Difference between revisions of "Talk:903.18 Signing for School Areas"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (Smithk moved page Talk:903.19 Signing for School Areas to Talk:903.18 Signing for School Areas: This article and subsequent EPG 903 articles (EPG 903.15 - EPG 903.24) were renumbered (became EPG 903.14 - 903.23) when TS deleted EPG 903.14 Emergency Management Signing.))
 
(No difference)

Latest revision as of 10:33, 18 November 2020

The mention of contracts for school signing needed is hidden at the end of the signing under a section that looks like it just talks about the addition of a plaque. Because these signs are required to have contracts and crossing guards, I believe the information about contracts should be placed at or near the front, bolded, or in some other way stick out to grab your attention that contracts are in deed required before installation.

Keith L. Smith: Man, did you hit the jackpot. Traffic had been planning on some changes and your suggestion tied right into those plans. They have updated several areas of the article. Thank you for your suggestions.