Difference between revisions of "Category:616 Temporary Traffic Control"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per Traffic, updated Fig 616.1.4 Begin/End of Project showing that "Drive Smart" signs have been replaced with the new "Rate Our Work Zone" signs.)
m (Per Traffic, removed archaic "Work Zone Fine signing sequence" figure. The current figure is still available at EPG 616.12.3.4.)
Line 37: Line 37:
 
|colspan="4"|'''Work Zone Figures'''
 
|colspan="4"|'''Work Zone Figures'''
 
|-
 
|-
|[[media:616 Sign and Device Legend, Mar 6, 2012.pdf|Sign and Device Legend]]||[[media:616.0.1 Truck and Equipment Crossing Apr 2011.pdf|temporary truck crossing]]||[[media:616.0.2 Lane Closure Feb 2011.pdf|lane closure]]||[[media:616.0.3 Temporary Road Closure Feb 2011.pdf|temporary road closure]]
+
|[[media:616 Sign and Device Legend, Mar 6, 2012.pdf|Sign and Device Legend]]||[[media:616.0.1 Truck and Equipment Crossing Apr 2011.pdf|Temporary truck crossing]]||[[media:616.0.2 Lane Closure Feb 2011.pdf|Lane closure]]||[[media:616.0.3 Temporary Road Closure Feb 2011.pdf|Temporary road closure]]
 
|-
 
|-
||[[media:616.0.4 Shoulder Work Feb 2011.pdf|shoulder work]]|||[[media:616.0.5 Lane Restriction Feb 2011.pdf|lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction Apr 2011.pdf|public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|lane widening or addition]]
+
||[[media:616.0.4 Shoulder Work Feb 2011.pdf|Shoulder work]]|||[[media:616.0.5 Lane Restriction Feb 2011.pdf|Lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction Apr 2011.pdf|Public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|Lane widening or addition]]
 
|-
 
|-
|[[media:616.0.8 Lane Shift Feb 2011.pdf|lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving Operations on Highway Open to Traffic Feb 2011.pdf|moving operations on highway open to traffic]]||[[media:616.0.11 Temporary Connection at Terminus of Divided Lane Facilities Feb 2011.pdf|temporary connection at terminus of divided lane facilities]]
+
|[[media:616.0.8 Lane Shift Feb 2011.pdf|Lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving Operations on Highway Open to Traffic Feb 2011.pdf|Moving operations on highway open to traffic]]||[[media:616.0.11 Temporary Connection at Terminus of Divided Lane Facilities Feb 2011.pdf|Temporary connection at terminus of divided lane facilities]]
 
|-
 
|-
 
||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing Apr 2011.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End.pdf|Beginning and End of Project]]
 
||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing Apr 2011.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End.pdf|Beginning and End of Project]]
 
|-
 
|-
|[[media:Figure 616.2.1.2 Side Road Tapers.pdf|Side Road Tapers]]||[[media:616.2.1 Road Closed Beyond april 2011.pdf|a typical detour]]||[[media:616.2.2 Two-lane Undivided Highway Feb 2011.pdf|Two-Lane Undivided Highway]]||[[media:616.2.3 Work Zone Fine Sign.pdf|WORK ZONE FINE signing sequence]]
+
|[[media:Figure 616.2.1.2 Side Road Tapers.pdf|Side Road Tapers]]||[[media:616.2.1 Road Closed Beyond april 2011.pdf|A typical detour]]||[[media:616.2.2 Two-lane Undivided Highway Feb 2011.pdf|Two-Lane Undivided Highway]]|||[[media:616.2.4 Signs in NarrowMedians.pdf|Guidance for signs in narrow medians]]
 
|-
 
|-
|[[media:616.2.4 Signs in NarrowMedians.pdf|guidance for signs in narrow medians]]||[[media:616.2.6 One-Lane Two-way Operation Apr 2011.pdf|One-Lane Two-Way Operation]]||[[media:616.13 Crossover On Divided Feb 2011.pdf|Crossovers on Divided Highways]]||[[media:Estimate Based Documentation Records.doc|Estimate Based Documentation Records]]
+
|[[media:616.2.6 One-Lane Two-way Operation Apr 2011.pdf|One-Lane Two-Way Operation]]||[[media:616.13 Crossover On Divided Feb 2011.pdf|Crossovers on Divided Highways]]||[[media:Estimate Based Documentation Records.doc|Estimate Based Documentation Records]]||
 
|}
 
|}
  

Revision as of 10:40, 16 May 2013


Attention to the safety of travelers is especially important in work zones.

