Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.40.2.3)
m
Line 47: Line 47:
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early December, the numbers of hits are:'''
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early December, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 145999   ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 197045
+
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 146203   ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 197176
 
|-
 
|-
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 150221   ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 232414
+
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 150366   ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 232615
 
|-
 
|-
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 152096   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 253763
+
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 152234   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 253897
 
|-
 
|-
|'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 161178     ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 283658
+
|'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 161274     ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 283863
 
|-
 
|-
|'''16.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 162106     ||'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 293824
+
|'''16.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 162332     ||'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 294192
 
|-
 
|-
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 168525     ||'''5.'''  [[:Category:101 Standard Forms|EPG 101]], 307625
+
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 168714     ||'''5.'''  [[:Category:101 Standard Forms|EPG 101]], 308005
 
|-
 
|-
|'''14.'''    [[:Category:903 Highway Signing|EPG 903]], 173906     || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 316813
+
|'''14.'''    [[:Category:903 Highway Signing|EPG 903]], 174302     || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 317075
 
|-
 
|-
|'''13.'''    [[:Category:200 GEOMETRICS|EPG 200]], 176925   || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 343360
+
|'''13.'''    [[:Category:200 GEOMETRICS|EPG 200]], 177041   || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 343768
 
|-
 
|-
|'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 188374   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 397029
+
|'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 188732   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 397579
 
|-
 
|-
|'''11.'''    [[751.5 Standard Details|EPG 751.5]], 192161   ||'''1.''' EPG Main Page, 2584141
+
|'''11.'''    [[751.5 Standard Details|EPG 751.5]], 192641   ||'''1.''' EPG Main Page, 2586966
 
|}
 
|}
  

Revision as of 14:59, 8 December 2016

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Demolition of the old Platte Purchase Bridge is underway. The new US 69 Missouri River Bridge, which is replacing it, is partially open.
Clarkson Construction Company crews pour concrete for the new Grand Ave. bridge over I-670 in downtown Kansas City. The project is expected to reopen Grand Ave. to traffic by Dec. 1.
The Rte. 50/63 Lafayette Interchange was dedicated in a ribbon-cutting ceremony with Boys & Girls Club of Jefferson City, Lincoln Univ. (MO) Army ROTC, Lincoln Univ. (MO), Jefferson City Public Schools, Quinn Chapel AME Church Jefferson City, Mo., Sen. Mike Kehoe, City of Jefferson, Missouri, Central Dist. Engineer David Silvester and many others.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of early December, the numbers of hits are:
20. EPG 136, 146203 10. EPG 616, 197176
19. EPG 134, 150366 9. EPG 600, 232615
18. EPG 751.40, 152234 8. EPG 616.23, 253897
17. EPG 136.4, 161274 7. EPG 100, 283863
16. EPG 751.50, 162332 6. EPG 700, 294192
15. EPG 620.2, 168714 5. EPG 101, 308005
14. EPG 903, 174302 4. EPG 900, 317075
13. EPG 200, 177041 3. EPG 136.12, 343768
12. EPG 136.9, 188732 2. EPG 751, 397579
11. EPG 751.5, 192641 1. EPG Main Page, 2586966

EPG 751.40.2.3 Substructure Repair

12/6/16: General guidance was added for rehabilitating existing bent cap using fiber reinforced polymer reinforcement for shear strengthening.

EPG 460.3.13 Asphalt Binder Sampling

12/5/16: New guidance for submission of initial daily binder sample will ensure timely testing.

Right of Way Acquisition Authority

12/5/16: New guidance for federally funded early acquisition of a parcel is now available in EPG 236.3.4.4 Advance Acquisition - Hardship and Protective Buying.

Form Liner Requirements for Large Block Wall

12/5/16: Guidance in EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems and EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls was clarified for form liner requirements for large block walls.

Standard Detailing Note J1.20a

11/22/16: The shop drawing requirements in this note were clarified.

Hairpin Bars

11/22/16: Hairpin guidance in EPG 751.10.1.14 Girder Haunch Reinforcement was expanded and clarified, especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.

Girder Reinforcement

11/22/16: In EPG 751.22 P/S Concrete I Girders, guidance for shear reinforcement was updated to current practice. Guidance for A1 reinforcement was revised to not use the WWR located in the flange of NU girders.

MoDOT and the Environment

11/10/16: Guidance in EPG 127.9 Floodplain Management and the Regulatory Floodway, EPG 127.11 Farmland Conversion and EPG 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties was updated to reflect new processes and forms.

New QRGs

11/9/16: The Land Disturbance QRG was replaced with three new Land Disturbance QRGs.

EPG 236.6.2 Scope of Assignment

11/9/16: Guidance was updated to reflect current practices. "Scope of Assignment for Simple Assignment or Experienced Staff and Fee" was removed.

EPG 106.16 Special Designs

11/8/16: Guidance for handling drawings from suppliers was expanded.

EPG 643.2.16.1 Buy America Guidelines for Utilities

11/1/16: Guidance has reverted to the previous, more relaxed, FHWA interpretation of Buy America.

Title Datum and Allied Services

11/1/16: Guidance in EPG 236.4.4.5 Agreements Between Commission and Abstractor or Title Companies and EPG 236.4.4.7 Procedure for Obtaining Title Services updated the agreements between Commission and abstractor or title companies to be current with business practices.

EPG 616.16 Law Enforcement Services

11/1/16: Guidance provided for incorporating law enforcement into contractor projects and maintenance operation work zones.

EPG 153 Agreements and Contracts

10/26/16: Guidance has been updated due to implementation of eAgreements.

EPG 751.50, H3. Bearings and I1.51

10/25/16: Notes H3.29.1, H3.49.1 and I1.51 were revised.

EPG 236.5.21.5 Full Disclosure Clause

9/29/16: The full disclosure clause was updated to reflect how MoDOT currently handles property conveyances.

EPG 751.5.1.4 Contract Addendums and Construction Changes

9/29/16: Guidance for change orders to bridge plans has been revised.

EPG 751.36.2 Steel Pile

9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified.

Value Engineering

9/23/16: EPG 130.1 Discussion was updated to reflect the tracker identified goal. A new workbook is available for a district-led Value Analysis.

Preliminary Design of a Bridge

9/23/16: EPG 751.1.1 Overview has been updated to reflect current practice.

EPG 751.10.1.11 Slab Elevations

9/23/16: Guidance is now coordinated with MicroStation cells.

EPG 237.2.8 Utility Information Note

9/23/16: The note required to be placed on the title sheet has been expanded.

EPG 109.1 Measurement of Quantities

9/22/16: Guidance about measuring quantities was clarified.

EPG 903.2.12 Quantity Computations and EPG 903.3 Post-Mounted Signing

9/15/16: Revisions have brought these articles' guidance into conformance with various recent standard plan and policy changes.