User contributions for Smithk
Jump to navigation
Jump to search
28 December 2009
- 13:1013:10, 28 December 2009 diff hist +16 m Category:645 Mailbox Turnouts and Supports updated Operations Engineer title to Construction and Materials Engineer
- 13:0913:09, 28 December 2009 diff hist +15 m Category:402 Bituminous Surface Leveling →402.2.9 Construction Requirements (Sec 402.10): updated Operations Engineer title to Construction and Materials Engineer
- 13:0713:07, 28 December 2009 diff hist +16 m 236.15 Requests from Cities for Annexations →236.15.1.2 Policy and Procedure: updated Operations Engineer title to Construction and Materials Engineer
- 13:0513:05, 28 December 2009 diff hist +32 m 320.1 Preliminary Geotechnical Report (PGR) →320.1.5.4 Report: updated Operations Engineer title to Construction and Materials Engineer
- 13:0313:03, 28 December 2009 diff hist +31 m Category:401 Bituminous Base and Pavement →401.1 Design: updated Operations Engineer title to Construction and Materials Engineer
- 13:0213:02, 28 December 2009 diff hist +48 m Category:1015 Bituminous Material updated Operations Engineer title to Construction and Materials Engineer
- 13:0013:00, 28 December 2009 diff hist +32 m Category:1018 Fly Ash for Concrete →1018.3 Report: updated Operations Engineer title to Construction and Materials Engineer
- 12:2612:26, 28 December 2009 diff hist +32 m Category:1050 Lumber, Timber, Piling, Posts and Poles →1050.3.2 Timber Products Inspected by Department Personnel: updated Operations Engineer title to Construction and Materials Engineer
- 12:2512:25, 28 December 2009 diff hist +48 m 617.3 Material Inspection for Sec 617 updated Operations Engineer title to Construction and Materials Engineer
- 12:2312:23, 28 December 2009 diff hist +48 m 413.1 Micro-Surfacing updated Operations Engineer title to Construction and Materials Engineer
- 12:1112:11, 28 December 2009 diff hist +183 m Category:1026 Reinforced Concrete Culvert Pipe Per CM, updated EPG to reflect change in specification; an alternative is allowed to the ACPA certification program
23 December 2009
- 09:3909:39, 23 December 2009 diff hist +449 m Talk:Main Page response
22 December 2009
- 08:4408:44, 22 December 2009 diff hist −39 m 903.5 Regulatory Signs 903.5.41 TRAFFIC SIGNAL Signs, "Or PUSH BUTTON FOR WALK SIGNAL (R10-4)" was removed from Options, since this sign is no longer used, per Traffic
18 December 2009
- 12:0312:03, 18 December 2009 diff hist −59 m Main Page No edit summary
- 12:0312:03, 18 December 2009 diff hist +40 m 236.13 Designing Right of Way Plans →236.13.8 Plan Requirements: attempt to establish a working link
- 12:0212:02, 18 December 2009 diff hist +55 m Main Page attempt to establish a working link
- 09:3509:35, 18 December 2009 diff hist +14 m Main Page No edit summary
- 09:3309:33, 18 December 2009 diff hist +1 m Main Page No edit summary
- 08:5008:50, 18 December 2009 diff hist −92 m Main Page E 236.13.8 revision
- 08:4308:43, 18 December 2009 diff hist −1 m 236.13 Designing Right of Way Plans →236.13.8 Plan Requirements: Per Photogrammetry, the accuracy level for non-surveyed parcels was decreased to 0.1 ac.
