User contributions for Hoskir
Jump to navigation
Jump to search
21 November 2024
- 15:3415:34, 21 November 2024 diff hist +27 N File:106.3.2.93.1 Potentially Expansive Aggregate Limits-01.png File uploaded with MsUpload current
- 15:2915:29, 21 November 2024 diff hist +714 Category:1005 Aggregate for Concrete updated per RR3933 current
- 15:2815:28, 21 November 2024 diff hist +211 Category:1001 General Requirements for Material updated per RR3933 current
- 15:2015:20, 21 November 2024 diff hist +90 Recent Policy Changes in the EPG No edit summary
- 15:1615:16, 21 November 2024 diff hist −779 751.40 LFD Widening and Repair updated per RR3945 current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.3.1 sec through end bent.png File uploaded with MsUpload current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.3.1 elev int bent.png File uploaded with MsUpload current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.2.6 section thru barrier.jpg File uploaded with MsUpload current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.2.6 detail A.jpg File uploaded with MsUpload current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.2.2 nonhydro part-plan.png File uploaded with MsUpload current
- 15:1115:11, 21 November 2024 diff hist +27 N File:751.40.2.2 hydro part-plan.png File uploaded with MsUpload current
- 15:0215:02, 21 November 2024 diff hist +536 Recent Policy Changes in the EPG No edit summary
- 14:4614:46, 21 November 2024 diff hist +279 Recent Policy Changes in the EPG No edit summary
- 13:5013:50, 21 November 2024 diff hist +490 751.50 Standard Detailing Notes →I1. General: added note I1.18 per RR3936
- 13:3913:39, 21 November 2024 diff hist +1,172 Recent Policy Changes in the EPG No edit summary
- 13:0413:04, 21 November 2024 diff hist +541 Recent Policy Changes in the EPG No edit summary
- 12:5412:54, 21 November 2024 diff hist +149 751.50 Standard Detailing Notes →G5b Open Ended Cast-in Place (OECIP) Concrete Pile: updated per RR3913
- 12:5312:53, 21 November 2024 diff hist +148 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile: updated per RR3913
- 12:4912:49, 21 November 2024 diff hist −6 751.39 Pile Footings →751.39.6.2 Pile Pull-out Force: updated per RR3913 current
- 12:4612:46, 21 November 2024 diff hist −350 751.36 Driven Piles →751.36.5.7.2.2 Design Values for Individual Cast-In-Place (CIP) Pile: updated per RR3913 current
- 12:4212:42, 21 November 2024 diff hist +305 751.36 Driven Piles →751.36.5.7.1.2 Design Values for Individual Cast-In-Place (CIP) Pile: updated per RR3913
- 12:3712:37, 21 November 2024 diff hist +11 751.36 Driven Piles →751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile: updated per RR3913
- 12:3312:33, 21 November 2024 diff hist +233 Category:702 Load-Bearing Piles →702.1.1 Cast-In-Place (CIP) Concrete Piles (Sec 702.2.1): updated per RR3913 current
- 12:1512:15, 21 November 2024 diff hist −1,643 903.6 Warning Signs →903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.09): updated per RR3901 current
- 11:5911:59, 21 November 2024 diff hist +332 Recent Policy Changes in the EPG No edit summary
- 11:2211:22, 21 November 2024 diff hist +636 642.14 ADA Transition Plan updated per RR3957 current
- 10:2010:20, 21 November 2024 diff hist +224 Recent Policy Changes in the EPG No edit summary
- 10:1710:17, 21 November 2024 diff hist +92 Category:403 Asphaltic Concrete Pavement →403.1.5 Mixture Production Specification Limits (Sec 403.5): updated per RR3956 Clarifiying TSR information for sample records
- 09:2609:26, 21 November 2024 diff hist +367 Recent Policy Changes in the EPG No edit summary
- 09:1709:17, 21 November 2024 diff hist +256 751.1 Preliminary Design →751.1.2.8 Box Culverts: updated per RR3954
20 November 2024
- 15:5715:57, 20 November 2024 diff hist +444 Recent Policy Changes in the EPG No edit summary
- 15:4615:46, 20 November 2024 diff hist −818 Category:108 Prosecution and Progress →108.16.1 Informational Dates: updated per RR3955
19 November 2024
- 12:5212:52, 19 November 2024 diff hist −142 Category:109 Measurement and Payment →109.12.1 Change Order Preparation: removed C06 link per RR3958
- 12:4912:49, 19 November 2024 diff hist −41 Category:109 Measurement and Payment →109.11 Compensation for Project Delays (for Sec 109.11)
- 12:4712:47, 19 November 2024 diff hist −80 Category:109 Measurement and Payment →109.10 Contract Assignment Process - Contract Reassignment to a New Contractor (for Sec 109.10)
- 12:4212:42, 19 November 2024 diff hist −74 Category:109 Measurement and Payment →109.6 Method of Payment (for Sec 109.6): removed sharepoint link and update biditem listing link
- 12:4012:40, 19 November 2024 diff hist −40 Category:109 Measurement and Payment →109.5.2 Daily Force Account Record, Equipment and Materials Account: removed sharepoint link
- 12:3812:38, 19 November 2024 diff hist +1 Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1)
- 12:3712:37, 19 November 2024 diff hist +67 Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): updated per RR3958
- 12:0512:05, 19 November 2024 diff hist −140 Category:101 Standard Forms →Quick Reference Guides (QRGs): removed AWP C06 per RR3958
- 11:5211:52, 19 November 2024 diff hist +2 Job Special Provisions No edit summary
- 11:3911:39, 19 November 2024 diff hist −1,025 103.2 Contract Bond for Sec 103.4 updated per RR3958 current
- 11:0811:08, 19 November 2024 diff hist −64 Category:109 Measurement and Payment →109.12.2 Change Order Approval: updated per RR3958 (removed adjustment of mobilization)
- 10:5810:58, 19 November 2024 diff hist −229 Category:618 Mobilization deleted link to EPG 103.2 per RR3958 (removing article 103.2) current
13 November 2024
- 11:0511:05, 13 November 2024 diff hist −57 m Category:948 Incident Response Plan and Emergency Response Management updated link to MoDOT Communications Standard Operating Guideline current
12 November 2024
- 10:2610:26, 12 November 2024 diff hist +245 m Category:801 Lime and Fertilizer →Material (Sec 801.2): updated link to Missouri Agricultural Liming Materials Reports current
7 November 2024
- 14:5214:52, 7 November 2024 diff hist −6 Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.2 Procedure: updated links to forms current
- 11:1211:12, 7 November 2024 diff hist −44 m Category:900 TRAFFIC CONTROL →Introduction: updated link to Managing Access to Missouri's Highways
6 November 2024
- 09:1909:19, 6 November 2024 diff hist −1 m Category:618 Mobilization →Payment Schedule - Calculation of Percent Complete: removed extra (
5 November 2024
- 10:2010:20, 5 November 2024 diff hist +13 620.1 General (MUTCD Chapter 3A) No edit summary current