This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

Search results

Jump to navigation Jump to search
  • |'''Bridge Deck, Sealer''' ...ridge Preventative Maintenance|R322 Bridge Seal Coats Maintenance Planning Guidelines]]. ...
    714 bytes (85 words) - 14:54, 18 August 2020
  • Temporary bridge deck repair is done to fill the holes in the deck to prevent the accumulati ...s possible. Repairs should be completed with higher urgency than routing maintenance as weather permits. Consult the patching materials manufacturer’s guide for ...
    2 KB (263 words) - 12:16, 22 June 2022
  • |align="center" colspan="2"|[[Image:771.14 Spot Painting of Bearings and Pilings1.jpg]] |[[Image:771.14 Spot Painting of Bearings and Pilings2.jpg|400px]] || [[Image:771.14 Spot Painting of Bearings and Pilings3.jpg|400px]] ...
    2 KB (335 words) - 08:25, 22 June 2022
  • Bridge cleaning and flushing is done to remove dirt and debris to allow proper dra ...hs when needed and temperatures safely permit. Thorough cleaning of entire bridge should be accomplished in the spring following snow season and again in the ...
    6 KB (907 words) - 08:48, 13 December 2021