[http://www.modot.mo.gov/business/standards_and_specs/Sec0106.pdf Sec 106.8] provides information regarding material furnished by the Commission.  The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.  
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.8] provides information regarding material furnished by the Commission.  The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.  




[[category: 106 Control of Material|106.08]]
[[category: 106 Control of Material|106.08]]

Latest revision as of 12:49, 8 June 2016

Sec 106.8 provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.