Difference between revisions of "237.7 Equipment and Materials List"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (updated link)
 
(Per Bidding and Contract, revision will now require designers to include the D-15 in the Electronic Deliverables.)
Line 11: Line 11:
 
|}   
 
|}   
  
All projects containing permanent highway lighting or traffic signal items or temporary lighting and signal items retained by the Commission require an [[media:D-15.doc|Equipment and Materials List (Form D-15)]].  Form D-15 can be found in the Design Forms category of the Design Forms on the computer system.  Form D-15 is to be condensed by the district.  When condensed, only the pertinent lighting and signal items on the project will remain on Form D-15.  This form is to be accompanied with a [[media:Fig 237.7 (4-03.6) Example Equip & Materials List Cover ltr.doc|cover letter]] cover letter and be submitted to Design with final design plans. The contractor will be responsible for completing the form by listing the products to be used on the project.
+
All projects containing permanent highway lighting or traffic signal items or temporary lighting and signal items retained by the Commission require an [[media:D-15 2013.doc|Equipment and Materials List (Form D-15)]].  Form D-15 and its [[media:Fig 237.7 (4-03.6) Example Equip & Materials List Cover ltr.doc|cover letter]], are automatically generated when the project line items are created in the Bid Tabs program.Form D-15 and cover letter are to be submitted to Central Office Design as part of the electronic deliverables file (see [[237.9 Submission of Plans and Supporting Documents#237.9.3.3.3 Electronic Deliverables File|EPG 237.9.3.3.3 Electronic Deliverables File]]). The contractor will be responsible for completing the form by listing the products to be used on the project.  
  
Form D-15 is used for permanent lighting and signal equipment.  This form is not to be used for temporary lighting, signals or other work zone related items that will be removed before the project is completed, unless the items will be retained by the Commission.  Instructions for completing this form can be found attached to the end of Form D-15.
+
Form D-15 is used for permanent lighting and signal equipment.  This form is not to be used for temporary lighting, signals or other work zone related items that will be removed before the project is completed, unless the items will be retained by the Commission.   
  
 
Refer to Salvage Materials for additional [http://wwwi/maintenance/ Maintenance] information.
 
Refer to Salvage Materials for additional [http://wwwi/maintenance/ Maintenance] information.
  
 
[[category:237 Contract Plans|237.07]]
 
[[category:237 Contract Plans|237.07]]

Revision as of 16:01, 9 February 2018

Figure
cover letter
Form
Equipment and Materials List (Form D-15)

All projects containing permanent highway lighting or traffic signal items or temporary lighting and signal items retained by the Commission require an Equipment and Materials List (Form D-15). Form D-15 and its cover letter, are automatically generated when the project line items are created in the Bid Tabs program.Form D-15 and cover letter are to be submitted to Central Office Design as part of the electronic deliverables file (see EPG 237.9.3.3.3 Electronic Deliverables File). The contractor will be responsible for completing the form by listing the products to be used on the project.

Form D-15 is used for permanent lighting and signal equipment. This form is not to be used for temporary lighting, signals or other work zone related items that will be removed before the project is completed, unless the items will be retained by the Commission.

Refer to Salvage Materials for additional Maintenance information.