User contributions for Smithk
Jump to navigation
Jump to search
29 September 2011
- 12:1812:18, 29 September 2011 diff hist +598 m 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance added "bridge jacking" video link
- 10:5110:51, 29 September 2011 diff hist 0 N File:136.14.3.1 Obligation Request Form.docx No edit summary
- 10:5010:50, 29 September 2011 diff hist +84 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: EPG 136.14.3.1
- 10:4910:49, 29 September 2011 diff hist +75 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Per Local Programs Administrator, Obligation Request Form added to "Commonly Used Forms"
- 10:2610:26, 29 September 2011 diff hist 0 m Main Page No edit summary
27 September 2011
- 14:1814:18, 27 September 2011 diff hist 0 N File:Main Page Sept 27, 2011.jpg No edit summary current
- 14:1814:18, 27 September 2011 diff hist −114 m Main Page new photo
- 10:5110:51, 27 September 2011 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.4 Links to Other Resources: Per Local Programs Administrator, the Federal Wage Rate link was updated
- 08:2608:26, 27 September 2011 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Sept 27, 2011.pdf No edit summary
- 08:2508:25, 27 September 2011 diff hist +4 m 236.7 Negotiation Per RW, Roster of Approved Contract Negotiators was updated
23 September 2011
- 14:3314:33, 23 September 2011 diff hist 0 N File:106.21.1 materials certifications.jpg No edit summary current
- 14:3314:33, 23 September 2011 diff hist +25 m 106.21 Summary of Materials Inspected →Figures: Per CM, updated "Materials Certifications" memo figure
- 13:3413:34, 23 September 2011 diff hist −12 m Help Article →Division Contacts: Per CM, update of contact
- 12:0612:06, 23 September 2011 diff hist 0 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process →127.23.1.1 Avoidance
- 12:0512:05, 23 September 2011 diff hist 0 N File:127.23.1.jpg No edit summary current
- 12:0412:04, 23 September 2011 diff hist +238 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process →127.23.1 Types of Commitments: added photo
22 September 2011
- 15:3815:38, 22 September 2011 diff hist +1 m Main Page No edit summary
21 September 2011
- 13:5913:59, 21 September 2011 diff hist 0 N File:616.20 Flagger Manual 2010.pdf No edit summary
- 13:5813:58, 21 September 2011 diff hist −4 m 616.20 Flagger Training Per Traffic, flagger training pdf updated
- 08:3708:37, 21 September 2011 diff hist 0 N File:751.8.3.2.3b Sept 2011.jpg No edit summary current
- 08:3608:36, 21 September 2011 diff hist 0 N File:751.8.3.2.3a Sept 2011.jpg No edit summary current
- 08:3608:36, 21 September 2011 diff hist 0 N File:751.8.1.4.2 Sept 2011.jpg No edit summary current
- 08:3508:35, 21 September 2011 diff hist +158 m 751.8 Concrete Box Culverts Per Bridge, Figs 751.8.1.4.2, Fig. 751.8.3.2.3a and Fig 751.8.3.2.3b updated
19 September 2011
- 09:1509:15, 19 September 2011 diff hist +215 m Main Page EPG 751.50 and EPG 620
- 08:5808:58, 19 September 2011 diff hist +24 m 751.50 Standard Detailing Notes →J. MSE Wall Notes: added link
- 08:5308:53, 19 September 2011 diff hist +382 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per Traffic, two notes added for clarification of table info
- 08:3908:39, 19 September 2011 diff hist +216 m 751.50 Standard Detailing Notes Per Bridge, J1.25 added to ensure we are giving the allowable bearing pressure (ABP) to the wall producers and contractors for design. The ABP will now be required to be shown on all MSE wall plans.
- 08:2808:28, 19 September 2011 diff hist +157 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, "Non-Destructive Testing" wording was clarified
- 07:5007:50, 19 September 2011 diff hist 0 N File:409 CSC Templates Sept 19, 2011.pdf No edit summary
- 07:5007:50, 19 September 2011 diff hist +4 m Category:409 Seal Coat Per Design, Seal Coat Template updated again
- 07:2807:28, 19 September 2011 diff hist 0 N File:409 JSP Sept 19, 2011.doc No edit summary current
- 07:2707:27, 19 September 2011 diff hist +4 m Category:409 Seal Coat Per Design, Seal Coat JSP updated
16 September 2011
- 07:3007:30, 16 September 2011 diff hist 0 m Main Page No edit summary
15 September 2011
- 09:0709:07, 15 September 2011 diff hist −1 m 751.9 Bridge Seismic Design →751.9.1.7 Directional Load Cases
14 September 2011
- 13:1913:19, 14 September 2011 diff hist +25 m Main Page EPG 409
- 13:0213:02, 14 September 2011 diff hist 0 N File:409 CSC Templates Sept 2011.pdf No edit summary
- 13:0113:01, 14 September 2011 diff hist 0 N File:409 JSP Sept 2011.doc No edit summary current
- 13:0113:01, 14 September 2011 diff hist +20 m Category:409 Seal Coat Per Design, the Seal Coat JSP and Templates were updated.
- 12:1412:14, 14 September 2011 diff hist +1 m Category:105 Control of Work →105.9.3 Daily Work Reports: Updated the type of QRG form, not the content
- 12:1212:12, 14 September 2011 diff hist 0 N File:Daily Work Reports June 2011.docx No edit summary
- 12:1112:11, 14 September 2011 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
13 September 2011
- 15:3115:31, 13 September 2011 diff hist 0 N File:751.24 LFD Retaining Walls Sept 2011.pdf No edit summary current
- 15:3115:31, 13 September 2011 diff hist +1 m 751.24 Retaining Walls Per Bridge, the correct design practice of showing sloped elevation lines for bottom of wall elevations has been added. Other revisions to the guidance are clarifications.
- 09:1909:19, 13 September 2011 diff hist 0 N File:236.11 Roster of Approved Contract Mediators (Form 11.2.3) Sept 13 2011.pdf No edit summary
- 09:1809:18, 13 September 2011 diff hist +8 m 236.11 Mediation Per RW, updated Roster of Approved Contract Mediators
12 September 2011
- 12:2412:24, 12 September 2011 diff hist 0 N File:236.7 Administrative Settlement Justification Letter.pdf No edit summary
- 12:2412:24, 12 September 2011 diff hist 0 m 236.7 Negotiation Per RW, Admin. Settlement Justification Letter form updated.
- 09:0209:02, 12 September 2011 diff hist +32 m Main Page EPG 754
- 08:5408:54, 12 September 2011 diff hist 0 N File:754 Exhibit 2 General Scope of Services.pdf No edit summary
- 08:5308:53, 12 September 2011 diff hist 0 N File:754 Exhibit 1 Estimate of Cost.pdf No edit summary