Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 616.23)
m (EPG 616 Work Zonefigures)
Line 27: Line 27:
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''Updated EPG 616 Work Zone Figures'''
 +
 +
2/3/11: Twelve of the [[:Category:616 Temporary Traffic Control#Work Zone Figures|work zone figures]] were updated to reflect the new work zone speed limit policy.
 +
 
'''Updated TAs for New Work Zone Speed Limit Policy'''
 
'''Updated TAs for New Work Zone Speed Limit Policy'''
  
Line 110: Line 114:
  
 
10/20/10: Four weeks, instead of one week, are now allotted to clear final payments to subcontractors so the prime contractor can submit final documentation.
 
10/20/10: Four weeks, instead of one week, are now allotted to clear final payments to subcontractors so the prime contractor can submit final documentation.
 
'''Chevron Initiative Information in [[903.6 Warning Signs#903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.10)|EPG 903.6.11]]'''
 
 
10/12/10:  Chevrons are to be placed on all curves having a 15 mph difference between the posted speed limit and the curve's advisory speed.
 

Revision as of 10:37, 3 February 2011


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Senior Maintenance Worker Scott Croney smooths a driveway approach with a shovel before the rock is compacted.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

MoDOT Director Kevin Keith presents Senior Construction Inspector Brent Swan with a certificate of appreciation for saving the life of a co-worker.

Updated EPG 616 Work Zone Figures

2/3/11: Twelve of the work zone figures were updated to reflect the new work zone speed limit policy.

Updated TAs for New Work Zone Speed Limit Policy

1/31/11: Most of the TAs in EPG 616.23 Traffic Control for Field Operations have been updated to reflect the new work zone speed limit policy.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

1/14/11: The SWPPP has been updated.

Herbicides

1/12/11: EPG 821.25 Products now presents the herbicides used by MoDOT in 2011.

EPG 144 Practical Operations

1/6/11: This new article provides general guidance for MoDOT's new direction in snow and ice control, signing, striping, mowing and pavement operations.

EPG 616.23.3.28 TA-28

1/4/11: TA-28 was revised to provide guidance for maintaining work zones on continuous alternating passing lanes ("shared 4-lanes").

EPG 616.29 Work Zone Speed Limits

1/4/11: This new article and EPG 616.1.3 present a consistent work zone speed limit policy.

Practical Operations

1/4/11: You've waited for it and now it has been approved. Updated guidance reflecting MoDOT's new Practical Operations direction can be found at:

Signing: EPG 903
Snow and Ice Control: EPG 133, EPG 133.1.3, EPG 133.1.4, EPG 133.4 and EPG 133.5.
Striping: EPG 620, EPG 620.1 and EPG 616.23.2.5.7

Updated mowing guidance will be provided at a later date.

Impact Attenuator Guidance in EPG 612.1

1/4/11: TMA guidance is now provided for incident response operations.

Reclaimed Asphalt Guidance in EPG 402.1.2, EPG 403.1.2 and EPG 460.3.11

1/4/11: SP048 is now to be used for higher volume routes and BP3 used for lower volume routes.

EPG 941.37 "Welcome To" Monuments for Cities

12/30/10: Guidance for Welcome To signage has been expanded to include non-breakaway monuments.

Partnership Development

12/21/10: Resource Management has updated guidance in two re-titled articles: EPG 141.1 Cost Share Program and EPG 141.2 Missouri Transportation Finance Corporation (MTFC) Loans.

EPG 127.25.1.4 Street Sweepings

12/21/10: Maintenance has clarified and expanded guidance for street sweeping.

EPG 141.7 Transportation Improvement Program Approval

11/30/10: This new article provides Transportation Planning's guidance for existing policy.

Transportation Management Systems (TMS)

11/23/10: EPG 145 now presents handy TMS information.

Disadvantaged Business Enterprise (DBE) Policy

11/23/10: EPG 146 is now available for DBE policy.

EPG 613.1.2 Class A Partial Depth Pavement Repairs

11/18/10: In Districts 1 and 4, Class B (instead of Class A) or full depth pavement repair should be considered due to the region's poor quality aggregate.

EPG 616.28 Traffic Control for Waterways

10/28/10: Traffic control for waterways guidance is now available.

NU Girder Info in EPG 751.22

10/27/10: Two options are now available for NU girder end section reinforcement. Also, maximum haunching has been increased to 4.5".

Date of Final Inspection in EPG 108.16.2

10/20/10: Four weeks, instead of one week, are now allotted to clear final payments to subcontractors so the prime contractor can submit final documentation.