This is MoDOT's Engineering Policy Guide Test Site. Do not use the information on this site. Click Here to access MoDOT's current Engineering Policy Guide.

Talk:108.1 Project Dates

From Engineering_Policy_Guide
Jump to navigation Jump to search

The Construction Division requires a key date for Recorded Survey when new ROW is acquired on a project. The definitions section does not list this key date. Can it be added? Thanks!