614.5 Maintenance of Floodgates

From Engineering_Policy_Guide
Revision as of 12:15, 3 February 2017 by Smithk (talk | contribs) (Per MT, updated articles having links to Maintenance Agreements due to the eAgreements SharePoint site.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Floodgates installed by MoDOT shall be maintained by MoDOT regardless of the reason for the installation. Floodgates installed by others shall be maintained by the installer unless MoDOT has agreed to maintain the flood gate through written agreement. The standard contract form MT-16 FLOOD GATE AGREEMENT shall be used when establishing maintenance responsibilities for a floodgate. The agreement template is available in eAgreements.