The workspace is the area closed to traffic and set aside for workers, equipment and material. Work zone signing items such as regulatory signs and Type III Movable Barricades and other work zone items such as Changeable Message Signs, flashing arrow panels, channelizing devices, lighting devices and signals are specially designed to minimize risk to workers and travelers. Pavement edge treatment is frequently included in work zones as are practices such as crossovers, temporary connections and detours.

The work zone duration and location of work are discussed in this article. There are many aspects to be considered when inspecting construction quality and this article provides construction inspection guidelines.

Work Zone Enhancement Software
Report, 2010
See also: Innovation Library

Temporary traffic control devices warn motorists of hazards, advise the proper path through the work area, delineate areas where travelers may not operate and separate them from workers and opposing traffic. Whenever worn or damaged devices appear in a work zone, the general quality of the work zone deteriorates. To avoid this, MoDOT has provided quality standards for temporary traffic control devices.

To provide uniform flagging and to train employees how to protect themselves, co-workers and travelers, MoDOT requires flagger training.

Every day MoDOT has many work zones on Missouri's highways. MoDOT is committed to providing safe and efficient movement of both motorized and non-motorized traffic through or around temporary traffic control work zones and providing protection for workers and equipment located within these work zones. To better educate technicians and those designing and managing temporary traffic control work zones, Work Zone Technician Training, Advanced Work Zone Training, MoDOT Work Zone Guidelines and Work Zone User Training is available.

Work Zone Customer Survey
Traffic has developed the Work Zone Customer Survey to take advantage of travelers viewing MoDOT work zones. The Work Zone Customer Survey has been revised so that reviewing work zones is even easier. You can keep our work zones safe and efficient by submitting your information directly from the survey's website location or by printing, filling out and mailing the report card.

This article also provides law enforcement services, traffic control for non-motorized traffic and transit considerations.

Traffic Control for Field Operations, contains information on temporary traffic control measures.

Work Zone Figures
Sign and Device Legend Temporary truck crossing Lane closure Temporary road closure
Shoulder work Lane restriction Public road crossing another road under construction Lane widening or addition
Lane shift Standard Temporary Connection for Transition from Single to Dual Lane Moving operations on highway open to traffic Temporary connection at terminus of divided lane facilities
Traffic Control Work Zone Sign Spacing Device Spacing Intermediate Lane Closure Beginning and End of Project
Side Road Tapers A typical detour Two-Lane Undivided Highway Guidance for signs in narrow medians
One-Lane Two-Way Operation Crossovers on Divided Highways Estimate Based Documentation Records

2009 MUTCD Compliance

Due to changes within the 2009 MUTCD, MoDOT has implemented the required use of several new signs. The following table provides the future (new) sign, current (old) sign and the final compliance date for all entities to be incompliance.

New Sign Old Sign Compliance Date
616 WO20-5a.jpg 616 WO20-5a old.jpg December 22, 2013
WO20-5a WO20-5a
616 WO8-17.jpg 616 WO8-9a.jpg December 22, 2013
WO8-17 & WO8-17P WO8-9
616 WO12-2a.jpg 616 WO12-3a.jpg December 22, 2013
WO12-2a WO12-3a & WO12-3b
616 WO8-12.jpg 616 WO8-12 old.jpg December 22, 2013
WO8-12 WO8-12
616 GO20-5aP.jpg 616 GO23-1.jpg December 22, 2013
GO20-5aP GO23-1
616 WO8-15.jpg 616 Special.jpg December 22, 2013
WO8-15 & WO8-15P Special