User contributions for Smithk
Jump to navigation
Jump to search
10 June 2013
- 13:3413:34, 10 June 2013 diff hist −1 m 903.7 Conventional Road Guide Signs →Table 903.7.51 Approved Missouri Scenic Byways
- 12:1712:17, 10 June 2013 diff hist +316 m LPA:136.13 LPA Policy Changes EPG 136.10.7
- 12:1412:14, 10 June 2013 diff hist +771 m LPA:136.10 Advertisement for Bid and Project Award 136.10.7; Per LPA, clarified DBE requirements at bid opening.
- 12:0412:04, 10 June 2013 diff hist −294 m Main Page EPG 903.7
- 11:2711:27, 10 June 2013 diff hist +275 m 903.7 Conventional Road Guide Signs →Table 903.7.51 Approved Missouri Scenic Byways: Per LPA, updated table of approved Mo Scenic Byways
- 11:2511:25, 10 June 2013 diff hist +201 m LPA:136.13 LPA Policy Changes EPG 136.3.8.7.2
- 11:2111:21, 10 June 2013 diff hist +1,168 m LPA:136.3 Federal Aid Basics →136.3.8.7.2 Project Eligibility and Selection: Per LPA, added table of updated approved Mo Scenic Byways
- 10:3210:32, 10 June 2013 diff hist 0 N File:Main Page 2 June 10, 2013.jpg No edit summary current
- 10:3110:31, 10 June 2013 diff hist 0 N File:Main Page June 10, 2013.jpg No edit summary current
- 10:3110:31, 10 June 2013 diff hist 0 N File:Main Page 3 June 10, 2013.jpg No edit summary current
- 10:3110:31, 10 June 2013 diff hist −70 m Main Page new photos
7 June 2013
- 14:2814:28, 7 June 2013 diff hist 0 m Category:751 LRFD Bridge Design Guidelines No edit summary
- 13:1713:17, 7 June 2013 diff hist +20 m Main Page No edit summary
- 08:4408:44, 7 June 2013 diff hist 0 N File:G20-5aP 2013.jpg No edit summary current
- 08:4308:43, 7 June 2013 diff hist +5 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Backup →616.6.12 Work Zone and Higher Fines Signs and Plaques (MUTCD 6F.12): Per Traffic, updated G20-5aP plaque
6 June 2013
- 11:0111:01, 6 June 2013 diff hist 0 m 236.3 Administration →236.3.4.5 Guideline for Determination of Hardship: minor correction
- 10:5410:54, 6 June 2013 diff hist 0 N File:616.25 WZ Coord Contacts June 2013.docx No edit summary
- 10:5410:54, 6 June 2013 diff hist +1 616.29 MoDOT Work Zone Guidelines Per Traffic, updated W
- 10:2610:26, 6 June 2013 diff hist +146 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 10:2410:24, 6 June 2013 diff hist −3 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:2310:23, 6 June 2013 diff hist 0 N File:136.9.3 June 2013.doc No edit summary
- 10:2310:23, 6 June 2013 diff hist −21 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor correction in the revision date of Fig. 136.9.3
- 09:5009:50, 6 June 2013 diff hist −80 m 236.3 Administration →236.3.4.2 Limited Acquisition Authority and Project Funding: Per RW, minor correction
- 09:3509:35, 6 June 2013 diff hist 0 File:Main Page June 6, 2013.jpg uploaded a new version of "Image:Main Page June 6, 2013.jpg" current
- 09:3509:35, 6 June 2013 diff hist 0 N File:Main Page June 6, 2013.jpg No edit summary
- 09:3409:34, 6 June 2013 diff hist −328 m Main Page EPG 824
- 09:0509:05, 6 June 2013 diff hist +349 m LPA:136.13 LPA Policy Changes EPG 136.4.2.5
- 09:0309:03, 6 June 2013 diff hist −293 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.5 Step 4 - Response to the RFQ: Per LPA, removed requirement to send e-verify w/ ea. letter of interest. Firms must now be prequalified. Part of prequalification is to e-verify documents.
- 08:4508:45, 6 June 2013 diff hist 0 N File:824 sponsor 2013.jpg No edit summary current
- 08:4508:45, 6 June 2013 diff hist −29 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Sponsor-A-Highway: official new sign
5 June 2013
- 13:1313:13, 5 June 2013 diff hist −153 m Category:626 Rumble Strips →626.2 Centerline Rumble Strips: Per CM, centerline rumble strips are permitted on joints. This brings guidance into compliance with Std. Plan 626.00.
- 11:0411:04, 5 June 2013 diff hist +34 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Sponsor-A-Highway: photo of new sign added
- 11:0311:03, 5 June 2013 diff hist 0 N File:824 new.jpg No edit summary current
- 10:4910:49, 5 June 2013 diff hist 0 N File:134.2.2.2 June 2013.doc No edit summary current
- 10:4910:49, 5 June 2013 diff hist +4 m Category:134 Engineering Professional Services Per Design, updated figure to change title to director from interim director
- 10:4010:40, 5 June 2013 diff hist +342 m LPA:136.13 LPA Policy Changes Access to Prequalification Processes info expanded in EPG 136.4
- 10:3710:37, 5 June 2013 diff hist +364 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, access to Prequalification Processes info expanded
- 10:1810:18, 5 June 2013 diff hist −2 m LPA:136.13 LPA Policy Changes No edit summary
- 10:1710:17, 5 June 2013 diff hist +206 m LPA:136.13 LPA Policy Changes new how-to-tutorial
- 10:1610:16, 5 June 2013 diff hist +177 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, new How-to tutorial
4 June 2013
- 15:0715:07, 4 June 2013 diff hist −8 m Category:110 State and Federal Wage Rates and Other Requirements →Professional Services: Per CM, further clarification
- 14:5314:53, 4 June 2013 diff hist +151 m 903.17 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): added links
- 14:3814:38, 4 June 2013 diff hist −3 m LPA:136.13 LPA Policy Changes updated link
- 14:3714:37, 4 June 2013 diff hist −3 m LPA:136.12 Figures, Glossary and Other Useful Links updated link
- 14:3714:37, 4 June 2013 diff hist −3 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 14:3614:36, 4 June 2013 diff hist −12 m 236.6 Appraisal and Appraisal Review updated links
- 13:2813:28, 4 June 2013 diff hist +140 m Main Page EPG 110.3
- 13:2313:23, 4 June 2013 diff hist +838 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, clarification on how to administer contract work performed by "Professional Services".
- 13:1313:13, 4 June 2013 diff hist +697 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarification on how to administer contract work performed by "Professional Services".
- 12:5012:50, 4 June 2013 diff hist 0 m 751.50 Standard Detailing Notes →H4. Conduit System: minor correction