Difference between revisions of "Main Page"
m |
m (EPG 751.40.2.3) |
||
Line 46: | Line 46: | ||
|colspan="4" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have. As of early February, the numbers of hits are:''' | |colspan="4" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have. As of early February, the numbers of hits are:''' | ||
|- | |- | ||
− | |<font size = 2>'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> | + | |<font size = 2>'''20.''' [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 150922 ||<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 202651 |
|- | |- | ||
− | |<font size = 2>'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> | + | |<font size = 2>'''19.''' [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 153785 ||<font size = 2>'''9.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 237475 |
|- | |- | ||
− | |<font size = 2>'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> | + | |<font size = 2>'''18.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 157307 ||<font size = 2>'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 257163 |
|- | |- | ||
− | |<font size = 2>'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> | + | |<font size = 2>'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 165595 ||<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 289429 |
|- | |- | ||
− | |<font size = 2>'''16.''' [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> | + | |<font size = 2>'''16.''' [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 167523 ||<font size = 2>'''6.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 299910 |
|- | |- | ||
− | |<font size = 2>'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> | + | |<font size = 2>'''15.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 172912 ||<font size = 2>'''5.''' [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 319025 |
|- | |- | ||
− | |<font size = 2>'''14.''' [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> | + | |<font size = 2>'''14.''' [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 179990 ||<font size = 2> '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 322607 |
|- | |- | ||
− | |<font size = 2>'''13.''' [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> | + | |<font size = 2>'''13.''' [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 180520 ||<font size = 2> '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 350361 |
|- | |- | ||
− | |<font size = 2>'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> | + | |<font size = 2>'''12.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 193913 ||<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 408278 |
|- | |- | ||
− | |width="130"|<font size = 2>'''11.''' [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> | + | |width="130"|<font size = 2>'''11.''' [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 201169 || width="150"|<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2656817 |
|} | |} | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[751.40 Widening and Repair (LFD and Not Updated)#751.40.2.3 Substructure Repair|EPG 751.40.2.3 Substructure Repair]]''' | ||
+ | |||
+ | 2/9/17: Guidance for formed and unformed repair areas was clarified. | ||
+ | |||
'''Links to Maintenance Agreements''' | '''Links to Maintenance Agreements''' | ||
Line 163: | Line 167: | ||
9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified. | 9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified. | ||
− | |||
− | |||
− | |||
− |
Revision as of 14:21, 9 February 2017
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | ||||||||||||||||||||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 751.40.2.3 Substructure Repair 2/9/17: Guidance for formed and unformed repair areas was clarified. Links to Maintenance Agreements 2/3/17: Several articles, such as EPG 171.1.1 Agreements, that have links to Maintenance Agreements, were updated due to the new eAgreements SharePoint site. EPG 616.6.87 Temporary Rumble Strips 1/17/17: Guidance has been updated and expanded. EPG 171.2, B&G(D2) Weigh Station Obligations 1/11/17: Due to a new MOU with MSHP, snow and ice removal will be performed for all paved surfaces immediately adjacent to weigh station facilities. EPG 134.1.3 Consultant Qualification 1/4/17: Guidance has been clarified that a firm is not required to submit a certificate of authority to become prequalified when the firm does work outside the jurisdiction of the MO Board for APEPLSPLA. 1/4/17: The Bridge Seismic Design Process Flowchart has been revised. EPG 751.40.2.3 Substructure Repair 12/6/16: General guidance was added for rehabilitating existing bent cap using fiber reinforced polymer reinforcement for shear strengthening. EPG 460.3.13 Asphalt Binder Sampling 12/5/16: New guidance for submission of initial daily binder sample will ensure timely testing. Right of Way Acquisition Authority 12/5/16: New guidance for federally funded early acquisition of a parcel is now available in EPG 236.3.4.4 Advance Acquisition - Hardship and Protective Buying. Form Liner Requirements for Large Block Wall 12/5/16: Guidance in EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems and EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls was clarified for form liner requirements for large block walls. Standard Detailing Note J1.20a 11/22/16: The shop drawing requirements in this note were clarified. Hairpin Bars 11/22/16: Hairpin guidance in EPG 751.10.1.14 Girder Haunch Reinforcement was expanded and clarified, especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel. Girder Reinforcement 11/22/16: In EPG 751.22 P/S Concrete I Girders, guidance for shear reinforcement was updated to current practice. Guidance for A1 reinforcement was revised to not use the WWR located in the flange of NU girders. MoDOT and the Environment 11/10/16: Guidance in EPG 127.9 Floodplain Management and the Regulatory Floodway, EPG 127.11 Farmland Conversion and EPG 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties was updated to reflect new processes and forms. 11/9/16: The Land Disturbance QRG was replaced with three new Land Disturbance QRGs. EPG 236.6.2 Scope of Assignment 11/9/16: Guidance was updated to reflect current practices. "Scope of Assignment for Simple Assignment or Experienced Staff and Fee" was removed. 11/8/16: Guidance for handling drawings from suppliers was expanded. EPG 643.2.16.1 Buy America Guidelines for Utilities 11/1/16: Guidance has reverted to the previous, more relaxed, FHWA interpretation of Buy America. Title Datum and Allied Services 11/1/16: Guidance in EPG 236.4.4.5 Agreements Between Commission and Abstractor or Title Companies and EPG 236.4.4.7 Procedure for Obtaining Title Services updated the agreements between Commission and abstractor or title companies to be current with business practices. EPG 616.16 Law Enforcement Services 11/1/16: Guidance provided for incorporating law enforcement into contractor projects and maintenance operation work zones. EPG 153 Agreements and Contracts 10/26/16: Guidance has been updated due to implementation of eAgreements. EPG 751.50, H3. Bearings and I1.51 10/25/16: Notes H3.29.1, H3.49.1 and I1.51 were revised. EPG 236.5.21.5 Full Disclosure Clause 9/29/16: The full disclosure clause was updated to reflect how MoDOT currently handles property conveyances. EPG 751.5.1.4 Contract Addendums and Construction Changes 9/29/16: Guidance for change orders to bridge plans has been revised. 9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified. |