Category:1115 Polyethylene Plastic Pipe Liner: Difference between revisions
From Engineering Policy Guide
m Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info |
upgrade |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{|style="padding: 0.3em; margin-left:1px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px | <div style="float: right; margin-top: 5px; margin-left: 30px; margin-bottom: 30px;">__TOC__</div> | ||
{|style="padding: 0.3em; margin-left:1px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" | |||
|- | |- | ||
|'''MGS Information''' | |'''MGS Information''' | ||
Line 17: | Line 19: | ||
General Services may require a hard copy of the AWP report as proof of acceptance of this material. Inspectors should communicate with General Services to assure their payment procedures are satisfied and to ensure the materials requirements as satisfied on a per purchase order basis. | General Services may require a hard copy of the AWP report as proof of acceptance of this material. Inspectors should communicate with General Services to assure their payment procedures are satisfied and to ensure the materials requirements as satisfied on a per purchase order basis. | ||
[[Category:1100 Maintenance Materials|1115]] |
Latest revision as of 07:16, 28 August 2024
MGS Information |
Current General Services Specifications (MGS) By Subject |
This article establishes procedures for inspecting and reporting of polyethylene plastic pipe liners. The specification requirements are set forth in the bid request issued by General Services.
1115.1 Procedure
Field inspection is to follow the procedures laid out in EPG 1046 Pipe Liner.
1115.2 Report
The report of this material will be made in AASHTOWARE Project (AWP) following EPG 106.20 Reporting.
General Services may require a hard copy of the AWP report as proof of acceptance of this material. Inspectors should communicate with General Services to assure their payment procedures are satisfied and to ensure the materials requirements as satisfied on a per purchase order basis.
This category currently contains no pages or media.