Main Page

From Engineering_Policy_Guide
Revision as of 09:47, 6 October 2010 by Smithk (talk | contribs) (Revisions to EPG 106, 136, 616, 643 and 1026 noted)
Jump to navigation Jump to search


HELPFUL EPG VIDEO: Finding Info in the EPG
WELCOME
RECENT POLICY CHANGES IN THE EPG
Construction Inspector Andrew Nelson verifies the concrete thickness prior to a deck pour on a “flyover” ramp.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Participants in the Route 36 Opening Day 5K run in Macon.

EPG 643.3.17 Non-Invasive Digging

10/6/10: There is new guidance clarifying utilities' responsibility to determine the exact location of facilities on MoDOT right of way.

WO8-12 "No Center Stripe" Sign

10/6/10: Guidance for this sign was updated and clarified in EPG 616.2.2 and EPG 616.23.2.5.7.

Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures

10/6/10: This is a new test method, TM-83.

EPG 1026.2.1 Manufacturer Approval

10/6/10: Acceptance of precast drainage units (precast concrete box culverts) has been expanded to include National Precast Concrete Assn. (NPCA).

LPA UPdates

10/5/10: In EPG 136.1.2.1 Procedures, the time allowed to bring an LPA project from allocation to award was shortened; EPG 136.6.2 was revised to ensure compliance with the Brooks Act, etc. since failure to comply with procedures may result in loss of funding; new retainage guidanace was added in EPG 136.9.9.5; and materials testing requirements in 136.11.9 Materials Testing were updated.

Storm Water Pollution Prevention Plan (SWPPP) Updated

9/28/10: Guidance from current MoDOT training was added to the SWPPP. EPG 806.8.1 and EPG 806.8.4.2.5 were revised while EPG 806.8.4.4 and EPG 806.8.13 were added.

EPG 402 Bituminous Surface Leveling

9/24/10: In the PDFs of Contract Leveling Course Plan Templates (the "CLC Templates") near the top of EPG 402, Sheet 2 of 3 Traffic Control was updated to be in line with current guidance. JSP guidance was also updated.

Contract Leveling Course Guidance

9/21/10: The Contract Leveling Course Guidelines have been updated for FY 2011. Updated guidance for the associated JSP is also now available in EPG 402.

EPG 135 The Section 106 Process

9/8/10: EPG 135 now has Section 106 guidance for LPAs as well as for MoDOT projects.

Bulletin Boards and Required Notices and Job Posters

9/1/10: A binder may now also be used for mobile operations, although the standard bulletin board is always required for required notices and posters.

Recent Changes to LPA Policy

8/31/10: Keep up with changes to LPA Policy, even the minor ones, by checking on this listing in EPG 136.14.5.

EPG 143 Practical Design

8/26/10: A new, brief article is now available on how MoDOT efficiently spends its money.

Letters Advertising a Public Hearing

8/11/10: The "Letters Advertising a Public Hearing" link in EPG 129 Public Involvement has been updated.

EPG 402 Bituminous Surface Leveling

8/6/10: All 3 sheets of the Contract Level Course Plan Template have been revised.

New Way to Log into the EPG; No More EPG UserIDs

8/3/10: All MoDOT employees can now log into the EPG and access a number of capabilities including viewing the history of an article, leaving comments on a discussion page, tracking revisions through "my watchlist", accessing a printable version of an EPG article and viewing the "what links here" (that shows all the other articles linked to the chosen article).

EPG 109.12 Change Orders

7/29/10: Would you like additional details on change order approval levels? It is available in the new Change Order Approval Level Determination Chart.

Type 3 Offset Left Turn Lanes

7/26/10: EPG 233.2.5 has updated and expanded guidance for the Type 3 Offset Left Turn Lane median opening.

Contractor's Payroll Rate of Pay Guidance

7/15/10: Mo Dept of Labor rules require a contractor's employee's base plus fringe pay to be equal to or greater than the designated prevailing wage.

TA-26

7/14/10: TA-26 has been updated.

Turbidity Control and Chemical Stabilizers in the SWPPP

7/13/10: EPG 806.8 Storm Water Pollution Prevention Plan now has guidance for turbidity removal and chemical stabilizers.