Category:216 Removals for Bridge Structures
Contents
- 1 216.1 Construction Inspection Guidance for Sec 216
- 1.1 Removal of Bridges (Sec 216.10)
- 1.2 Scarification of Bridge Decks (Sec 216.20)
- 1.3 Seal Coat and Wearing Surface Removal (Sec 216.30)
- 1.4 Removal and Storage of Existing Bridge Rails (Sec 216.40)
- 1.5 Removal of Existing Bridge Decks (Sec 216.50)
- 1.6 Partial Removal of Existing Bridge Decks (Sec 216.60)
- 1.7 Partial Removal of Culvert and Substructure Concrete (Sec 216.70)
- 1.8 Curb Removal (Sec 216.80)
- 1.9 Removal of Existing Expansion Joints and Adjacent Concrete (Sec 216.90)
- 1.10 Removal of Existing Expansion Joint Seal or Sealant (Sec 216.100)
216.1 Construction Inspection Guidance for Sec 216
Removal of Bridges (Sec 216.10)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Scarification of Bridge Decks (Sec 216.20)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Seal Coat and Wearing Surface Removal (Sec 216.30)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal and Storage of Existing Bridge Rails (Sec 216.40)
Description
As specified.
Storage Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Bridge Decks (Sec 216.50)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Partial Removal of Existing Bridge Decks (Sec 216.60)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Partial Removal of Culvert and Substructure Concrete (Sec 216.70)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Curb Removal (Sec 216.80)
Description
As specified.
Material
As specified.
Removal Requirements
As specified
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Expansion Joints and Adjacent Concrete (Sec 216.90)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Expansion Joint Seal or Sealant (Sec 216.100)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.