User contributions for Smithk
Jump to navigation
Jump to search
2 December 2011
- 13:5913:59, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.jpg No edit summary current
- 13:5713:57, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.jpg No edit summary current
- 13:5513:55, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Detail B.jpg No edit summary current
- 13:5413:54, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Part Section.jpg No edit summary current
- 13:5213:52, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section CC.jpg No edit summary current
- 13:5113:51, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section DD.jpg No edit summary current
- 13:4913:49, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Details of Post.jpg No edit summary current
- 13:4713:47, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Detail B.jpg No edit summary current
- 13:4613:46, 2 December 2011 diff hist 0 N File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section.jpg No edit summary current
- 13:4213:42, 2 December 2011 diff hist −31 751.40 LFD Widening and Repair →751.40.2.5 Filled Joints: Replacement of diagrams
- 13:4013:40, 2 December 2011 diff hist −83 m 751.40 LFD Widening and Repair →751.40.2.4.1 Cast-in-Place Deck: Replacement of diagrams
- 13:3113:31, 2 December 2011 diff hist +979 m 751.40 LFD Widening and Repair Per Bridge, numerous minor revisions to bring the EPG guidance into compliance with the standard plans for thrie beam.
1 December 2011
- 12:2412:24, 1 December 2011 diff hist 0 N File:751.32.4.2 part plan Dec 2011.jpg No edit summary current
- 12:2412:24, 1 December 2011 diff hist +9 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent: Correction of Part Plan detail,per Bridge
- 09:3109:31, 1 December 2011 diff hist +1 m Main Page No edit summary
- 09:0809:08, 1 December 2011 diff hist +1 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, clarified title for E 2.25
- 08:5508:55, 1 December 2011 diff hist +1 m 132.4 Highway Safety Plan and Performance Plan Updated link to highway safety plan
30 November 2011
- 10:3010:30, 30 November 2011 diff hist +22 m Category:144 Practical Operations →144.2 Signing Operations Changes: Added Sign Management System link
- 10:2810:28, 30 November 2011 diff hist +79 m Category:903 Highway Signing (MUTCD Part 2) added Sign Management System link
- 09:4509:45, 30 November 2011 diff hist +322 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.
- 09:4209:42, 30 November 2011 diff hist 0 N File:136.6.7 Sample Solicitation Nov 2011.docx No edit summary
- 09:4109:41, 30 November 2011 diff hist 0 N File:136.6.2 Consultant Selection Criteria (Fig. 6-2) Nov 2011.doc No edit summary current
- 09:3609:36, 30 November 2011 diff hist −2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LP Administrator, updated Fig. 136.6.2 Criteria for Evaluating Consultants and Fig. 136.6.7 Sample Solicitation.
- 09:1609:16, 30 November 2011 diff hist 0 N File:136.14.3.1 Obligation Request Form Nov 2011.docx No edit summary
- 09:1509:15, 30 November 2011 diff hist −696 m LPA:136.12 Figures, Glossary and Other Useful Links Per LP Administrator, the Obligation Request Form was updated
28 November 2011
- 10:4410:44, 28 November 2011 diff hist +115 m Category:101 Standard Forms →Construction and Materials: Per CM, added new form, Prestress Deficiency Report
23 November 2011
- 14:2314:23, 23 November 2011 diff hist +111 m Main Page EPG 751.14.5
- 14:0314:03, 23 November 2011 diff hist +5 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Clarification, per Bridge
- 13:5513:55, 23 November 2011 diff hist 0 N File:751.14 lateral bracing detail a.jpg No edit summary current
- 13:5413:54, 23 November 2011 diff hist 0 N File:751.14 longitudinal web stiffener.jpg No edit summary current
- 13:5413:54, 23 November 2011 diff hist 0 N File:751.14 int web stiffener.jpg No edit summary current
- 13:5313:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail a.jpg No edit summary current
- 13:5313:53, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 finger plate detail d.jpg No edit summary current
- 13:5213:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail a.jpg No edit summary current
- 13:5213:52, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - over 48 detail c.jpg No edit summary current
- 13:5113:51, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 42 thru 48.jpg No edit summary current
- 13:5013:50, 23 November 2011 diff hist 0 N File:751.14 end diaphragm - 36 thru 40.jpg No edit summary current
- 13:5013:50, 23 November 2011 diff hist 0 N File:751.14 End Diaphragm Connections.jpg No edit summary current
- 13:4913:49, 23 November 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - optional.jpg No edit summary current
- 13:4813:48, 23 November 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - preferred.jpg No edit summary current
- 13:4813:48, 23 November 2011 diff hist 0 N File:751.14 diaphragm connection.jpg No edit summary current
- 13:4713:47, 23 November 2011 diff hist 0 N File:751.14 Intermediate Diaphragm Connection Plate Optional.jpg No edit summary current
- 13:4613:46, 23 November 2011 diff hist 0 N File:751.14 Intermediate Diaphragm Connection Plate Preferred.jpg No edit summary current
- 13:4513:45, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - end diaphragms optional.jpg No edit summary current
- 13:4413:44, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - end diaphragms preferred.jpg No edit summary current
- 13:4413:44, 23 November 2011 diff hist 0 N File:751.14 bearing stiffener connections - no end diaphragms.jpg No edit summary current
- 13:4313:43, 23 November 2011 diff hist +7,861 m 751.14 Steel Superstructure →751.14.5 Details: Per Bridge, revised guidance for greater consistency. EPG 751.14.5.10 added to illustrate consistency in application.
- 13:1413:14, 23 November 2011 diff hist +8 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, re-aligned text
- 13:0813:08, 23 November 2011 diff hist +94 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: link added
- 13:0713:07, 23 November 2011 diff hist +125 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.3.1 Commonly Used Forms: Per LP Administrator, added link to Form 1590 FFATA