User contributions for Smithk
Jump to navigation
Jump to search
5 August 2009
- 08:4408:44, 5 August 2009 diff hist +1 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1.2 Geopak Coordinate Database (a.k.a. GPK File): clarification, per CADD, both formats to be provided
- 08:1708:17, 5 August 2009 diff hist +207 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 Delivery of Electronic Design Data for GPS Grading: Per CADD, file size limitations specified in E 237.14.1.9 and additional file formats provided in E 237.14.1.2
4 August 2009
- 13:2813:28, 4 August 2009 diff hist +334 m Category:236 Right of Way article construction
- 10:1310:13, 4 August 2009 diff hist −33 m Main Page The minimum conductor size for power cable is now #8 AWG
- 08:1108:11, 4 August 2009 diff hist +134 m Category:132 Safety →132.1 Material Inspection for Safety: article construction
- 08:0808:08, 4 August 2009 diff hist 0 N File:132 Hearing Protection.pdf No edit summary current
- 07:3207:32, 4 August 2009 diff hist +54 m Category:132 Safety →132.1 Material Inspection for Safety: article construction
- 07:3207:32, 4 August 2009 diff hist 0 N File:132 Hand Protection.pdf No edit summary current
3 August 2009
- 15:1415:14, 3 August 2009 diff hist −1 m 121.3 The Statewide Transportation Improvement Program (STIP) article construction
- 14:3014:30, 3 August 2009 diff hist −315 m Main Page Updated (deleted the info of) TM 53, per CM. TM 53 was replaced in the 2008 specs and the guidance is no longer needed.
- 13:1413:14, 3 August 2009 diff hist 0 N File:138 Idea to Reality.jpg No edit summary current
- 13:1413:14, 3 August 2009 diff hist −8 m Category:138 Project Development Chronology Idea to Reality figure updated
- 10:3010:30, 3 August 2009 diff hist +13 m Category:235 Preliminary Plans article construction
- 10:2810:28, 3 August 2009 diff hist +13 m 234.1 Interchange Justification for Interstate Highways article construction
- 10:2810:28, 3 August 2009 diff hist +13 m 236.16 Outdoor Advertising →236.16.1 General Information: article construction
- 10:2610:26, 3 August 2009 diff hist 0 N File:123.1 Interstate history.jpg No edit summary current
- 10:2510:25, 3 August 2009 diff hist +527 m Category:123 Federal-Aid Highway Program article construction
31 July 2009
- 14:4014:40, 31 July 2009 diff hist −2 m 616.23 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): article construction
- 14:3714:37, 31 July 2009 diff hist +4 m Where to Find Construction and Materials Functions →Payment Documentation: article construction
- 14:3514:35, 31 July 2009 diff hist +10 m Category:106 Control of Material article construction
- 14:3014:30, 31 July 2009 diff hist −120 m Main Page article construction
- 13:3013:30, 31 July 2009 diff hist +7 m Main Page article construction
- 13:2913:29, 31 July 2009 diff hist +30 m Main Page article construction
- 13:1513:15, 31 July 2009 diff hist −66 m Category:100 GENERAL article construction
- 12:4712:47, 31 July 2009 diff hist +1,400 N Category:109 Payment Documentation Policy EPG 109 Measurement and Payment and 109.1 updated and consolidated into new EPG 109 Payment Documentation; no appreciable history, 1500/4700 previous hits, respectively
- 12:3812:38, 31 July 2009 diff hist +71 m Category:100 GENERAL article construction
29 July 2009
- 15:2615:26, 29 July 2009 diff hist −2 m Category:403 Asphaltic Concrete Pavement →403.1.5 Mixture Production Specification Limits (Sec 403.5): Revised, per CM, AASHTO T 328 to R47. This is current MoDOT practise and nationally recognized.
- 15:2015:20, 29 July 2009 diff hist −10 m 460.3 Plant Inspection →460.3.14 Asphalt Binder Content: Moisture Content, per CM, revised to reference AASHTO T 329 instead of TM 53. This is a recognized national standard.
- 15:0515:05, 29 July 2009 diff hist +132 m Category:501 Concrete →501.1.3 Sampling (Sec 501.4): Revisions, per CM, to bring guidance up to current practice.
28 July 2009
- 15:3515:35, 28 July 2009 diff hist +6 m Category:806 Pollution, Erosion and Sediment Control →806.7.4 Maintenance During Construction: article construction
- 15:3215:32, 28 July 2009 diff hist −16 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2.1 Construction Inspection for Diamond Grinding of Existing Portland Cement Concrete Pavement (Sec 622.30): article construction
- 15:3115:31, 28 July 2009 diff hist +383 m Category:806 Pollution, Erosion and Sediment Control article construction - addition of reference to new 608.6 SWPPP
- 15:2915:29, 28 July 2009 diff hist +14 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Borrow (Sec 203.3): article construction
- 15:0715:07, 28 July 2009 diff hist +501 m Main Page article construction
- 14:5914:59, 28 July 2009 diff hist +52,104 N 806.8 Storm Water Pollution Prevention Plan (SWPPP) SWPPP article info moved to new EPG 806.8; clarified 806.8.4 (when to inspect post-runoff), ditch checks added (806.8.4.2.3), and new inlet control, erosion stabl. mats and compost filter berms.
- 12:3012:30, 28 July 2009 diff hist −2 m Category:139 Design - Build →139.6 Design-Build and the Environmental Process: article construction
- 12:2812:28, 28 July 2009 diff hist −6 m 127.13 Noise →127.13.4.3 Date of Public Knowledge and Noise Abatement: article construction
- 12:2612:26, 28 July 2009 diff hist −20 m 127.3 Community Impact Assessment →127.3.2 Project Development Milestones: article construction
- 12:2412:24, 28 July 2009 diff hist −4 m Category:128 Conceptual Studies →128.2 Conceptual Study Report: article construction
- 12:2212:22, 28 July 2009 diff hist −90 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents article construction
- 10:5210:52, 28 July 2009 diff hist +26 m 103.1 Bid Opening and Award Process article construction
- 10:4910:49, 28 July 2009 diff hist −28 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2 Quality Control / Quality Assurance for Contract Ready Plans: article construction
- 10:4610:46, 28 July 2009 diff hist +12 m Engineering Professional Services Guidelines →A. Solicitation of Interest from Consultants: article construction
- 10:4310:43, 28 July 2009 diff hist +22 m Category:129 Public Involvement →129.11.1 Formal Public Hearings: article construction
- 10:3910:39, 28 July 2009 diff hist +66 m 236.3 Administration →236.3.2 Programming and Right of Way: article construction
- 10:3710:37, 28 July 2009 diff hist +143 m 238.1 Aerial Mapping and LiDAR Surveys →Table 238.1.15, Tolerances: article construction
- 10:2510:25, 28 July 2009 diff hist +13 m 643.4 Railroads →643.4.1.3 Rehabilitation, Resurfacing and Painting of Structures Over, On, or Under Railroads: article construction
- 10:2410:24, 28 July 2009 diff hist 0 m 237.6 Project Estimates →237.6.8 Non-Contractual Costs: article construction
- 10:2310:23, 28 July 2009 diff hist −19 m 237.6 Project Estimates →237.6.8 Non-Contractual Costs: article construction
- 10:1910:19, 28 July 2009 diff hist −3 m Category:104 Scope article construction