17 December 2009
- 10:2010:20, 17 December 2009 diff hist +153 m 232.2 Passing Lanes →232.2.3.2 Geometric Aspects: alternating passing lane sign photo added
- 10:1710:17, 17 December 2009 diff hist 0 N File:232.2.3.2.jpg No edit summary current
10 December 2009
- 11:3911:39, 10 December 2009 diff hist +17 m Help Article →EPG Approval Process: clarification
- 10:2710:27, 10 December 2009 diff hist +260 m Category talk:904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection No edit summary current
- 10:2010:20, 10 December 2009 diff hist +1,530 m Category:904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection →904.2 Certification Types.: Per CM, footnote added to tables to bring tables into compliance with EPG 137 archival guidance
9 December 2009
- 09:5509:55, 9 December 2009 diff hist +54 m 236.13 Designing Right of Way Plans clarification that major routes are not exclusively interstates and principle arterials
- 09:5109:51, 9 December 2009 diff hist +5 m 236.13 Designing Right of Way Plans →236.13.2.1 Major Routes: clarification that major routes are not exclusively interstates and principle arterials
8 December 2009
- 16:4316:43, 8 December 2009 diff hist +814 m Help Article →EPG Approval Process
- 11:2811:28, 8 December 2009 diff hist +130 m Talk:Main Page comment
- 11:2611:26, 8 December 2009 diff hist 0 m 135.5 Labor Compliance →Deductions: spelling correction
7 December 2009
- 15:0715:07, 7 December 2009 diff hist +418 m Main Page CM revision because Form C-214 are no longer used or available
- 14:4914:49, 7 December 2009 diff hist +18 m Category:239 Construction Inspection Guidelines for Final Plans →239.21.1 Resident Engineer's Office: Per CM, Form C-214 no longer used.
- 14:3314:33, 7 December 2009 diff hist −254 m Category:310 Aggregate Surface →310.1.5.3 Measurement by Weight (Mass): Per CM, "small" and "large" quantity methods combined into one to reflect current practice; also Form C-214 no longer used.
- 14:0714:07, 7 December 2009 diff hist 0 N File:136.5.8 RM17 Demonstration Project Agreement (Fig.5-8) Oct 2009.doc No edit summary current
- 14:0714:07, 7 December 2009 diff hist 0 N File:136.5.4 RM13 Off System Bridge Replacement (Fig.5-4) Oct 2009.doc No edit summary current
- 14:0614:06, 7 December 2009 diff hist 0 N File:136.5.3.1 RM12-SUP Transportation Enhancement Sup.doc No edit summary current
- 14:0614:06, 7 December 2009 diff hist +152 m 136.5 Agreements Per RM, updated Figs. 126.5.4 and 136.5.8 and added new Fig. 136.5.3.1 (a supplemental form)
- 09:1109:11, 7 December 2009 diff hist +121 m 903.7 Conventional Road Guide Signs →903.7.76 Historical Site Signs (MUTCD Section 2D.50b): per Traffic, add'l DNR sites added
4 December 2009
- 08:5708:57, 4 December 2009 diff hist +76 m 236.8 Relocation Assistance Program updated link to Relocation Report Form 236.8.6.4
- 08:5308:53, 4 December 2009 diff hist −7 m Category:101 Standard Forms →Relocation Assistance Program: updated link to Form 236.8.6.4
3 December 2009
- 15:3615:36, 3 December 2009 diff hist +4 m 103.1 Bid Opening and Award Process Design provided the newest link for the PS&E Due Date chart
- 14:0714:07, 3 December 2009 diff hist +115 m Category:101 Standard Forms →Right of Way: per RW, added Relocation Report Form 236.8.6.4
- 13:4513:45, 3 December 2009 diff hist −2 m 103.1 Bid Opening and Award Process updated links to PS&E Due Date and Reviewer's Checklist
2 December 2009
- 13:3513:35, 2 December 2009 diff hist −4 m LPA:136.8 Local Public Agency Land Acquisition →236.18.11.8 Contracting With Engineering Consultants for Right of Way Services: clarification ("manual" replaced)
- 10:0910:09, 2 December 2009 diff hist −2 m LPA:136 Local Public Agency (LPA) Policy new FHWA administrator
- 09:4709:47, 2 December 2009 diff hist −1 m LPA:136 Local Public Agency (LPA) Policy minor article revision
1 December 2009
- 16:3316:33, 1 December 2009 diff hist +684 m 127.1 Request for Environmental Services →127.1.1.2 Process: add'l DeRES info added, per Env'l
- 16:1216:12, 1 December 2009 diff hist 0 m 127.1 Request for Environmental Services →127.1.1.2 Process: minor edit
- 16:0916:09, 1 December 2009 diff hist −5 m 127.1 Request for Environmental Services →127.1.1.2 Process: per Environmental, submitting the electronic info via DeRES is now preferred to sending paper to Env'l/Historical
- 15:2815:28, 1 December 2009 diff hist −9 m 136.13 Glossary minor article edit