User contributions for Smithk
Jump to navigation
Jump to search
8 June 2011
- 10:2510:25, 8 June 2011 diff hist −1 m Main Page No edit summary
- 10:2410:24, 8 June 2011 diff hist 0 N File:Main Page 3 June 8, 2011.jpg No edit summary current
- 10:2410:24, 8 June 2011 diff hist 0 N File:Main Page 2b June 8, 2011.jpg No edit summary current
- 10:2410:24, 8 June 2011 diff hist 0 N File:Main Page 2a June 8, 2011.jpg No edit summary current
- 10:2310:23, 8 June 2011 diff hist +279 m Main Page new photos
7 June 2011
- 09:4809:48, 7 June 2011 diff hist 0 N File:Main Page 4 June 2011.jpg No edit summary current
- 09:4809:48, 7 June 2011 diff hist −189 m Main Page new photo
- 09:1009:10, 7 June 2011 diff hist −97 m Main Page EPG 907.3
- 09:0709:07, 7 June 2011 diff hist +58 m 907.3 Travel Safe Zones →Recommendations: Traffic Safety Quality Circle recommends a min. length of 1 mile for the Travel Safe Zones.
6 June 2011
- 15:2715:27, 6 June 2011 diff hist +335 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.10.11
- 15:2215:22, 6 June 2011 diff hist +98 m 136.10 Construction Authorization and Letting →136.10.11 Bidder Qualification Language: Per LPA Coordinator, two subtitles added for clarification
2 June 2011
- 15:0015:00, 2 June 2011 diff hist +605 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: 2011 specbook update
- 14:5614:56, 2 June 2011 diff hist +74 m 136.13 Glossary link established
- 14:5014:50, 2 June 2011 diff hist 0 N File:136.10.1 Checklist for Bid Proposal (Fig. 10-1R) Jun 2011.xls No edit summary current
- 14:5014:50, 2 June 2011 diff hist −14 m 136.10 Construction Authorization and Letting Per LPA Coordinator, reference to specbook updated. Fig. 136.10.1 also updated so as not to refer to the 2004 specbook
- 14:4414:44, 2 June 2011 diff hist −5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.11 Plans, Specifications and Estimate (PS&E) Submittal: Per LPA Coordinator, reference to specbook updated
- 14:4214:42, 2 June 2011 diff hist −16 m 136.13 Glossary Per LPA Coordinator, reference to specbook updated
- 11:1111:11, 2 June 2011 diff hist +14 m Category:903 Highway Signing (MUTCD Part 2) No edit summary
- 11:0911:09, 2 June 2011 diff hist +145 m Category:903 Highway Signing (MUTCD Part 2) new sign shop tour video
- 11:0711:07, 2 June 2011 diff hist +93 m 606.2 Guard Cable new video
- 11:0211:02, 2 June 2011 diff hist +282 m Category:760 General Construction Inspection for Structures video of bridge construction
- 10:3210:32, 2 June 2011 diff hist +6 m 236.7 Negotiation Updated links to contract RW25, per RW
1 June 2011
- 09:1309:13, 1 June 2011 diff hist +20 m Main Page EEO Resource Manual
- 09:1009:10, 1 June 2011 diff hist +74 m Category:110 State and Federal Wage Rates and Other Requirements →110.5.2 Equal Employment Opportunity: link established
- 09:0409:04, 1 June 2011 diff hist 0 N File:110.5.2 Resource Manual.pdf No edit summary current
- 09:0409:04, 1 June 2011 diff hist −71 m Category:110 State and Federal Wage Rates and Other Requirements →110.5.2 Equal Employment Opportunity: CR updated Resource Manual.
31 May 2011
- 15:1315:13, 31 May 2011 diff hist 0 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.1 Intersection Sight Distance Criteria: Table clarified, per Traffic
- 10:3010:30, 31 May 2011 diff hist −79 m 321.3 Procedures for Estimation of Geotechnical Parameter Values and Coefficients of Variation →321.3.4 Variability Modifiers to Account for Quantity of Tests: figure added, per Geotechnical
- 10:2710:27, 31 May 2011 diff hist 0 N File:321.3.4.jpg No edit summary current
26 May 2011
- 15:2815:28, 26 May 2011 diff hist 0 N File:103.1.2 group.jpg No edit summary current
- 15:2815:28, 26 May 2011 diff hist −7 m 103.1 Bid Opening and Award Process →103.1.2 Bid Opening Location: new photo
- 14:1114:11, 26 May 2011 diff hist 0 N File:139 paseo april 2011.jpg No edit summary current
- 14:1014:10, 26 May 2011 diff hist +11 m Category:139 Design - Build →139.6 Design-Build and the Environmental Process: new photo
23 May 2011
- 15:2715:27, 23 May 2011 diff hist +450 m Category:910 Intelligent Transportation Systems Per EPG Group, added link to nonstandard JSP
- 14:5214:52, 23 May 2011 diff hist 0 N File:136.10.5 Federal Project Boilerplate Bid Proposal.doc No edit summary current
- 14:5114:51, 23 May 2011 diff hist +312 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Revision to EPG 136.10 noted.
- 14:4814:48, 23 May 2011 diff hist +959 m 136.10 Construction Authorization and Letting Per LPA Coordinator and Design, wage rate guidance in EPG 136.10.1 clarified. New boilerplate document added to EPG 136.10.2 so LPAs have a starting point for bid proposal documents.
- 09:2209:22, 23 May 2011 diff hist 0 N File:903.12.2.jpg No edit summary current
- 09:2109:21, 23 May 2011 diff hist +35 903.14 Emergency Management Signing added photo
20 May 2011
- 08:4408:44, 20 May 2011 diff hist +1 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: minor correction
18 May 2011
- 13:5513:55, 18 May 2011 diff hist +9 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Updated Fig. 136.6.1 Engineering Service Contract (overlooked the update in this box in Feb 2011)
- 13:3013:30, 18 May 2011 diff hist +54 m Category:239 Construction Inspection Guidelines for Final Plans →239.10.1 Pay Quantity (DWR) Entries: new QRG, per CM
- 13:2913:29, 18 May 2011 diff hist −53 m Category:105 Control of Work →105.9.3 Daily Work Reports: new QRG, per CM
- 13:2613:26, 18 May 2011 diff hist 0 N File:Daily Work Reports.doc No edit summary current
- 13:2613:26, 18 May 2011 diff hist +56 m Category:101 Standard Forms →Quick Reference Guides (QRGs): new QRG, per CM
16 May 2011
- 15:4015:40, 16 May 2011 diff hist −15 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Updated link to Form C-220, per CM
- 15:3715:37, 16 May 2011 diff hist −3 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: Updated C-220 link, per CM
- 15:3615:36, 16 May 2011 diff hist −618 m Category:105 Control of Work Preconstruction letter links and Erosion Control Inspection Record updated, per CM.
- 15:2515:25, 16 May 2011 diff hist −3 m Category:105 Control of Work CM updated link to Request to Subcontract Work
- 15:2415:24, 16 May 2011 diff hist −3 m Category:101 Standard Forms →Construction and Contractor Related: CM updated link to Request to Subcontract Work