User contributions for Hoskir
Jump to navigation
Jump to search
16 March 2023
- 13:1513:15, 16 March 2023 diff hist +41 147.3 Job Order Contracting (JOC) →147.3.6 Closing JOC Contracts: updated per RR 3567
- 13:0913:09, 16 March 2023 diff hist 0 N File:147.3.6 final cost.png No edit summary current
- 13:0213:02, 16 March 2023 diff hist −548 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: updated per RR 3567
- 09:5409:54, 16 March 2023 diff hist +47 m 905.3 Transportation Impact Analysis →905.3.7.3 TIS Report Template: updated TIS Report Template per RR 3667
- 09:5309:53, 16 March 2023 diff hist 0 N File:905.3.7.3 MoDOT Traffic Impact Study Report Template 06 17 2020 FINAL.docx No edit summary current
15 March 2023
- 12:5012:50, 15 March 2023 diff hist −36 m 127.25 Maintenance Environmental Policies →127.25.7.3 Lead Based Paint Abatement: updated link to Lead Abatement MoDOT Project Notification per RR 3665 current
14 March 2023
- 15:1615:16, 14 March 2023 diff hist −239 m 153.12 General Services updated per email from Jennifer Jorgensen on 3/14/23 removed MT14 it was a duplicate of GS12
- 11:3011:30, 14 March 2023 diff hist +736 153.9 Design No edit summary
13 March 2023
- 15:5515:55, 13 March 2023 diff hist +676 153.23 Utility updated per email from Jennifer Jorgensen on 3/13/23
- 15:3615:36, 13 March 2023 diff hist +44 m Category:153 Agreements and Contracts added administrative to box at top right per email from jennifer jorgensen
- 10:1610:16, 13 March 2023 diff hist −3,158 m 236.6 Appraisal and Appraisal Review →236.6.5.13 Fee Appraiser Performance Evaluation: updated per RR 3660
- 09:5809:58, 13 March 2023 diff hist +4 236.7 Negotiation →236.7.8.7 Contract Negotiator Performance Evaluation
- 09:5809:58, 13 March 2023 diff hist −1,610 m 236.7 Negotiation →236.7.8.7 Contract Negotiator Performance Evaluation: updated per RR 3660
- 09:1709:17, 13 March 2023 diff hist +220 m 236.7 Negotiation →236.7.8.1 Application for Employment as Contract Negotiator
- 09:1009:10, 13 March 2023 diff hist +216 m 236.6 Appraisal and Appraisal Review →236.6.5.3 Application for Employment as Contract Appraiser: updated per RR 3660
- 08:5108:51, 13 March 2023 diff hist −15 m 236.7 Negotiation →236.7.2.6 Improvements Acquired or Damaged: updated per RR 3660
- 08:3708:37, 13 March 2023 diff hist −834 236.5 Property Management →236.5.15 Methods for Disposal
- 08:1608:16, 13 March 2023 diff hist +818 236.5 Property Management →236.5.25 Leases, Licenses and Airspace License Agreements: updated per RR 3659
10 March 2023
- 11:2711:27, 10 March 2023 diff hist +37 m 751.50 Standard Detailing Notes →J1. General: updated per RR 3651
- 11:1611:16, 10 March 2023 diff hist 0 File:903.2a Signpost Selection Guide 2022.xls Hoskir uploaded a new version of File:903.2a Signpost Selection Guide 2022.xls current
9 March 2023
- 13:3413:34, 9 March 2023 diff hist +37 m 147.3 Job Order Contracting (JOC) →147.3.3 JOC Development: Job Special Provisions and Plan Sheets: updated per RR 3653
- 13:2213:22, 9 March 2023 diff hist 0 N File:148.3 3-9-23.png No edit summary current
- 13:0513:05, 9 March 2023 diff hist −248 m 147.3 Job Order Contracting (JOC) →147.3.2 Adjustment Factors: updated per RR 3653
- 12:2512:25, 9 March 2023 diff hist 0 m 751.1 Preliminary Design →Guidelines for Curb Blockout: added a space between (2016) and MASH
8 March 2023
- 09:2609:26, 8 March 2023 diff hist +661 m Recent Policy Changes in the EPG No edit summary
