Difference between revisions of "Category:620 Pavement Marking"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (→‎Pavement Marking Guidelines: Per TS, clarification of paint types available to contractors)
m (→‎Pavement Marking Guidelines: Per TS, added decision tree figure)
Line 45: Line 45:
 
|colspan="5" align="left"|<sup>'''1'''</sup>  See [[620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers#620.13.5 Acceptance|Pavement Marking Acceptance Table]]   
 
|colspan="5" align="left"|<sup>'''1'''</sup>  See [[620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers#620.13.5 Acceptance|Pavement Marking Acceptance Table]]   
 
|}
 
|}
 +
 +
 +
[[image:620 decision.jpg|center|900px]]

Revision as of 13:24, 8 July 2015












Pavement Marking Guidelines

Divided Highways Undivided Highways Intersection Markings
Contractor Installations Major Roads High Build Paint with Type L Beads High Build Paint with Type L Beads Type 2 Tape
Minor Roads Not applicable Waterborne Paint with Type P Beads
MoDOT Installations Major Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Waterborne Paint with Type L beads (60° and rising) Waterborne Paint with Type PM beads (60° and rising) Type 2 tape, preformed thermoplastic or waterborne paint with Type PM beads
Regionally Significant Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Not applicable Waterborne Paint with Type PM beads (50° and rising)
or
Cold weather paint with Type PM beads (35° to 50°)
Minor Roads≥400 AADT – maximum of 50% striped annually
Minor Roads<400 AADT – maximum of 33.3% striped annually
Surface Treatments
1 See Pavement Marking Acceptance Table


620 decision.jpg