Line 49:
 
|}
 
|}
  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:left; font-size: 95%; background:#f5f5f5" width="200px" align="right"  
+
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
==<center>'''Pavement Marking Guidelines</center>'''==
 +
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 +
|-
 +
!  !! !! Colspan="2" style="background:#BEBEBE"|Divided Highways !! style="background:#BEBEBE"|Undivided Highways
 +
|-
 +
!    !! !! style="background:#BEBEBE"|Lane Lines !! style="background:#BEBEBE"|All Other Markings !! style="background:#BEBEBE"|All Markings
 +
|-
 +
|rowspan="4" align="center" style="background:#F5F5F7"|'''Contractor Installations''' ||rowspan="2" align="center" style="width:15%"| '''Major Roads''' || rowspan="2" | Grooved in wet reflective system using either epoxy or high build paint.  Contrast markings on concrete.  Minimum initial readings of 450 mcd/m<sup>2</sup>/lux required || Waterborne paint with type P beads on “rumble stripes”|| Waterborne paint with type P beads on “rumble stripes”
 +
|-
 +
| Wet reflective paint system on “flat” lines|| Wet reflective paint system on “flat” lines
 
|-
 
|-
|colspan="2"|<center>'''[http://www.modot.mo.gov/business/standards_and_specs/NonstandardJobSpecialProvisions.htm Nonstandard JSPs]''' available for pavement marking include:</center>
+
| align="center"|'''Minor Roads''' || Waterborne paint with type P beads|| Waterborne paint with type P beads|| Waterborne paint with type P beads
 
|-
 
|-
| ||[[media:620Bid Items Grooved Pavement Systems.doc|Bid Items Grooved Pavement Systems]]
+
|align="center"|'''Intersection Markings'''||colspan="3"|Type 2 tape, preformed thermoplastic or waterborne paint
 
|-
 
|-
| ||[[media:620 Contrast Pavement Marking Epoxy.doc|Contrast Pavement Marking Epoxy]]
+
|rowspan="5" align="center" style="background:#F5F5F7"| '''MoDOT Forces''' ||align="center"| '''Major Roads''' – shall be striped by Memorial Day unless there is a performing durable marking||Waterborne paint with type PM beads|| Waterborne paint with type PM beads|| Waterborne paint with type PM beads
 
|-
 
|-
| ||[[media:620 Contrast Pavement Markings High Build.doc|Contrast Pavement Markings High Build]]
+
|align="center"|'''Regionally Significant Roads''' – shall be striped annually ||Waterborne paint with type PM beads|| Waterborne paint with type PM beads|| Waterborne paint with type PM beads
 
|-
 
|-
| ||[[media:620 Epoxy Wet Reflective Pavement Markings.doc|Epoxy Wet Reflective Pavement Markings]]
+
|align="center"|'''Other Minor Roads''' – maximum of 50 percent striped annually  ||Waterborne paint with type PM beads|| Waterborne paint with type PM beads|| Waterborne paint with type PM beads
 
|-
 
|-
| ||[[media:620 Grooving for Pavement Markings Dec 2010.doc|Grooving for Pavement Markings]]
+
|align="center"| '''Intersection Markings'''||colspan="3"|Type 2 tape, preformed thermoplastic or waterborne paint
 
|-
 
|-
| ||[[media:620 High Build Wet Reflective Pavement Markings.doc|High Build Wet Reflective Pavement Markings]]
+
|align="center"|'''Surface Treatments'''||Waterborne paint with type PM beads|| Waterborne paint with type PM beads|| Waterborne paint with type PM beads
 
|}
 
|}
 
[[Image:620 Delineation System 3.jpg|390 px|left]]
 

Revision as of 12:13, 4 January 2011

Nonstandard JSPs available for pavement marking include:
Bid Items Grooved Pavement Systems
Contrast Pavement Marking Epoxy
Contrast Pavement Markings High Build
Epoxy Wet Reflective Pavement Markings
Grooving for Pavement Markings
High Build Wet Reflective Pavement Markings










Pavement Marking Management System
Summary 2003
Report 2002
Report 2000
See also: Innovation Library







Pavement Marking Guidelines

Divided Highways Undivided Highways
Lane Lines All Other Markings All Markings
Contractor Installations Major Roads Grooved in wet reflective system using either epoxy or high build paint. Contrast markings on concrete. Minimum initial readings of 450 mcd/m2/lux required Waterborne paint with type P beads on “rumble stripes” Waterborne paint with type P beads on “rumble stripes”
Wet reflective paint system on “flat” lines Wet reflective paint system on “flat” lines
Minor Roads Waterborne paint with type P beads Waterborne paint with type P beads Waterborne paint with type P beads
Intersection Markings Type 2 tape, preformed thermoplastic or waterborne paint
MoDOT Forces Major Roads – shall be striped by Memorial Day unless there is a performing durable marking Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Regionally Significant Roads – shall be striped annually Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Other Minor Roads – maximum of 50 percent striped annually Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Intersection Markings Type 2 tape, preformed thermoplastic or waterborne paint
Surface Treatments Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads