Main Page
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | |
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest. |
EPG 123.1.1 FHWA Oversight - National Highway System 7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19. EPG 237.14.3.6 Electronic Design Data for MoDOT Construction 7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted. EPG 618 Basis of Payment for Mobilization 6/29/18: New guidance clarifies how REs should administer payment for mobilization. EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri 6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added. EPG 238.2.17 Professional Land Surveyor Review 6/26/18: Guidance was clarified with current business practices. Design of Elastomeric Bearings' Anchor Bolts 6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate. EPG 751.50 Standard Detailing Notes 6/1/18: Note B3.2 was clarified. EPG 751.10.3 Bridge Deck Drainage - Slab Drains 5/24/18: Guidance now states the allowed slab drain color coatings. EPG 106.12 PAL Material Arrival Confirmation 5/22/18: Pre-Acceptance Identification Tag guidance was clarified to allow for identifying PAL material shipped to MoDOT projects. EPG 806.7 Temporary Erosion Control Blankets Design Guidance 5/17/18: The types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types based on the region, length of slope and the necessary blanket duration. 2-loop and 3-loop Concrete Barriers 5/17/18: In EPG 616.19.2.5 Temporary Traffic Barriers and EPG 617.2 Construction Inspection Guidelines for Sec 617, guidance was clarified for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones. Design Agreements and Contracts 5/14/18: Those who need to review DE43, DE44 and DE46-49 prior to contractual execution has been updated. Three new Federal Aid Projects Posters 5/11/18: Three new posters are required to be displayed on Federal-Aid project sites: Uniformed Services Employment and Reemployment Rights Act (USERRA), Pay Transparency Nondiscrimination Provision (English) and Pay Transparency Nondiscrimination Provision (Spanish). EPG 110.3.4 Missouri DOL Form PW-2 5/9/18: New guidance agreed to by the DOL is now available about the DOL's PW-2 form. 5/9/18: Guidance about guardrail placement from the edge of the shoulder was clarified. EPG 751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating 5/3/18: New bridge preliminary design guidance for assessing asbestos and lead considerations for structure removal, rehabs and recoatings as well as how to address these considerations on the Bridge Memorandum. EPG 237.14.3.6 Electronic Design Data for MoDOT Construction 5/2/18: Guidance about the initial request for the Construction files has been clarified. Outdoor Advertising 4/30/18: Guidance in EPG 236.16.8.5 Vegetation Site Inspection, EPG 236.16.15.4 Cutting of Vegetation, EPG 236.16.15.6 Trimming of Trees and EPG 236.16.15.9 Releasing a Vegetation Permit have been impacted by Administrative Rule revisions. EPG 102.2.7 Performance Discussion 4/27/18: Guidance for when certified mail is necessary for the Contractor Performance Rating has been updated. EPG 751.50 Standard Detailing Notes 4/25/18: A new standard detailing note about deviations in galvanized pile penetration is now available. EPG 903.4.6 Span, Cantilever and Butterfly Box Trusses 4/16/18: Guidance about drilled shaft footings has been clarified. MoDOT may be the designer of the footing and if not, others will have to submit signed and sealed drawings. EPG 751.50 Standard Detailing Notes 4/13/18: In EPG 751.50 D. Temporary Bridge, revisions include a new clarifying note D1.5 and replacing an archaic option in D1.21 with the current option. In EPG 751.50 H9. Thrie Beam and Other Rail Types, revisions include the new H9.29 for two thrie beam standard drawings. EPG 751.8.3.4 Wing Walls on Rock 4/11/18: New guidance for culvert wing walls on rock is now available. Inclusion of DOL Wage Rates In Contracts 4/10/2018: In EPG 110.1 Wage Rates, guidance about including the correct wage rate order from the Dept. of Labor on MoDOT projects was updated. Special Watersheds where MoDOT has been assigned a Wasteload Allocation 4/9/18: Guidance to go with the MDNR permit agreement has been added. Project Bulletin Board Inspection Rate 4/5/18: The bulletin board inspection rate was revised from every two months to every three months. |