Recent Policy Changes in the EPG

From Engineering_Policy_Guide
Revision as of 09:28, 19 December 2019 by Smithk (talk | contribs) (EPG 236.3.12)
Jump to navigation Jump to search

EPG 236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS)

12/19/19: This new guidance documents the established practice of initiating consultant right of way acquisition and relocations services.

EPG 103.1.2.1 Emergency Work Procurement Process

12/18/19: New Emergency Work Procurement Process guidance reflecting established practice is now available.

EPG 136.4.1.6 Conflict of Interest

12/16/19: Clarified guidance by adding information pertaining to when a consultant acts as a city engineer.

EPG 237.14 Electronic Design Data Delivery

12/13/19: Guidance has been updated to reflect the use of the latest design software version.

Form 806.8.2, Project-Specific SWPPP Information

12/13/19: This form (presented in EPG 806.8 and EPG 101) now has a new page for REs/Inspectors to identify the BMPs that will be used on a project.

EPG 237.14.1 MoDOT and Consultant Electronic Design Data Requirements

12/12/19: Electronic Design Data guidance was clarified.

EPG 751.6.2.5 Concrete

12/3/19: Guidance about rounding of concrete quantities for superstructure was clarified. Guidance was added to subtract concrete displaced by CIP piles.

Reinforcement Details

12/2/19: Reinforcement details were updated in EPG 751.9.3.1.7 T-Joint Connections, EPG 751.31.1 and EPG 751.31.3 and EPG 751.32.4 Reinforcement to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Alternate end bent reinforcement details for shallow structures were added in EPG 751.35.3.3 through EPG 751.35.4.4.

EPG 751.50 Standard Detailing Notes

11/21/19: Guidance about underlined portions of notes was added.

EPG 146.3.2.3 Commercially Useful Function (CUF)

11/19/19: The location for storing CUF documents was updated from the archaic V: drive to eProjects.

EPG 751.11.2.1 Elastomeric Bearings Taper

11/14/19: The illustrations have been revised to clarify the maximum allowed taper.

New QRG

11/14/19: The new AWP MA Sample Record Acceptance By Certification QRG is now available.

EPG 105.9.3 Daily Work Reports

11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.

EPG 236.5.28.3 Compensation for Changes in Access and EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals

10/28/19: Guidance has been clarified to better reflect current practices.

AASHTOWare

10/25/19: Guidance in EPG 105.9 Authority and Duties of Resident Engineer and EPG 105.9.3 Daily Work Reports now allows for the expanded opportunities of the AWP.

Drilled Shafts

10/23/19: Guidance in EPG 751.37.1.6 Drilled Shaft General Detail Considerations was expanded and clarified.

EPG 121.7 Program Estimates

10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge. Program estimate documentation and supporting documentation must be stored in e-Projects.

Estimating Guidance Updates

10/21/19: Estimating guidance in EPG 104.7 Scoping Estimates and EPG 121.7 Program Estimates was updated with optional spreadsheets to assist the districts with their scoping and estimating processes. The Project Scoping Form and Resurfacing Per Mile Scoping Form are now available.

TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device and Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device

10/21/19: These TAs have been updated in EPG 616.8.1 Listing of Typical Applications for Maintenance to show that two Portable Signal Flagging Devices are always required.

Additional Mobilization for Seeding

10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.

EPG 505.1.4 Polyester Polymer Concrete (PPC)

10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.

EPG 109.12.5 Change Order Time Extension for Extreme Events

9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.

EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)

9/18/19: Guidance has been updated to conform with the new BEAP contract.

Abbreviations used by Design

9/5/19: Design Abbreviations are now presented in EPG 237 Contract Plans.

Bridge Contract Plans

9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to EPG 751.5.1.4 Contract Plan File Name Convention. The guidance in EPG 751.1.4 was re-titled and moved to EPG 751.5.1.7 Contract Addendums and Construction Changes.