- 09:0909:09, 8 March 2023 diff hist +49 m 901.1 Lighting to be Provided, Operated, and Maintained at State Expense →901.1.2 Basic Lighting at Intersections Including Ramp Terminals at Crossroads: updated per RR 3649 current
7 March 2023
- 17:0217:02, 7 March 2023 diff hist 0 m 643.4 Railroads →643.4.1.14 Railroad Crossing Median Islands: updated per RR 3649
- 16:4716:47, 7 March 2023 diff hist +65 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.12 Islands: updated per RR 3649
- 15:5215:52, 7 March 2023 diff hist +334 Recent Policy Changes in the EPG No edit summary
- 15:4015:40, 7 March 2023 diff hist −180 m LPA:136.7 Design →136.7.5.1 Additive Alternates: updated JSP link
- 15:3815:38, 7 March 2023 diff hist −113 m LPA:136.7 Design →136.7.3.1.3 Supplemental Revisions Job Special Provision (JSP): updated JSP links
- 15:3015:30, 7 March 2023 diff hist −4,665 Category:405 Processing Reclaimed Asphalt updated per RR 3650 current
6 March 2023
- 15:3215:32, 6 March 2023 diff hist −48 m Recent Policy Changes in the EPG No edit summary
- 15:3015:30, 6 March 2023 diff hist 0 m Category:128 Conceptual Studies updated RES instructions per RR 3645
- 15:2715:27, 6 March 2023 diff hist 0 m Category:101 Standard Forms →Environmental and Cultural: updated link to RES Instruction Manual per RR 3645
- 15:2415:24, 6 March 2023 diff hist −2 m 127.1 Request for Environmental Services updated RES Instruction Manual per RR 3645
- 15:2215:22, 6 March 2023 diff hist +322 m 127.1 Request for Environmental Services →127.1.2.1 Location/Conceptual Plan Stage: updated per RR 3645
- 15:2115:21, 6 March 2023 diff hist 0 N File:2023-03-6 RES Instruction Manual.docx No edit summary
- 10:1510:15, 6 March 2023 diff hist +48 m Category:613 Pavement Repair →Hot Pour Polymer-Modified Resin-Based Material Alternate: updated JSP link current
- 09:4509:45, 6 March 2023 diff hist −49 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Backup →616.6.89 Radar Speed Advisory System (RSAS): updated JSP link
- 09:4309:43, 6 March 2023 diff hist −42 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Backup →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): updated JSP links
- 09:3109:31, 6 March 2023 diff hist −126 m 236.13 Designing Right of Way Plans →236.13.17 Demolition and Removal of Improvements: updated JSP link
- 09:2409:24, 6 March 2023 diff hist −208 m Category:409 Seal Coat updated JSP links
- 09:0109:01, 6 March 2023 diff hist −75 m 616.19 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Smart Work Zone (SWZ) Strategy Selection: updated JSP link
- 08:5608:56, 6 March 2023 diff hist −271 m Category:402 Bituminous Surface Leveling updated JSP links
- 08:4508:45, 6 March 2023 diff hist +46 m 902.14 Hybrid Beacons for Emergency-Vehicle Access (MUTCD Chapter 4N) →902.15.3.1.1 Project Details: updated JSP link
- 08:3708:37, 6 March 2023 diff hist −75 m 127.7 Threatened and Endangered Species →127.7.6.4 District Responsibilities: updated JSP link
3 March 2023
- 17:0017:00, 3 March 2023 diff hist +47 m Category:130 Value Engineering →130.3.1 Project Selection and PAVE Workplan: updated JSP link
- 16:5616:56, 3 March 2023 diff hist −43 m 231.4 Shoulder Width →231.4.3.2 Design: updated JSP links current
- 16:5216:52, 3 March 2023 diff hist −8 m 237.9 Submission of Plans and Supporting Documents →237.9.3.4 Roadway JSP Submittal Process: updated JSP link