User contributions for Jonesjb
Jump to navigation
Jump to search
11 July 2014
- 12:0612:06, 11 July 2014 diff hist 0 N File:402 CLC CONTRACTOR STRIPE.pdf No edit summary
- 12:0612:06, 11 July 2014 diff hist −175 Category:402 Bituminous Surface Leveling No edit summary
- 12:0212:02, 11 July 2014 diff hist 0 N File:402 JSP FY15.doc No edit summary current
9 July 2014
- 13:4513:45, 9 July 2014 diff hist −5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor clarifications
25 March 2014
- 12:0812:08, 25 March 2014 diff hist +125 m 606.2 Guard Cable →606.2.7 Construction Inspection Guidelines for Guard Cable: Clarified policy on 4:1 approved systems.
- 11:5911:59, 25 March 2014 diff hist +12 m 606.2 Guard Cable →606.2.4.4 Slopes: Updated information on proprietary systems to more accurately reflect the state of the industry.
19 March 2014
- 10:3610:36, 19 March 2014 diff hist +3 m Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): Clarified intent
11 February 2014
- 13:3413:34, 11 February 2014 diff hist −4 m 606.1 Guardrail →606.1.3.9 Bridge Ends: Clarified wording
6 December 2013
- 07:4307:43, 6 December 2013 diff hist +2 m Category:503 Bridge Approach Slabs →503.2 Minor Roads: Corrected misspelling
21 August 2013
- 08:2008:20, 21 August 2013 diff hist +26 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified 3R requirements for upgrading bridge end connections.
24 July 2013
- 07:0907:09, 24 July 2013 diff hist 0 m 606.1 Guardrail →606.1.3.7 Fixed Objects: Updated Roadside Design Guide figure number
13 June 2013
- 07:0307:03, 13 June 2013 diff hist +235 m Help Article →Use of Terms in the EPG: Terms clarified to match the same definitions elsewhere in the EPG.
19 March 2013
- 13:5313:53, 19 March 2013 diff hist +74 m Category:645 Mailbox Turnouts and Supports Added a link to Standard Plan 203.35 for added convenience.
18 December 2012
- 06:2806:28, 18 December 2012 diff hist +85 m 606.2 Guard Cable →606.2.3 Warrants: Clarified the effect of median width on cable warrants
20 November 2012
- 07:5607:56, 20 November 2012 diff hist +25 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Clarified the intent of Safety Edge on paved shoulders.
8 November 2012
- 15:3415:34, 8 November 2012 diff hist −21 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Slightly re-worded for clarity
10 October 2012
- 10:3410:34, 10 October 2012 diff hist +35 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Clarified the depth measurement for drop inlets.
17 September 2012
- 14:0514:05, 17 September 2012 diff hist +23 Category:Minor Routes Shouldering Project Guidelines →Minimum Expectations
13 September 2012
- 13:0213:02, 13 September 2012 diff hist 0 File:409 JSP Sept 2012.doc uploaded a new version of "Image:409 JSP Sept 2012.doc" current
5 September 2012
- 13:3713:37, 5 September 2012 diff hist +19 m 230.2 Vertical Alignment →230.2.10 Bridge Considerations: Clarified intent of design exception.
3 August 2012
- 10:5710:57, 3 August 2012 diff hist +64 m Category:Minor Routes Shouldering Project Guidelines →Minimum Expectations: Safety Edge added as minimum requirement.
25 July 2012
- 09:5209:52, 25 July 2012 diff hist −27,953 m 606.1 Guardrail Removed accidental replication
- 07:4907:49, 25 July 2012 diff hist +27,879 606.1 Guardrail Published the new guardrail height requirements per FHWA and AASHTO.
- 07:3907:39, 25 July 2012 diff hist −9 m 606.2 Guard Cable →606.2.4.1 Lateral Placement in the Median: Wordsmithing
- 07:3707:37, 25 July 2012 diff hist +345 m 606.2 Guard Cable →606.2.4.1 Lateral Placement in the Median: Clarified the parameters of lateral placement of high-tension cable barriers in the median.
