User contributions for Smithk
Jump to navigation
Jump to search
24 February 2011
- 15:3715:37, 24 February 2011 diff hist +441 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Per Geotechnical Section, added two reports for additional information
- 11:5411:54, 24 February 2011 diff hist 0 N File:136.14.2.1 Disadvantaged Business Enterprise Program Requirements for Local Programs Jan 2011.doc No edit summary current
- 11:5411:54, 24 February 2011 diff hist 0 N File:136.14.2.1 DBE Submittal Forms Jan 2011.doc No edit summary current
- 11:5311:53, 24 February 2011 diff hist +164 m LPA:136.12 Figures, Glossary and Other Useful Links Noted update
- 11:5111:51, 24 February 2011 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Updated DBE Submittal Form and Disadvantaged Busn. Enterprise Program form, per ECR
- 09:5609:56, 24 February 2011 diff hist −2 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Adopt-A-Highway: updated info
- 08:3108:31, 24 February 2011 diff hist +176 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.11.9 revision noted
- 08:2108:21, 24 February 2011 diff hist +104 m LPA:136.11 Local Public Agency Construction →136.11.9 Materials Testing: Minor correction, per LPA Coordinator
22 February 2011
- 13:0013:00, 22 February 2011 diff hist 0 N File:136.10.1 Checklist for Bid Proposal (Fig. 10-1R) Feb 2011.xls No edit summary current
- 12:5912:59, 22 February 2011 diff hist 0 m 136.10 Construction Authorization and Letting minor correction for Fig 136.10.1, per Design
- 12:0012:00, 22 February 2011 diff hist +12 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways minor clarification
18 February 2011
- 15:1515:15, 18 February 2011 diff hist −173 m Category:620 Pavement Marking →Pavement Marking Guidelines: Clarification, per Traffic
17 February 2011
- 16:3616:36, 17 February 2011 diff hist 0 m 141.7 Transportation Improvement Program Approval Minor correction, per Planning
16 February 2011
- 15:2815:28, 16 February 2011 diff hist 0 N File:134.3.2.1.4 Allowable Profit.pdf No edit summary
- 15:2715:27, 16 February 2011 diff hist 0 N File:134.3.2.1.4 Allowable Profit.jpg No edit summary current
- 15:2715:27, 16 February 2011 diff hist +135 m Category:134 Engineering Professional Services →134.3.2.1.4 Review of Consultant Proposal: A more easily readable chart is provided, per Design
- 14:4314:43, 16 February 2011 diff hist +148 m 616.27 Traffic Control for Field Operations →Table 616.23.2.2.2 Sign Spacing: minor update, per Traffic
15 February 2011
- 13:2513:25, 15 February 2011 diff hist +179 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Update of EPG 136.10.4 noted
- 13:2213:22, 15 February 2011 diff hist +13 m 136.10 Construction Authorization and Letting →136.10.4 On the Job Training (OJT): Per ECR, final trainee summary guidance updated
- 12:1312:13, 15 February 2011 diff hist +117 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: update to EPG 136.6 noted
- 12:1112:11, 15 February 2011 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.6.6 Contract Submittal: minor correction
- 12:1112:11, 15 February 2011 diff hist 0 N File:136.6.1 Contract (Fig. 6-1) Feb 2011.doc No edit summary current
- 12:1012:10, 15 February 2011 diff hist −19 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Design, again updated Fig. 136.6.1 Contract
- 11:0911:09, 15 February 2011 diff hist 0 N File:Digital Signature Frequently Asked Questions.doc No edit summary current
- 11:0811:08, 15 February 2011 diff hist +27 m Category:101 Standard Forms →Construction and Materials: Per CM: addition of QRG FAQ and removal of the Pay Quantity Certification since it will no longer be used
- 11:0411:04, 15 February 2011 diff hist −254 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.2 Guidelines: The Pay Quantity Certification will no longer be used, per CM
- 09:3609:36, 15 February 2011 diff hist +27 m Category:129 Public Involvement Per RW, update of verbiage in invitation letter
- 09:3309:33, 15 February 2011 diff hist 0 N File:Invitation to a Public Hearing Letter (236.10) Feb 2011.doc No edit summary current
- 09:3209:32, 15 February 2011 diff hist +690 m 236.10 Right Of Way Condemnation Per RW, update of verbiage in invitation letter
10 February 2011
- 16:1116:11, 10 February 2011 diff hist 0 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated link
- 16:0416:04, 10 February 2011 diff hist −32 m Main Page New EPG 105.19, Digital Signatures
- 15:5415:54, 10 February 2011 diff hist 0 N File:Digital Signature QRG8 for ROUTINE Adobe Digital Signature Contractor.doc No edit summary current
- 15:5415:54, 10 February 2011 diff hist 0 N File:Digital Signature QRG7 for ROUTINE Adobe Digital Signature MoDOT.doc No edit summary current
- 15:5315:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG6 for an INITIAL Adobe Digital Signature Contractor.doc No edit summary current
- 15:5315:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG5 for an INITIAL Adobe Digital Signature MoDOT.doc No edit summary current
- 15:5315:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG4 to prepare document for Contractor.doc No edit summary current
- 15:5315:53, 10 February 2011 diff hist 0 N File:Digital Signature QRG3c MoDOT authorized district level example signer list letter.doc No edit summary current
- 15:5215:52, 10 February 2011 diff hist 0 N File:Digital Signature QRG3b MoDOT authorized project office example signer list letter.doc No edit summary current
- 15:5215:52, 10 February 2011 diff hist 0 N File:Digital Signature QRG3a Contractor example signer list letter.doc No edit summary current
- 15:5215:52, 10 February 2011 diff hist 0 N File:Digital Signature QRG3 to Submit Certificate and List of Signers.doc No edit summary current
- 15:5115:51, 10 February 2011 diff hist 0 N File:Digital Signature QRG2 to set up Digital ID.doc No edit summary current
- 15:5115:51, 10 February 2011 diff hist 0 N File:Digital Signature QRG1 to Capture a Signature Image.doc No edit summary current
- 15:5115:51, 10 February 2011 diff hist +1,644 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, new QRGs for digital signatures
- 15:3615:36, 10 February 2011 diff hist +5,106 m Category:105 Control of Work Per CM, new 105.19 guidance: digital signature may be used to sign a change order or value engineering proposal
- 13:3713:37, 10 February 2011 diff hist −2 m 903.2 Regulatory Signs and Barricades (MUTCD Chapter 2B) Updated link to D-34
- 13:3313:33, 10 February 2011 diff hist 0 m Category:101 Standard Forms →Design: updated link to D-34
- 11:3211:32, 10 February 2011 diff hist +13 m Category:101 Standard Forms Per Design, again updated PSC Approval to Solicit Letter file
- 11:3111:31, 10 February 2011 diff hist 0 N File:134.3.1.1.2 PSC Approval to Solicit Letter Feb 10, 2011.doc No edit summary current
- 11:2911:29, 10 February 2011 diff hist +26 m Category:134 Engineering Professional Services →134.3 Engineering Professional Services Guidelines: Per Design, again updated PSC Approval to Solicit Letter file
- 10:5410:54, 10 February 2011 diff hist 0 N File:616.22 Sep 2010.jpg No edit summary current