User contributions for Smithk
Jump to navigation
Jump to search
27 September 2010
- 10:4610:46, 27 September 2010 diff hist +89 m Category:133 Snow and Ice Control updated links
- 10:0610:06, 27 September 2010 diff hist +155 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: updated info about previous revision, per DE
- 09:5709:57, 27 September 2010 diff hist +82 m 234.6 Diverging Diamond Interchanges added links
24 September 2010
- 14:4614:46, 24 September 2010 diff hist 0 N File:402 CLC Templates Sep 24, 2010c.pdf No edit summary
- 14:4614:46, 24 September 2010 diff hist 0 m Category:402 Bituminous Surface Leveling another technical update folks
- 14:4414:44, 24 September 2010 diff hist 0 m Category:402 Bituminous Surface Leveling technical update
- 14:3414:34, 24 September 2010 diff hist 0 N File:402 Sep 2011 Contract Leveling Course Guidelines.doc No edit summary current
- 14:3414:34, 24 September 2010 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, CLC Guidelines updated
- 14:3014:30, 24 September 2010 diff hist +32 m Main Page EPG 402
- 14:2814:28, 24 September 2010 diff hist 0 N File:402 CLC Templates Sep 24, 2010b.pdf No edit summary
- 14:2814:28, 24 September 2010 diff hist 0 m Category:402 Bituminous Surface Leveling technical correction
- 14:2614:26, 24 September 2010 diff hist 0 N File:402 CLC Templates Sep 24, 2010a.pdf No edit summary
- 14:2614:26, 24 September 2010 diff hist 0 N File:402 JSP Sep 24 2010a.doc No edit summary current
- 14:2514:25, 24 September 2010 diff hist +2 m Category:402 Bituminous Surface Leveling technical update of files
- 14:0514:05, 24 September 2010 diff hist 0 N File:402 JSP Sep 24 2010.doc No edit summary current
- 14:0414:04, 24 September 2010 diff hist 0 m Category:402 Bituminous Surface Leveling Per DE, JSP further revised
- 14:0114:01, 24 September 2010 diff hist −364 m Main Page No edit summary
- 14:0114:01, 24 September 2010 diff hist +280 m Main Page EPG 402 revised
- 13:5413:54, 24 September 2010 diff hist 0 N File:402 CLC Templates Sep 24, 2010.pdf No edit summary
- 13:5413:54, 24 September 2010 diff hist +1 m Category:402 Bituminous Surface Leveling Per DE and Traffic, Sheet 2 of 3 Traffic Control CLC Templates updated to be in line with current guidance
23 September 2010
- 07:5807:58, 23 September 2010 diff hist +1 m 237.11 Signing and Sealing minor correction
22 September 2010
- 13:0113:01, 22 September 2010 diff hist +411 m Category:103 Award and Execution of Contract added external website link
- 12:4812:48, 22 September 2010 diff hist −140 m Category:100 GENERAL →100.1.1 MoDOT Organization: Per CM, removed a CM link
- 12:4512:45, 22 September 2010 diff hist +113 m 103.1 Bid Opening and Award Process added link to external MoDOT website
- 12:0412:04, 22 September 2010 diff hist −47 m Category:100 GENERAL →100.2 Division of Construction and Materials: updated link, per CM
- 10:5510:55, 22 September 2010 diff hist −47 m Category:100 GENERAL →100.1.1 MoDOT Organization: Per CM, updated link
21 September 2010
- 15:3815:38, 21 September 2010 diff hist +82 m Category:143 Practical Design added link
- 15:0215:02, 21 September 2010 diff hist 0 N File:402 JSP Sep 21 2010.doc No edit summary current
- 15:0115:01, 21 September 2010 diff hist +3 m Category:402 Bituminous Surface Leveling Per DE and Safe and Sound, JSP info further updated
- 12:5012:50, 21 September 2010 diff hist +80 m Main Page CLC guidance in EPG 402
- 12:4412:44, 21 September 2010 diff hist 0 N File:402 JSP Sep 2010.doc No edit summary current
- 12:4312:43, 21 September 2010 diff hist 0 N File:402 2011 Contract Leveling Course Guidelines.doc No edit summary current
- 12:4312:43, 21 September 2010 diff hist +1 m Category:402 Bituminous Surface Leveling minor correction
- 12:4212:42, 21 September 2010 diff hist −58 m Category:402 Bituminous Surface Leveling Per DE, updated CLC Guidelines and JSP
- 07:5707:57, 21 September 2010 diff hist 0 N File:236.5 Categorical Exclusion Review (Form 3-1.2) Sep 2010.doc No edit summary current
- 07:5607:56, 21 September 2010 diff hist +27 m 236.5 Property Management Per RW, updated Categorical Exclusion Form (Form 3-1.2).
20 September 2010
- 15:3315:33, 20 September 2010 diff hist +13 m Category:402 Bituminous Surface Leveling minor change
- 10:0810:08, 20 September 2010 diff hist +1,710 m Environmentally Friendly →MoDOT Recycles Roads and Bridges: added historic recycle info current
17 September 2010
- 12:1812:18, 17 September 2010 diff hist −4 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 12:1712:17, 17 September 2010 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links test
- 11:2011:20, 17 September 2010 diff hist −4 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 11:1911:19, 17 September 2010 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 11:1211:12, 17 September 2010 diff hist 0 N File:134.14.1.1.doc No edit summary current
- 11:1211:12, 17 September 2010 diff hist +78 m LPA:136.12 Figures, Glossary and Other Useful Links Per RM and LPA Coordinator, added Transportation Enhancement district contacts
- 10:0110:01, 17 September 2010 diff hist +280 m Help Article added "Finding Info" EPG video
- 09:5709:57, 17 September 2010 diff hist 0 N File:Help Finging EPG Info.wmv No edit summary current
- 09:5609:56, 17 September 2010 diff hist +302 m Main Page added "Finding Info" EPG video
16 September 2010
- 12:2812:28, 16 September 2010 diff hist +165 Category talk:504 Concrete Approach Pavement No edit summary current
- 12:2612:26, 16 September 2010 diff hist +286 m Category:504 Concrete Approach Pavement added link to std plan
15 September 2010
- 14:2014:20, 15 September 2010 diff hist +628 m Category:110 State and Federal Wage Rates and Other Requirements →Equipment Rental with Operator and Purchase Ordered Work: Per CM and ECR, guidance for prevailing wages off of the worksite