Main Page

From Engineering_Policy_Guide
Revision as of 12:13, 25 September 2018 by Smithk (talk | contribs) (EPG 110.3)
Jump to navigation Jump to search
EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

EPG 110.3 Equipment Rental with Operator and Purchase Ordered Work

9/25/18: Guidance about which certified payrolls are required for rental equipment operators was clarified.

Bridge Survey Checklist

9/24/18: Guidance about the Bridge Survey Checklist was clarified in EPG 238.3.36 Bridge Surveys, EPG 747.2.2.1 Bridge Survey Report, EPG 747.2.3 Bridge Survey Sheet Data, EPG 747.2.3.4 Profile Sheets and EPG 750.3.1.1.2.6 Other Bridges.

EPG 236.14.4.3 Submittal

9/20/18: Additional guidance is now available for district staff on when to include a Change in Route Marking Report.

EPG 236.5.25.4 Marketing Properties for Lease

9/20/18: Guidance has been added to permit a new clause in the lease.

Saw Cut Joints

8/31/18: Guidance in EPG 751.12.2.7 Joint Details, EPG 751.12.2.8 Plastic Waterstop and EPG H10. Barrier Curbs – Safety, Median, Type C and D was revised to allow saw cut joints for conventional-formed barrier curbs.

EPG 236.3.4.4 Advance Acquisition, State Funded Early Acquisition

8/27/17: Guidelines related to MAP-21 have been provided to bring guidance up to current practice.

EPG 106.9, When does Buy America apply to manufactured items?

8/16/18: Guidance has been added to EPG 106.9 Buy America Requirement clarifying when Buy America applies to manufactured items.

EPG 231.2 Clear Zones

8/14/18: Clear zone guidance has been clarified and associated figures have been updated.

LFD Bridge Seismic Design Process Flowchart

8/14/18: In EPG 756 Seismic Design, updated this flowchart to include, among other changes, new superstructure replacement guidance.

EPG 231.8 Bridge Width

8/13/18: EPG 231.8 is now coordinated with Green Book guidance that clear bridge widths shall be the same as the approach roadway widths for collectors, arterials and freeways.

EPG 806 Pollution, Erosion and Sediment Control

8/7/18: All of EPG 806 (except for EPG 806.8 SWPPP) has been completely rewritten to clarify land disturbance requirements and policies necessary to comply with MoDOT's current land disturbance practices.

Impact Attenuators and Sand Barrel Arrays

8/7/18: Sand barrel impact attenuator setup will now be based on the manufacturer's recommendations instead of MoDOT's standard plans. Work zone durations have been revised. New guidance clarifies when the flashing arrow panel and lights on the TMA should be active.

Work Zone Duration and TA-35 Mobile Operation

8/7/18: Guidance was clarified in EPG 616.7.2 Work Duration and EPG 616.23.2.6.1 Duration of Work about which traffic control devices are needed based on the work duration. TA-35 was updated to include an additional TMA with added guidance for which operations TA-35 can be used.

EPG 123.1.1 FHWA Oversight - National Highway System

7/27/18: Information for Projects of Division Interest (PoDI) has been updated for FY19.

EPG 237.14.3.6 Electronic Design Data for MoDOT Construction

7/25/18: Guidance was updated to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures were deleted.

EPG 618 Basis of Payment for Mobilization

6/29/18: New guidance clarifies how REs should administer payment for mobilization.

EPG 236.7.5.4 Acquisition from Conservation Commission and the University of Missouri

6/28/18: Comments about MoDOT acquiring property from the Univ. of MO and Dept. of Conservation were added.

EPG 238.2.17 Professional Land Surveyor Review

6/26/18: Guidance was clarified with current business practices.

Design of Elastomeric Bearings' Anchor Bolts

6/5/18: ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.

EPG 751.50 Standard Detailing Notes

6/1/18: Note B3.2 was clarified.

EPG 751.10.3 Bridge Deck Drainage - Slab Drains

5/24/18: Guidance now states the allowed slab drain color coatings.

EPG 106.12 PAL Material Arrival Confirmation

5/22/18: Pre-Acceptance Identification Tag guidance was clarified to allow for identifying PAL material shipped to MoDOT projects.

EPG 806.7 Temporary Erosion Control Blankets Design Guidance

5/17/18: The types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types based on the region, length of slope and the necessary blanket duration.

2-loop and 3-loop Concrete Barriers

5/17/18: In EPG 616.19.2.5 Temporary Traffic Barriers and EPG 617.2 Construction Inspection Guidelines for Sec 617, guidance was clarified for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.

Design Agreements and Contracts

5/14/18: Those who need to review DE43, DE44 and DE46-49 prior to contractual execution has been updated.