27 April 2012
- 14:0014:00, 27 April 2012 diff hist +233 m Category:130 Value Engineering →130.1.3 VE Workplan/Project Selection: Added cost thresholds for federally required Value Engineering Studies
17 April 2012
- 08:5308:53, 17 April 2012 diff hist −234 m 606.2 Guard Cable →606.2.5 Maintenance and Repair: Removed superfluous text.
22 February 2012
- 08:1208:12, 22 February 2012 diff hist 0 m 903.6 Warning Signs Legal vehicle height in commercial zone corrected to 15 ft.
8 February 2012
- 12:2512:25, 8 February 2012 diff hist −403 m 233.2 At-Grade Intersections with Stop and Yield Control Removed unrealistic requirement for 3 years evaluation of median acceleration lanes.
- 11:2311:23, 8 February 2012 diff hist −5 m Category:626 Rumble Strips Clarified the intent of collaboration on the omission and modification of systemwide safety treatments.
9 January 2012
- 12:5012:50, 9 January 2012 diff hist +82 m 171.6 Roadsides →RDS(E10) Clear Zone: Clarified the resources for establishing and maintaining clear zones.
- 12:3112:31, 9 January 2012 diff hist +27 m 120.6 Roadsides →Performance Objectives: Changes the zone of hardscape prohibition from the static 30 ft. to the more inclusive 'clear zone.'
- 10:5510:55, 9 January 2012 diff hist +29 m 902.18 Glossary Clarified definition of 'Clear Zone' to more accurately reflect the AASHTO definition.
- 10:0810:08, 9 January 2012 diff hist +398 m 231.2 Clear Zones →231.2.1 Introduction: Clarified the difference between a deliberate 'Clear Zone' and an incidental 'Clear Area.'
4 January 2012
- 09:4709:47, 4 January 2012 diff hist +43 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Clarified oversight parameters.
3 January 2012
- 14:4814:48, 3 January 2012 diff hist +162 m 231.4 Shoulder Width →231.4.1 Introduction: Added additional information (link) on the material composition of a shoulder.
29 December 2011
- 10:4610:46, 29 December 2011 diff hist +32 Talk:Article X No edit summary current
- 10:4510:45, 29 December 2011 diff hist +31 N Talk:Article X New page: I don't think 7.2.2 is correct?
28 December 2011
- 09:2809:28, 28 December 2011 diff hist −102 m 231.8 Bridge Width Removed inaccurate design information concerning shoulder requirements
20 July 2011
- 14:2414:24, 20 July 2011 diff hist −8 m 236.3 Administration →236.3.4.13 Acquisition of Property from an Employee or a Commissioner of MHTC: Changed title to reflect MoDOT's restructuring.
14 July 2011
- 12:1412:14, 14 July 2011 diff hist +3 m Category:235 Preliminary Plans →235.2 Procedure: Added missing word.
21 June 2011
- 09:1909:19, 21 June 2011 diff hist −3 m Category:123 Federal-Aid Highway Program Full oversight warrants brought in line with the 2011 FHWA/MoDOT Partnering Agreement.
8 April 2011
18 February 2011
- 15:2415:24, 18 February 2011 diff hist −122 m Category:626 Rumble Strips →626.1 Edgeline Rumble Strips: Removed incorrect reference to a marking material.
30 December 2010
- 13:5313:53, 30 December 2010 diff hist +10 m 127.13 Noise →127.13.4.6 Reasonableness and Feasibility of Abatement: clarified datum for soundwall height.
29 December 2010
- 10:5110:51, 29 December 2010 diff hist 0 617.1 Temporary Traffic Barriers Changed index number to 617
- 10:4310:43, 29 December 2010 diff hist 0 m 617.1 Temporary Traffic Barriers →616.1.2.3. Proprietary Temporary Traffic Barrier: Changed index number to 617
5 October 2010
- 07:5607:56, 5 October 2010 diff hist −153 Category:402 Bituminous Surface Leveling →402.1.3 Traffic Control, Pavement Marking and Signing: Removed erroneous payment information.
17 September 2010
- 09:4209:42, 17 September 2010 diff hist +69 m 136.8 Preliminary Design →136.8.6 Utility Relocations: Changed MoDOT's membership status for Missouri One Call.
2 September 2010
- 10:5510:55, 2 September 2010 diff hist +10 m LPA:136.4 Consultant Selection and Consultant Contract Management Updated link to sample solicitation form