Difference between revisions of "Main Page"
m (EPG 903) |
m (EPG 109.1) |
||
Line 45: | Line 45: | ||
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | {| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | ||
|- | |- | ||
− | |colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have. As of | + | |colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have. As of late September, the numbers of hits are:''' |
|- | |- | ||
− | |'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], | + | |'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 142015 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 193808 |
|- | |- | ||
− | |'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]], | + | |'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]], 145364 ||'''9.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 227837 |
|- | |- | ||
− | |'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], | + | |'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 147072 ||'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 249783 |
|- | |- | ||
− | |'''17.''' [[751.50 Standard Detailing Notes|EPG 751.50]], | + | |'''17.''' [[751.50 Standard Detailing Notes|EPG 751.50]], 155737 ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 278136 |
|- | |- | ||
− | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], | + | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 157998 ||'''6.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 286282 |
|- | |- | ||
− | |'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], | + | |'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 164232 ||'''5.''' [[:Category:101 Standard Forms|EPG 101]], 294237 |
|- | |- | ||
− | |'''14.''' [[:Category:903 Highway Signing|EPG 903]], | + | |'''14.''' [[:Category:903 Highway Signing|EPG 903]], 169868 || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 312076 |
|- | |- | ||
− | |'''13.''' [[:Category:200 GEOMETRICS|EPG 200]], | + | |'''13.''' [[:Category:200 GEOMETRICS|EPG 200]], 174168 || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 335272 |
|- | |- | ||
− | |'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], | + | |'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 177211 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 383218 |
|- | |- | ||
− | |'''11.''' [[751.5 Standard Details|EPG 751.5]], | + | |'''11.''' [[751.5 Standard Details|EPG 751.5]], 179953 ||'''1.''' EPG Main Page, 2499559 |
|} | |} | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[:Category:109 Measurement and Payment#109.1 Measurement of Quantities (for Sec 109.1)|EPG 109.1 Measurement of Quantities]]''' | ||
+ | |||
+ | 9/22/16: Guidance about measuring quantities was clarified. | ||
+ | |||
'''[[903.2 Extent of Signing#903.2.12 Quantity Computations|EPG 903.2.12 Quantity Computations]] and [[903.3 Post-Mounted Signing|EPG 903.3 Post-Mounted Signing]]''' | '''[[903.2 Extent of Signing#903.2.12 Quantity Computations|EPG 903.2.12 Quantity Computations]] and [[903.3 Post-Mounted Signing|EPG 903.3 Post-Mounted Signing]]''' | ||
Line 164: | Line 168: | ||
6/28/16: Guidance involving an outdated JSP was revised. | 6/28/16: Guidance involving an outdated JSP was revised. | ||
− | |||
− | |||
− | |||
− |
Revision as of 09:53, 22 September 2016
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 109.1 Measurement of Quantities 9/22/16: Guidance about measuring quantities was clarified. EPG 903.2.12 Quantity Computations and EPG 903.3 Post-Mounted Signing 9/15/16: Revisions have brought these articles' guidance into conformance with various recent standard plan and policy changes. EPG 110.3 Prevailing Wages and Records 9/14/16: Guidance has been updated to comply with the e-Construction JSP. For instance, #6a now reminds payroll checkers to consider overtime rules and #7c clarifies how to handle subsistence withholdings made by contractors. EPG 131.1 Design Exception Process 9/6/16: Federal rules have reduced the controlling criteria to 10, reducing the instances in which federal approval is required on federal involvement projects. The expectations for documentation have also been updated. EPG 907.1 Safety Program Guidelines 8/26/16: New guidance for safety funds is now available. Also, the article was generally restructured and clarified. EPG 127.7 Threatened and Endangered Species 8/25/16: This article was updated and clarified, including the addition of new info on migratory birds. 8/25/16: Guidance for the use of a vibratory screed was expanded and clarified. EPG 401.2.3 Job Mix Formula and EPG 460.3.13 Asphalt Binder Sampling 8/24/16: In EPG 401.2.3, contractors are allowed flexibility in the field to make bin adjustments provided the specs are satisfied. In EPG 460.3.13 Asphalt Binder Sampling, the collection of a third pint can of binder as the retained sample is the appropriate procedure. 8/24/16: Guidance was revised to reflect recent updates to Sec 401. Includes revisions to the TSR verbiage, plant setting adjustments by the contractor without prior approval, average core results for acceptance and the approach to Plasticity Index. 8/24/16: Incidental grading for Type A end terminals was deleted so that a separate pay item could be included for prime contractors to bid on projects. EPG 751.40.2.4 Deck Repair and Filled Joints and EPG 751.6.1 Index of Quantities 8/24/16: Hydro Demolition updates to drawings and pay items. EPG 643.2 Local Utility Adjustments - Public and Private 8/24/16: This article was generally updated to reflect current practice. 8/24/16: Criteria for minimum bridge width was expanded to include National Bridge Inventory rating system requirements for bridge width. EPG 751.13.6.4 Slab Details and EPG 751.13.6.5 Barrier Curb Details 8/24/16: New EPG 751.13.4 shows slab extensions at the ends of finger plate expansion devices and additional bars in extension. New guidance for barrier curb reinforcement at the ends of finger plate expansion devices in EPG 751.13.5. Work Zone and Work Area Lighting Requirements 8/24/16: Guidance in EPG 616.18 Construction Inspection Guidelines for Sec 616 now reflects the deletion of Pay Item 616.2010 WORK ZONE LIGHTING. EPG 110.3 Prevailing Wages and Records 8/19/16: New guidance is available to address final plans paperwork requirements for contractors. 8/12/16: The different bases of payments for consultant contracts were clarified. 8/12/16: Text stating that MOUs are "..for the quick delivery of small projects that are limited in scope" was removed. Also, the MOU Checklist was clarified to better align with guidance. EPG 237.9 Submission of Plans and Supporting Documents 7/29/16: This article has been generally revised to provide current guidance for the submission of plans and supporting documents for eProjects. EPG 236.3.4.3 Acquisition Authority and Project Funding for Design-Build Projects 7/26/16: The Design Build Project A-Date process was updated. EPG 236.3.7.5 Distribution of Clearance Certification 7/26/16: Additional guidance has been provided on the distribution of ROW Clearance Certifications. EPG 134.1.5 Suspension/Debarment 7/5/16: The $100,000 contract threshold was removed from the certification requirements for suspension and debarment to make guidance consistent with consultant contract language. EPG 616.6.12 Work Zone and Higher Fines Signs and Plaques and EPG 616.12.1 WORK ZONE FINE Sign 7/1/16: PASS WITH CARE signs no longer need to have a work zone plaque mounted above them. EPG 751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts 6/28/16: Guidance was clarified that bridge rails on single lane bridges may be used in place if the grade is not raised. EPG 450.9 Safety Edge and EPG 550.1 Safety Edge 6/28/16: Guidance involving an outdated JSP was revised. |